Tailings Dam Management & Monitoring

Optimize safety and regulatory compliance with our Tailings Dam Management & Monitoring workflow. Streamline real-time structural health tracking, automated sensor integration, and predictive risk assessment to ensure environmental stability and operational excellence in mining management.

Début
1. Retrieve Dam Sensor Data
2. Calculate Pore Pressure Ratio
3. Calculate Rate of Displacement
4. Update Sensor Threshold Status
5. Aggregate Weekly Precipitation
6. Create Incident Report
7. Assign Site Inspection Task
8. Create Maintenance Work Order
9. Notify Emergency Response Team
10. Send Critical Alert SMS
11. Fetch Inspection Checklists
12. Generate Monthly Compliance Report
13. Update Dam Health Score
14. Archive Old Sensor Logs
Fin

Début du flux de travail/processus.

Fetch the latest readings from piezometers, inclinometers, and settlement markers from the Monitoring Data Model.

Calculate the ratio of pore water pressure to total overburden pressure to check for stability thresholds.

Determine the velocity of movement by comparing the current displacement reading against the previous reading.

Update the 'Status' field in the Sensor Data Model to 'Alert' or 'Critical' if thresholds are breached.

Sum all rainfall entries from the last 7 days to calculate cumulative rainfall loading on the dam crest.

Automatically generate a new entry in the Incident Log Data Model when a threshold breach is detected.

Create a task for the Geotechnical Engineer to perform a physical visual inspection of the containment area.

Generate a task for the maintenance team to inspect the spillway and drainage systems.

Send an urgent email alert to the Emergency Response Team (ERT) and Site Manager containing the breach details.

Send an SMS notification to the Safety Officer for immediate attention to high-risk movement readings.

Retrieve the predefined safety checklist template associated with the current dam section.

Compile all sensor data, inspection results, and incident logs into a formal Monthly Monitoring Report.

Update the overall 'Health Index' in the Asset Registry based on the aggregated monitoring results.

Remove or move expired/redundant raw sensor readings from the active monitoring model to historical storage.

Fin du flux de travail/processus.

Gestion minière
Télécharger le modèle au format :

Ce modèle de workflow vous a été utile ?

Résumez et analysez ce modèle de workflow avec

Démonstration de la solution de gestion minière

Maximisez l'efficacité et la sécurité des opérations minières ! ChecklistGuro rationalise la gestion des tâches, le suivi des équipements et la production de rapports de conformité. Optimisez les flux de travail, réduisez les risques et augmentez la productivité. Gérez tout cela grâce à notre plateforme Work OS.

Modèles de flux de travail associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?