Concrete Strength Testing Checklist

Ensure your concrete meets project specs! Download our free Concrete Strength Testing Checklist - the essential guide for construction pros. Minimize errors, maximize durability, and stay compliant. Perfect for field engineers, inspectors, and quality control teams.

Ce modèle a été installé 2 fois.

Style d'affichage

Pre-Testing Preparation

1 of 8

Ensuring proper setup and equipment readiness before commencing testing.

Date of Preparation Check

Time of Preparation Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Ambient Temperature (°C)

Humidity (%)

Testing Standard Used

Project Name

Concrete Mix Design No.

Equipment Ready?

Sample Extraction & Handling

2 of 8

Documenting and correctly handling concrete samples from the pour.

Pour Identification Number/Tag

Location of Sample Extraction (e.g., Slab #, Column C-3)

Number of Cylinders Extracted

Sample Extraction Method (e.g., Scoop, Trowel)

Notes on Sample Extraction Conditions (e.g., moisture, temperature, slump)

Date of Sample Extraction

Time of Sample Extraction

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Name/Initials of Person Extracting Samples

Cylinder Preparation & Storage

3 of 8

Ensuring proper mold selection, filling, and curing conditions for cylinders.

Number of Cylinders Cast

Mold Type Used (e.g., Standard, Slim)

Specifics regarding other mold type (if applicable)

Concrete Slump (inches)

Compaction Factor

Date of Casting

Notes on Cylinder Preparation (e.g., visual defects, air pockets)

Curing Conditions

Curing Temperature (°C)

Testing Equipment Calibration & Verification

4 of 8

Confirming the accuracy and functionality of compression testing equipment.

Last Calibration Date for Compression Machine

Compression Machine Capacity (kN/lbs)

Machine Load Increment (kN/lbs)

Calibration Weight Serial Number(s)

Calibration Standard Used

If 'Other' selected above, specify calibration standard:

Load Cell Verification Passed?

If Load Cell Verification Failed, describe the issue and corrective action taken:

Verification Load Applied (kN/lbs)

Testing Procedure Execution

5 of 8

Following the standardized testing procedure meticulously.

Cylinder Load at Failure (lbs or kN)

Maximum Load Achieved (lbs or kN)

Cylinder Diameter (inches or mm)

Cylinder Height (inches or mm)

Strain at Failure (microstrain)

Loading Rate

Observations during Testing (e.g., cracking patterns, failure mode)

Direction of Test (if applicable)

Data Recording & Analysis

6 of 8

Accurate recording of results and initial data analysis.

Cylinder Diameter (inches)

Cylinder Height (inches)

Maximum Test Load (lbs)

Breaking Load (lbs)

Calculated Compressive Strength (psi)

Average Compressive Strength (psi) - for multiple tests

Test Method Used (e.g., ASTM C496, ASTM C39)

Notes / Observations (e.g., failure pattern, unusual conditions)

Documentation & Reporting

7 of 8

Properly documenting the test and generating a clear, concise report.

Test Number/ID

Date of Test

Time of Test

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Project Name

Concrete Mix Design

Observations during testing (e.g., cracking, appearance)

28-Day Strength (psi/MPa)

Compliance with Specification?

Attach Test Certificates/Photos

Tester Signature

Quality Control & Non-Conformance

8 of 8

Identifying and addressing any deviations from established protocols.

Number of Discarded Cylinders (if any)

Reason for Cylinder Discard (if applicable)

Observed Anomalies (e.g., cracking, air pockets)

Description of Observed Anomalies (if selected above)

Test Result within Specification Limits?

Explanation of Non-Conformance (if result outside limits)

Corrective Actions Taken

Details of Corrective Actions (if selected above)

Date of Corrective Action

Signature of Person Verifying Non-Conformance

Ce modèle de liste de contrôle vous a-t-il été utile ?

Démonstration d'une solution de gestion de la construction

Construisez plus intelligemment, pas plus dur ! ChecklistGuro rationalise les projets de construction, de la planification à la clôture. Gérez les tâches, les inspections, les protocoles de sécurité et bien plus encore, le tout au même endroit. Réduisez les retards, améliorez la communication et livrez les projets dans les délais et dans le budget.

Modèles de liste de contrôle associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?