Real-time Mineral Resource Estimation

Optimize your mining operations with our real-time mineral resource estimation workflow. Drive precision in orebody modeling and grade control through continuous data integration, reducing uncertainty and maximizing recovery through live, actionable geological insights.

Esta plantilla se instaló 4 veces.

Inicio
1. Fetch Drillhole Assay Data
2. Fetch Geological Logs
3. Fetch Topography Data
4. Calculate Search Ellipsoid Parameters
5. Assign Variogram Modeling Task
6. Retrieve Variogram Models
7. Execute Kriging Interpolation
8. Create Block Model Grid
9. Update Block Grade Attributes
10. Calculate Global Mean Grade
11. Calculate Total Contained Metal
12. Retrieve Resource Classification Criteria
13. Assign Resource Category
14. QA/QC Validation Review
15. Generate Resource Estimation Summary
16. Notify Project Manager
17. Alert Site Supervisor
Fin

Inicio del flujo de trabajo/proceso.

Retrieve chemical composition and grade data from the Assay Results data model.

Retrieve lithology and alteration data from the Geological Logs data model.

Retrieve surface elevation and digital elevation model (DEM) coordinates.

Execute formula to determine anisotropy and search radii based on variogram models.

Assign a task to a Geostatistician to perform spatial continuity analysis.

Fetch processed spatial continuity parameters from the Geostatistics data model.

Execute the core Ordinary Kriging algorithm using assay values and variogram parameters.

Generate the 3D block model entries (nodes) containing estimated grades.

Populate the newly created block grid with calculated mineral grades and densities.

Aggregate all block entries to calculate the average grade of the entire estimated volume.

Sum the product of (Volume * Density * Grade) across all blocks to find total tonnage.

Fetch threshold values for Measured, Indicated, and Inferred resource classification.

Update each block entry with its classification (Measured/Indicated/Inferred) based on kriging variance.

Assign a task to the Senior Geologist to validate the estimation against raw data.

Create a technical report summarizing grades, tonnage, and classification by domain.

Send an email to the Project Manager with the summary of the new resource estimate.

Send an SMS alert to the Site Supervisor regarding the availability of the new estimation update.

Fin del flujo de trabajo/proceso.

Gestión Minera
Descargar plantilla como:

¿Le resultó útil esta plantilla de flujo de trabajo?

Resume y analiza esta plantilla de flujo de trabajo con

Demostración de la Solución de Gestión Minera

¡Maximice la eficiencia y la seguridad en las operaciones mineras! ChecklistGuro optimiza la gestión de tareas, el seguimiento de equipos y la elaboración de informes de cumplimiento. Optimice los flujos de trabajo, reduzca los riesgos y aumente la productividad. Administre todo con nuestro Work OS.

Plantillas de flujo de trabajo relacionadas

Podemos hacerlo juntos

¿Necesita ayuda con las listas de verificación?

¿Tienes alguna pregunta? Estamos aquí para ayudarte. Envía tu consulta y te responderemos a la brevedad.

Correo electrónico
¿Cómo podemos ayudarte?