Underground Mine Ventilation Checklist

Ensure safe and compliant underground operations. Our Underground Mine Ventilation Checklist streamlines assessments, mitigates risks, and helps you meet regulatory requirements - all in one easy-to-use template. Protect your team and optimize airflow with confidence.

Ce modèle a été installé 2 fois.

Style d'affichage

Pre-Shift Ventilation Checks

1 of 9

Initial assessment of ventilation system functionality before shift commencement.

Date of Inspection

Inspection Start Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Ventilation Control Room Location

Main Fan Operational Status

Auxiliary Fan Operational Status

Main Fan Amperage (A)

Auxiliary Fan Amperage (A)

Notes/Observations

Inspector Signature

Airflow Monitoring

2 of 9

Measurement and verification of airflow rates at designated locations.

Airflow Rate (m³/s)

Static Pressure (Pa)

Fan Status

Temperature (Celsius)

Monitoring Date

Monitoring Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Monitoring Location (Ventilation Point)

Notes/Observations

Ventilation Controls Inspection

3 of 9

Examination of ventilation controls, including fans, dampers, and regulators.

Fan 1 RPM

Fan 2 RPM

Damper 1 Position (Open/Closed/Partially Closed)

Damper 2 Position (Open/Closed/Partially Closed)

Air Pressure at Regulator A (kPa)

Notes on Control Operation or Issues

Last Calibration Date (Regulator A)

Inspector Signature

Dilution Ventilation Assessment

4 of 9

Evaluation of ventilation effectiveness in diluting gases and dust.

Methane Concentration (ppm)

Oxygen Concentration (%)

Carbon Dioxide Concentration (%)

Dust Concentration (mg/m³)

Ventilation Effectiveness (Qualitative)

Observations & Notes

Dilution Ventilation Control Status

Fire Suppression Ventilation Checks

5 of 9

Verification of fire suppression ventilation system readiness.

Fire Suppression Fan Status

Fire Suppression Fan RPM

Fire Water Spray Nozzle Condition

Last Fire Suppression System Test Date

Time of Fire Suppression System Activation (if applicable)

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Notes on Fire Suppression Ventilation System Performance

Emergency Ventilation Procedures

6 of 9

Review and confirmation of emergency ventilation procedures and equipment.

Emergency Ventilation System Activation Procedure Reviewed?

Time to Activate Emergency Ventilation (minutes)

Brief Description of Actions Taken During Emergency Ventilation Activation

Date of Last Emergency Ventilation Drill

Time of Last Emergency Ventilation Drill Start

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Emergency Ventilation Routes Verified Clear?

Signature of Person Verifying Emergency Ventilation Procedures

Ventilation Obstruction Checks

7 of 9

Inspection for obstructions that may impede airflow.

Location of Obstruction Check (e.g., Face, Return Airway)

Potential Obstruction Types Observed

Description of Obstruction (if any)

Estimated Obstruction Size (e.g., in meters/feet)

Obstruction Clearance Status

Date of Clearance (if applicable)

Time of Clearance (if applicable)

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Inspector Signature

Gas Monitoring Equipment Calibration

8 of 9

Validation of gas monitoring equipment accuracy and functionality.

Calibration Date

Span Gas Concentration (ppm)

Zero Gas Concentration (ppm)

Reading at Zero Gas (ppm)

Reading at Span Gas (ppm)

Calibration Successful?

Calibration Notes (if applicable)

Calibrator Signature

Equipment ID

Documentation & Record Keeping

9 of 9

Review of ventilation logs, maintenance records, and incident reports.

Check Date

Check Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Previous Incident Count (Last 12 Months)

Summary of Findings/Observations

Supporting Documentation (e.g., airflow readings, gas monitoring reports)

Corrective Actions Required?

Description of Corrective Actions (If Yes)

Inspector Signature

Ce modèle de liste de contrôle vous a-t-il été utile ?

Démonstration de la solution de gestion minière

Maximisez l'efficacité et la sécurité des opérations minières ! ChecklistGuro rationalise la gestion des tâches, le suivi des équipements et la production de rapports de conformité. Optimisez les flux de travail, réduisez les risques et augmentez la productivité. Gérez tout cela grâce à notre plateforme Work OS.

Modèles de liste de contrôle associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?