| Formwork Inspection (STEP) | | |
| Formwork Alignment Deviation (mm) (NUMBER) | | |
| Tie Spacing (mm) (NUMBER) | | |
| Formwork Condition (SELECTION options: Excellent, Good, Fair, Poor) | | |
| Detailed Formwork Condition Notes (TEXT) | | |
| Bracing Adequacy (SELECTION options: Adequate, Insufficient, Not Present) | | |
| Formwork Photo Documentation (UPLOAD) | | |
| | | |
| Reinforcement Placement (STEP) | | |
| Bar Size (Diameter in inches) (NUMBER) | | |
| Spacing Between Bars (in inches) (NUMBER) | | |
| Concrete Cover (in inches) (NUMBER) | | |
| Bar Grade Verification (e.g., ASTM A615) (SELECTION options: Grade 60, Grade 50, Grade 75, Other (Specify in Long Text)) | | |
| Notes on Bar Placement or Adjustments (TEXT) | | |
| Tie Wire Type (SELECTION options: Aluminum, Galvanized Steel) | | |
| Bar Location Correctness (SELECTION options: Correct, Incorrect - Needs Adjustment) | | |
| | | |
| Subgrade Preparation (STEP) | | |
| Subgrade Compaction Factor (%) (NUMBER) | | |
| Moisture Content (%) (NUMBER) | | |
| Description of Subgrade Condition (TEXT) | | |
| Soil Type (SELECTION options: Clay, Sand, Gravel, Silt, Loam) | | |
| Subgrade Photo Documentation (UPLOAD) | | |
| Level of Debris (SELECTION options: None, Minor, Moderate, Significant) | | |
| | | |
| Weather Conditions (STEP) | | |
| Ambient Temperature (°C) (NUMBER) | | |
| Concrete Temperature (°C) (NUMBER) | | |
| Wind Conditions (SELECTION options: Calm, Light Breeze, Moderate Wind, High Wind) | | |
| Precipitation (SELECTION options: None, Light Rain, Moderate Rain, Heavy Rain, Snow) | | |
| Date of Weather Observation (DATE) | | |
| Time of Weather Observation (DATE) | | |
| | | |
| Material Verification (STEP) | | |
| Concrete Slump (inches) (NUMBER) | | |
| Ambient Temperature (°F) (NUMBER) | | |
| Air Temperature (°F) (NUMBER) | | |
| Concrete Mix Design Confirmed? (SELECTION options: Yes, No) | | |
| Water Quality Verified? (SELECTION options: Yes, No) | | |
| Concrete Batch Ticket (UPLOAD) | | |
| Notes on Materials (TEXT) | | |
| | | |
| Equipment Readiness (STEP) | | |
| Pump Flow Rate (GPM) (NUMBER) | | |
| Vibrator Frequency (Hz) (NUMBER) | | |
| Finishing Tools Condition (SELECTION options: Excellent, Good, Fair, Poor) | | |
| Last Maintenance Date (Pump) (DATE) | | |
| Estimated Pour Start Time (DATE) | | |
| Fuel Level (Generator/Pump) (SELECTION options: Full, 75%, 50%, 25%, Empty) | | |
| Equipment Photos (Pre-pour) (UPLOAD) | | |
| | | |
| Safety Protocol (STEP) | | |
| PPE Availability (Check all that apply) (SELECTION options: Hard Hats, Safety Glasses, Gloves, High-Visibility Vests, Steel-Toed Boots) | | |
| Number of Safety Barriers Present (NUMBER) | | |
| Location of First Aid Kit (LOCATION) | | |
| Date of Last Safety Briefing (DATE) | | |
| Safety Signage Adequacy (SELECTION options: Adequate, Needs Improvement, Insufficient) | | |
| Any Observed Safety Hazards? (TEXT) | | |
| Safety Observer Signature (SIGNATURE) | | |
| |