Ore Stockpile Inventory Management

Optimize your mining operations with our Ore Stockpile Inventory Management workflow. Streamline real-time tracking, automate ore grade monitoring, and enhance stockpile reconciliation to prevent-loss, reduce operational bottlenecks, and ensure precise-resource planning for maximum mining profitability.

Inicio
1. Fetch Current Stockpile Records
2. Get Site Sensor Data
3. Calculate Mass Balance
4. Calculate Total Tonnage
5. Update Stockpile Inventory Levels
6. Log Discrepancy Report
7. Assign Physical Inspection Task
8. Notify Lab for Grade Testing
9. Aggregate Total Site Inventory
10. Calculate Average Ore Grade
11. Send Low Stock Alert
12. Generate Daily Inventory Report
13. Urgent Stockpile Depletion Alert
14. Remove Obsolete Stockpile Entry
Fin

Inicio del flujo de trabajo/proceso.

Retrieve all existing entries from the Stockpile Data Model to identify current ore volumes and grades.

Retrieve the latest weight and volume readings from automated stockpile sensors or belt scales.

Calculate the difference between incoming ore (inflow) and outgoing ore (outflow) to determine net change.

Sum the density and volume measurements to calculate the total estimated tonnage of the stockpile.

Update the 'Current Quantity' field in the Stockpile Data Model based on the new calculated mass.

Create a new entry in the Discrepancy Model if the sensor data differs significantly from the manual survey.

Create a task for the Site Surveyor to perform a manual visual inspection of the stockpile density.

Create a task for the Laboratory Technician to perform a chemical assay on ore samples.

Sum the tonnage of all individual stockpiles to get the total ore available on-site.

Calculate the weighted average of the metal content across all stockpiles.

Send an email to the Operations Manager if stockpile levels fall below the predefined safety threshold.

Generate a formal PDF/Excel report summarizing the daily changes in ore tonnage and grade.

Send an SMS to the Plant Superintendent if a critical stockpile is nearly empty.

Delete stockpile records from the system once the stockpile has been completely depleted and processed.

Fin del flujo de trabajo/proceso.

Gestión Minera

¿Le resultó útil esta plantilla de flujo de trabajo?

Resume y analiza esta plantilla de flujo de trabajo con

Demostración de la Solución de Gestión Minera

¡Maximice la eficiencia y la seguridad en las operaciones mineras! ChecklistGuro optimiza la gestión de tareas, el seguimiento de equipos y la elaboración de informes de cumplimiento. Optimice los flujos de trabajo, reduzca los riesgos y aumente la productividad. Administre todo con nuestro Work OS.

Plantillas de flujo de trabajo relacionadas

Podemos hacerlo juntos

¿Necesita ayuda con las listas de verificación?

¿Tienes alguna pregunta? Estamos aquí para ayudarte. Envía tu consulta y te responderemos a la brevedad.

Correo electrónico
¿Cómo podemos ayudarte?