Mining Geotechnical Stability Checklist

Ensure safe and compliant mine operations. This Mining Geotechnical Stability Checklist helps identify and mitigate risks related to slope failure, ground movement, and overall site stability, promoting a secure working environment and minimizing potential disruptions.

Style d'affichage

Site Overview & Data Review

1 of 10

Initial assessment of site conditions and review of existing geotechnical data (borehole logs, stability reports, etc.).

Date of Review

Reviewer ID

Geotechnical Domain (e.g., Open Pit, Underground)

Brief Summary of Site History & Previous Instabilities

Relevant Geotechnical Reports (e.g., stability analysis, hydrogeological studies)

Current Geological Formation

Summary of existing monitoring data and trends

Slope Monitoring Equipment

2 of 10

Verification of installation, calibration, and functionality of slope monitoring instruments (inclinometers, extensometers, piezometers).

Inclinometer Reading (Max)

Extensometer Reading (Length Change)

Piezometer Pressure (kPa)

Last Calibration Date (Inclinometer)

Last Calibration Date (Extensometer)

Time of Reading

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Equipment Status (Inclinometer)

Equipment Photo (Optional)

Visual Inspection - Ground Movement

3 of 10

Detailed observation and documentation of any visible ground movement, cracking, or deformation.

Describe any observed ground cracking (size, orientation, pattern).

Maximum crack width observed (mm).

Types of ground movement observed (select all that apply)

Note any signs of recent settling or displacement of structures.

Upload photos of observed ground movement.

Record precise location of observed movement (GPS coordinates)

Visual Inspection - Support Systems

4 of 10

Assessment of the condition and effectiveness of ground support systems (rock bolts, shotcrete, mesh).

Rock Bolt Quantity

Shotcrete Thickness (mm)

Rock Bolt Condition

Shotcrete Condition

Comments on Mesh Condition (if applicable)

Photos of Support Systems

Mesh Density (kg/m2)

Water Management & Seepage

5 of 10

Evaluation of water ingress, drainage systems, and potential for instability due to water pressure.

Piezometer Reading (kPa)

Inflow Volume (m³/hr)

Drainage System Condition

Observations on Surface Water Flow

Evidence of Seepage

Photos of Water Ingress/Seepage

Weather Condition Impacts

6 of 10

Assessment of recent weather patterns (rainfall, freeze-thaw cycles) and their potential impact on slope stability.

Date of Last Significant Rainfall Event

Rainfall Amount (mm) during Last Event

Ground Temperature (°C)

Freeze-Thaw Cycle Risk?

Observed Weather Impacts (e.g., surface runoff, saturation)

Wind Direction

Wind Speed (km/h)

Equipment & Traffic Routes

7 of 10

Review of equipment placement and traffic routes relative to slopes and potential hazards.

Equipment Staging Area Coordinates

Distance from Slope Edge (meters)

Route Designation

Slope Angle (degrees)

Potential Hazards?

Notes on Route Condition

Unstable Ground Identification

8 of 10

Documentation of any areas of concern or potential instability requiring further investigation or mitigation.

Description of Observed Ground Feature (e.g., crack, slump)

Approximate Crack Width (mm)

Approximate Displacement/Movement (mm)

Type of Ground Failure

Contributing Factors (e.g., water, blasting)

Precise Location of Feature

Photographic Evidence

Mitigation Actions & Recommendations

9 of 10

Proposed actions to address identified risks and improve overall slope stability.

Detailed Description of Recommended Mitigation Action

Quantity of Rock Bolts Required

Thickness of Shotcrete Required (mm)

Type of Ground Support System

Planned Completion Date for Mitigation

Urgency Level of Mitigation Action

Justification for Recommended Mitigation

Supporting Documentation (e.g., Design Calculations)

Follow-up & Reporting

10 of 10

Details of planned follow-up actions and reporting requirements.

Next Inspection Date

Time of Inspection

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Inspection Severity Level

Summary of Findings & Recommendations

Supporting Documentation (Photos, Reports)

Days Until Next Inspection

Inspector Signature

Ce modèle de liste de contrôle vous a-t-il été utile ?

Démonstration de la solution de gestion minière

Maximisez l'efficacité et la sécurité des opérations minières ! ChecklistGuro rationalise la gestion des tâches, le suivi des équipements et la production de rapports de conformité. Optimisez les flux de travail, réduisez les risques et augmentez la productivité. Gérez tout cela grâce à notre plateforme Work OS.

Modèles de liste de contrôle associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?