Real-time Mineral Resource Estimation

Optimize your mining operations with our real-time mineral resource estimation workflow. Drive precision in orebody modeling and grade control through continuous data integration, reducing uncertainty and maximizing recovery through live, actionable geological insights.

Diese Vorlage wurde 4 Mal installiert.

Start
1. Fetch Drillhole Assay Data
2. Fetch Geological Logs
3. Fetch Topography Data
4. Calculate Search Ellipsoid Parameters
5. Assign Variogram Modeling Task
6. Retrieve Variogram Models
7. Execute Kriging Interpolation
8. Create Block Model Grid
9. Update Block Grade Attributes
10. Calculate Global Mean Grade
11. Calculate Total Contained Metal
12. Retrieve Resource Classification Criteria
13. Assign Resource Category
14. QA/QC Validation Review
15. Generate Resource Estimation Summary
16. Notify Project Manager
17. Alert Site Supervisor
Ende

Start des Workflows/Prozesses.

Retrieve chemical composition and grade data from the Assay Results data model.

Retrieve lithology and alteration data from the Geological Logs data model.

Retrieve surface elevation and digital elevation model (DEM) coordinates.

Execute formula to determine anisotropy and search radii based on variogram models.

Assign a task to a Geostatistician to perform spatial continuity analysis.

Fetch processed spatial continuity parameters from the Geostatistics data model.

Execute the core Ordinary Kriging algorithm using assay values and variogram parameters.

Generate the 3D block model entries (nodes) containing estimated grades.

Populate the newly created block grid with calculated mineral grades and densities.

Aggregate all block entries to calculate the average grade of the entire estimated volume.

Sum the product of (Volume * Density * Grade) across all blocks to find total tonnage.

Fetch threshold values for Measured, Indicated, and Inferred resource classification.

Update each block entry with its classification (Measured/Indicated/Inferred) based on kriging variance.

Assign a task to the Senior Geologist to validate the estimation against raw data.

Create a technical report summarizing grades, tonnage, and classification by domain.

Send an email to the Project Manager with the summary of the new resource estimate.

Send an SMS alert to the Site Supervisor regarding the availability of the new estimation update.

Ende des Arbeitsablaufs/Prozesses.

Bergbau-Management
Vorlage herunterladen als:

Hat Ihnen diese Workflow-Vorlage geholfen?

Fassen Sie diese Workflow-Vorlage zusammen und analysieren Sie sie mit

Demonstration der Lösung für das Bergbau-Management

Maximieren Sie die Effizienz und Sicherheit im Bergbau! ChecklistGuro optimiert die Aufgabenverwaltung, die Geräteverfolgung und die Compliance-Berichterstattung. Optimieren Sie Arbeitsabläufe, reduzieren Sie Risiken und steigern Sie die Produktivität. Verwalten Sie alles mit unserer Work OS.

Verwandte Workflow-Vorlagen

Gemeinsam schaffen wir das

Benötigen Sie Hilfe bei Checklisten?

Haben Sie eine Frage? Wir helfen Ihnen gerne. Bitte senden Sie uns Ihre Anfrage, und wir werden Ihnen umgehend antworten.

E-Mail
Wie können wir Ihnen helfen?