Concrete Pour Readiness Checklist: Formwork, Reinforcement & Quality Control

Ensure a flawless concrete pour! This comprehensive checklist guides you through formwork setup, reinforcement placement, and crucial quality control steps, minimizing errors and maximizing structural integrity on your construction project.

This Template was installed 2 times.

Formwork Inspection

1 of 7

Verify formwork stability, alignment, and bracing to ensure concrete placement accuracy and prevent blowouts.

Formwork Alignment Deviation (mm)

Tie Spacing (mm)

Formwork Condition

Detailed Formwork Condition Notes

Bracing Adequacy

Formwork Photo Documentation

Reinforcement Placement

2 of 7

Confirm correct bar size, spacing, and placement per approved drawings. Check for proper cover and tying.

Bar Size (Diameter in inches)

Spacing Between Bars (in inches)

Concrete Cover (in inches)

Bar Grade Verification (e.g., ASTM A615)

Notes on Bar Placement or Adjustments

Tie Wire Type

Bar Location Correctness

Subgrade Preparation

3 of 7

Assess subgrade compaction, moisture content, and debris removal to ensure adequate support for the concrete slab.

Subgrade Compaction Factor (%)

Moisture Content (%)

Description of Subgrade Condition

Soil Type

Subgrade Photo Documentation

Level of Debris

Weather Conditions

4 of 7

Evaluate temperature, precipitation, and wind conditions to determine potential impact on concrete curing and strength.

Ambient Temperature (°C)

Concrete Temperature (°C)

Wind Conditions

Precipitation

Date of Weather Observation

Time of Weather Observation

Material Verification

5 of 7

Check concrete mix design, slump, and aggregate quality against project specifications. Verify water quality.

Concrete Slump (inches)

Ambient Temperature (°F)

Air Temperature (°F)

Concrete Mix Design Confirmed?

Water Quality Verified?

Concrete Batch Ticket

Notes on Materials

Equipment Readiness

6 of 7

Ensure availability and functionality of pumps, vibrators, and finishing tools. Check for fuel and lubrication.

Pump Flow Rate (GPM)

Vibrator Frequency (Hz)

Finishing Tools Condition

Last Maintenance Date (Pump)

Estimated Pour Start Time

Fuel Level (Generator/Pump)

Equipment Photos (Pre-pour)

Safety Protocol

7 of 7

Confirm presence and functionality of safety barriers, signage, and PPE for all personnel involved.

PPE Availability (Check all that apply)

Number of Safety Barriers Present

Location of First Aid Kit

Date of Last Safety Briefing

Safety Signage Adequacy

Any Observed Safety Hazards?

Safety Observer Signature

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?