ChecklistGuro logo ChecklistGuro Solutions Secteurs d'activité Ressources Tarifs

Mine Ventilation Dilution Checklist

Ensure optimal air quality and worker safety! This Mine Ventilation Dilution Checklist provides a step-by-step guide to verify adequate ventilation dilution ratios, minimizing hazards and maximizing operational efficiency. Download now and protect your mining workforce.

Ce modèle a été installé 1 fois.

Style d'affichage

Pre-Shift Ventilation Checks

1 of 10

Initial assessment of ventilation system functionality before commencement of shift operations.

Shift Start Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Ventilation System Status (Pre-Shift)

Pre-Shift Ventilation Fan RPM (Fan 1)

Pre-Shift Ventilation Fan RPM (Fan 2 - if applicable)

Emergency Ventilation System Availability

Notes on Pre-Shift Ventilation Condition

Airflow Measurement

2 of 10

Verification of airflow rates at strategic locations within the mine.

Airflow Rate (m³/s)

Airflow Rate (CFM)

Measurement Location (GPS Coordinates)

Measurement Device Used

Pitot Tube Pressure (Pa)

Measurement Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Notes on Measurement Conditions

Dilution Factor Calculation

3 of 10

Determination of dilution factors to ensure acceptable air quality.

Gas Emission Rate (m³/s)

Airflow to Mining Area (m³/s)

Total Airflow (m³/s)

Dilution Factor

Gas Type (Primary Contributor)

Notes/Comments on Calculation

Date of Calculation

Gas Monitoring

4 of 10

Monitoring of methane, carbon monoxide, and other hazardous gases.

Monitoring Start Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Methane Concentration (ppm)

Carbon Monoxide Concentration (ppm)

Oxygen Concentration (%)

Gas Detection Equipment Model

Calibration Expiration Date (YYYY-MM-DD)

Gas Monitoring Notes

Ventilation Control Settings

5 of 10

Review of ventilation control system parameters and adjustments as needed.

Fan Speed (RPM)

Air Volume (m³/s)

Ventilation Pressure (Pa)

Ventilation Mode

Time of Adjustment

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Reason for Adjustment

Control System Status

Fan Performance Evaluation

6 of 10

Assessment of fan RPM, power consumption, and overall efficiency.

Fan RPM (Revolutions Per Minute)

Motor Amperage (Amps)

Static Pressure (inches of water)

Air Volume (CFM or m³/s)

Fan Noise Level (Subjective)

Fan Vibration Observation (Describe)

Fan Efficiency Rating (if available)

Last Maintenance Date

Stoping Area Ventilation

7 of 10

Specific ventilation checks for active stoping areas.

Airflow (m³/s) at Face

Gas Concentration (methane, %) at Face

Distance to Nearest Ventilation Control Panel (m)

Ventilation Direction (as per plan)

Observations & Deviations

Time of Ventilation Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Potential Hazards Identified

Return Airway Assessment

8 of 10

Evaluation of airways used for return airflow.

Airflow Measurement (m³/s)

Description of Airway Condition

Evidence of Scaling/Support Required?

Potential Hazards Observed

Return Airway Location

Date of Assessment

Ventilation Obstruction Check

9 of 10

Identification and correction of any obstructions affecting airflow.

Obstruction Location (GPS Coordinates)

Type of Obstruction

Detailed Description of Obstruction

Estimated Obstruction Volume (m³)

Impact on Airflow?

Photo of Obstruction

Time Obstruction Notified

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Record Keeping & Reporting

10 of 10

Documentation of ventilation data and reporting of any discrepancies.

Date of Ventilation Dilution Check

Time of Ventilation Dilution Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Average Methane Concentration (ppm)

Average Carbon Monoxide Concentration (ppm)

Dilution Factor Achieved

Dilution Factor Acceptance Status

Observations & Deviations

Ventilation Officer Signature

Ce modèle de liste de contrôle vous a-t-il été utile ?

Démonstration de la solution de gestion minière

Maximisez l'efficacité et la sécurité des opérations minières ! ChecklistGuro rationalise la gestion des tâches, le suivi des équipements et la production de rapports de conformité. Optimisez les flux de travail, réduisez les risques et augmentez la productivité. Gérez tout cela grâce à notre plateforme Work OS.

Modèles de liste de contrôle associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?