ChecklistGuro logo ChecklistGuro Soluciones Industrias Recursos Precios

Underground Mine Ventilation Checklist

Ensure safe and compliant underground operations. Our Underground Mine Ventilation Checklist streamlines assessments, mitigates risks, and helps you meet regulatory requirements - all in one easy-to-use template. Protect your team and optimize airflow with confidence.

Esta plantilla se instaló 2 veces.

Estilo de visualización

Pre-Shift Ventilation Checks

1 of 9

Initial assessment of ventilation system functionality before shift commencement.

Date of Inspection

Inspection Start Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Ventilation Control Room Location

Main Fan Operational Status

Auxiliary Fan Operational Status

Main Fan Amperage (A)

Auxiliary Fan Amperage (A)

Notes/Observations

Inspector Signature

Airflow Monitoring

2 of 9

Measurement and verification of airflow rates at designated locations.

Airflow Rate (m³/s)

Static Pressure (Pa)

Fan Status

Temperature (Celsius)

Monitoring Date

Monitoring Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Monitoring Location (Ventilation Point)

Notes/Observations

Ventilation Controls Inspection

3 of 9

Examination of ventilation controls, including fans, dampers, and regulators.

Fan 1 RPM

Fan 2 RPM

Damper 1 Position (Open/Closed/Partially Closed)

Damper 2 Position (Open/Closed/Partially Closed)

Air Pressure at Regulator A (kPa)

Notes on Control Operation or Issues

Last Calibration Date (Regulator A)

Inspector Signature

Dilution Ventilation Assessment

4 of 9

Evaluation of ventilation effectiveness in diluting gases and dust.

Methane Concentration (ppm)

Oxygen Concentration (%)

Carbon Dioxide Concentration (%)

Dust Concentration (mg/m³)

Ventilation Effectiveness (Qualitative)

Observations & Notes

Dilution Ventilation Control Status

Fire Suppression Ventilation Checks

5 of 9

Verification of fire suppression ventilation system readiness.

Fire Suppression Fan Status

Fire Suppression Fan RPM

Fire Water Spray Nozzle Condition

Last Fire Suppression System Test Date

Time of Fire Suppression System Activation (if applicable)

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Notes on Fire Suppression Ventilation System Performance

Emergency Ventilation Procedures

6 of 9

Review and confirmation of emergency ventilation procedures and equipment.

Emergency Ventilation System Activation Procedure Reviewed?

Time to Activate Emergency Ventilation (minutes)

Brief Description of Actions Taken During Emergency Ventilation Activation

Date of Last Emergency Ventilation Drill

Time of Last Emergency Ventilation Drill Start

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Emergency Ventilation Routes Verified Clear?

Signature of Person Verifying Emergency Ventilation Procedures

Ventilation Obstruction Checks

7 of 9

Inspection for obstructions that may impede airflow.

Location of Obstruction Check (e.g., Face, Return Airway)

Potential Obstruction Types Observed

Description of Obstruction (if any)

Estimated Obstruction Size (e.g., in meters/feet)

Obstruction Clearance Status

Date of Clearance (if applicable)

Time of Clearance (if applicable)

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Inspector Signature

Gas Monitoring Equipment Calibration

8 of 9

Validation of gas monitoring equipment accuracy and functionality.

Calibration Date

Span Gas Concentration (ppm)

Zero Gas Concentration (ppm)

Reading at Zero Gas (ppm)

Reading at Span Gas (ppm)

Calibration Successful?

Calibration Notes (if applicable)

Calibrator Signature

Equipment ID

Documentation & Record Keeping

9 of 9

Review of ventilation logs, maintenance records, and incident reports.

Check Date

Check Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Previous Incident Count (Last 12 Months)

Summary of Findings/Observations

Supporting Documentation (e.g., airflow readings, gas monitoring reports)

Corrective Actions Required?

Description of Corrective Actions (If Yes)

Inspector Signature

¿Le resultó útil esta plantilla de lista de verificación?

Demostración de la Solución de Gestión Minera

¡Maximice la eficiencia y la seguridad en las operaciones mineras! ChecklistGuro optimiza la gestión de tareas, el seguimiento de equipos y la elaboración de informes de cumplimiento. Optimice los flujos de trabajo, reduzca los riesgos y aumente la productividad. Administre todo con nuestro Work OS.

Plantillas de listas de verificación relacionadas

Podemos hacerlo juntos

¿Necesita ayuda con las listas de verificación?

¿Tienes alguna pregunta? Estamos aquí para ayudarte. Envía tu consulta y te responderemos a la brevedad.

Correo electrónico
¿Cómo podemos ayudarte?