| Created by checklistguro.com | | |
| | | |
| Pre-Installation Assessment & Preparation (STEP) | | |
| Site Inspection Date (DATE) | | |
| Detailed Site Conditions Report (TEXT) | | |
| Foundation Elevation (ft) (NUMBER) | | |
| Soil Type (SELECTION options: Clay, Sand, Silt, Gravel, Loam, Other) | | |
| Existing Drainage Assessment (if applicable) (TEXT) | | |
| Previous Waterproofing Systems (if any) (SELECTION options: None, Bituminous Coating, Membrane, Other) | | |
| Site Survey/Topography Map (UPLOAD) | | |
| Contractor License Number (TEXT) | | |
| | | |
| Surface Preparation (STEP) | | |
| Existing Condition Description (TEXT) | | |
| Surface Contaminants Present (Check All That Apply) (SELECTION options: Dirt/Debris, Oil/Grease, Mold/Mildew, Efflorescence, Existing Coatings, Other (Specify in Long Text)) | | |
| Describe Remediation Steps for Contaminants (TEXT) | | |
| Surface Roughness (SPI Value) (NUMBER) | | |
| Surface Preparation Method Used (SELECTION options: Brush Cleaning, Pressure Washing, Grinding, Other (Specify in Long Text)) | | |
| Photographic Evidence of Prepared Surface (UPLOAD) | | |
| Moisture Content of Surface (SELECTION options: Dry, Slightly Damp, Damp, Wet, N/A) | | |
| | | |
| Waterproofing Membrane Application (STEP) | | |
| Ambient Temperature During Application (Fahrenheit) (NUMBER) | | |
| Surface Temperature During Application (Fahrenheit) (NUMBER) | | |
| Application Method (SELECTION options: Spray Applied, Roller Applied, Brush Applied) | | |
| Coating Thickness (Dry Film Thickness, mils) (NUMBER) | | |
| Detailed Notes on Application Process (e.g., any deviations from manufacturer's instructions) (TEXT) | | |
| Photographic Evidence of Membrane Application (Multiple Images) (UPLOAD) | | |
| Membrane Coverage (Full/Partial) (SELECTION options: Full, Partial) | | |
| Describe any observed defects or irregularities during application (TEXT) | | |
| | | |
| Joint & Crack Treatment (STEP) | | |
| Crack Width Assessment (inches) (SELECTION options: < 1/8, 1/8 - 1/4, 1/4 - 1/2, > 1/2) | | |
| Crack Treatment Method (SELECTION options: Epoxy Injection, Polyurethane Foam, Hydraulic Cement, Flexible Sealant, Other (Specify in LONG_TEXT)) | | |
| If 'Other' Treatment Method Selected, Please Specify: (TEXT) | | |
| Depth of Crack Treatment (inches) (NUMBER) | | |
| Photo Documentation of Crack Treatment (UPLOAD) | | |
| Joint Type (SELECTION options: Control Joint, Construction Joint, Expansion Joint, Other) | | |
| Notes on Joint Treatment (if 'Other' selected) (TEXT) | | |
| | | |
| Drainage System Installation (STEP) | | |
| Drainage System Type (SELECTION options: Perimeter Drain with Gravel, French Drain, Dimple Board System, Other (Specify in Long Text)) | | |
| Gravel Depth (inches) (NUMBER) | | |
| Drain Pipe Diameter (inches) (NUMBER) | | |
| Description of Drainage Slope and Route (TEXT) | | |
| Filter Fabric Used? (SELECTION options: Yes, No) | | |
| Photo of Drain Pipe Installation (UPLOAD) | | |
| Outlet Discharge Point Confirmed? (SELECTION options: Yes, No) | | |
| Comments on Drainage System Installation (if any) (TEXT) | | |
| | | |
| Protection & Backfilling (STEP) | | |
| Description of Protective Layer Installation (e.g., geotextile, sand) (TEXT) | | |
| Minimum Protective Layer Thickness (inches) (NUMBER) | | |
| Backfill Material Type (SELECTION options: Clean Sand, Gravel, Other (Specify)) | | |
| Notes regarding compaction of backfill material. (TEXT) | | |
| Date of Backfilling Completion (DATE) | | |
| Backfill Compaction Method (SELECTION options: Hand Compaction, Plate Compactor, Roller, Other (Specify)) | | |
| Any observed issues during backfilling (e.g., water intrusion) (TEXT) | | |
| Photos of Backfilled Area (pre & post) (UPLOAD) | | |
| | | |
| Quality Control & Documentation (STEP) | | |
| Date of Waterproofing Installation (DATE) | | |
| Ambient Temperature During Installation (°C/°F) (NUMBER) | | |
| Substrate Temperature During Installation (°C/°F) (NUMBER) | | |
| Description of Weather Conditions During Installation (TEXT) | | |
| Waterproofing Membrane Manufacturer (SELECTION options: Manufacturer A, Manufacturer B, Manufacturer C, Other (Specify)) | | |
| Waterproofing Membrane Type (SELECTION options: Bituminous, Polyurethane, Cementitious, Other (Specify)) | | |
| Photos of Waterproofing Installation (Before/During/After) (UPLOAD) | | |
| Detailed Notes/Observations During Quality Checks (TEXT) | | |
| Inspection Status (SELECTION options: Passed, Failed, Needs Revision) | | |
| Inspector Signature (SIGNATURE) | | |