Energy Storage System Monitoring Process

Optimize your grid stability and-maximize asset lifespan with our comprehensive Energy Storage System (ESS) Monitoring Process. Learn how real-time data tracking, predictive maintenance, and automated performance analytics ensure seamless energy management, prevent thermal runaway, and drive operational efficiency in large-scale battery storage deployments.

Inicio
1. Fetch Battery Sensor Data
2. Fetch System Thresholds
3. Calculate State of Health (SoH)
4. Calculate Average Cell Temperature
5. Check Threshold Violation
6. Create Incident Log
7. Assign Technician Inspection
8. Create Inspection Checklist
9. Notify Operations Center
10. Emergency SMS Alert
11. Update Incident Status
12. Generate Daily Health Report
13. Update System Logs
Fin

Inicio del flujo de trabajo/proceso.

Retrieve the latest voltage, current, and temperature readings from the Battery Management System (BMS) data model.

Retrieve predefined safety threshold values (e.g., Max Temp, Min SoC) from the Configuration data model.

Calculate the current degradation level using voltage and cycle count variables.

Calculate the average temperature across all individual battery cell entries to detect thermal anomalies.

Compare the aggregated temperature and current voltage against the retrieved threshold values.

Create a new entry in the 'Incidents' data model if a threshold violation is detected.

Create a high-priority task for the On-site Maintenance Engineer to inspect the hardware.

Attach a specific 'Thermal Inspection' checklist to the technician's task.

Send an urgent email alert to the Operations Center with the details of the detected anomaly.

Send an SMS notification to the duty manager for immediate awareness of critical system failure.

Update the status of the Incident Log entry to 'In Progress' once the task is acknowledged.

Generate a summary report containing aggregated performance metrics for the last 24 hours.

Update the historical performance data model with the newly calculated SoH and performance metrics.

Fin del flujo de trabajo/proceso.

Gestión de Energía
Descargar plantilla como:

¿Le resultó útil esta plantilla de flujo de trabajo?

Resume y analiza esta plantilla de flujo de trabajo con

Demostración de la Solución de Gestión de Energía

Gestionar las operaciones, la seguridad y el cumplimiento en el sector energético es fundamental. La plataforma Work OS de ChecklistGuro optimiza su flujo de trabajo, desde la exploración y la producción hasta la distribución y el mantenimiento. Mejore la seguridad, aumente la eficiencia y garantice el cumplimiento de las normas. ¡Descubra cómo ChecklistGuro puede transformar su negocio energético!

Plantillas de flujo de trabajo relacionadas

Podemos hacerlo juntos

¿Necesita ayuda con las listas de verificación?

¿Tienes alguna pregunta? Estamos aquí para ayudarte. Envía tu consulta y te responderemos a la brevedad.

Correo electrónico
¿Cómo podemos ayudarte?