Optimize your mine productivity with our Blasting Operations & Fragmentation Control workflow. Master every stage of the blast cycle-from precise pattern design and explosive loading to real-time fragmentation analysis-to minimize secondary breakage, reduce downstream crushing costs, and enhance pit safety. Streamline fragmentation consistency and drive operational efficiency with data-driven blasting management.

Ten szablon został zainstalowany 5 razy.

Rozpoczęcie
1. Retrieve Site Geological Data
2. Get Blast Pattern Design
3. Calculate Powder Factor
4. Calculate Maximum Instantaneous Charge (MIC)
5. Create Blast Plan Entry
6. Assign Drilling Task
7. Assign Loading & Stemming Task
8. Update Drill Log with Actuals
9. Retrieve Explosive Inventory
10. Update Explosive Usage
11. Assign Blasting Technician
12. Notify Site Safety Officer
13. Blast Warning Alert
14. Create Fragmentation Analysis Entry
15. Calculate Average Fragmentation Size
16. Generate Post-Blast Performance Report
17. Update Blast Performance Score
Koniec

Rozpoczęcie przepływu pracy/procesu.

Fetch existing borehole and rock density data from the Geological Data Model to determine fragmentation requirements.

Retrieve the predefined drilling pattern and burden/spacing parameters from the Blast Design entry.

Calculate the ratio of explosive mass to the volume of rock to be fragmented (kg/m³).

Calculate the allowed charge weight per delay to comply with vibration safety limits.

Generate a new Blast Plan record containing the calculated parameters, pattern geometry, and explosive types.

Create a task for the Drilling Supervisor to execute the pattern according to the retrieved design.

Create a task for the Blasting Crew to perform hole charging and stemming.

Update the Blast Plan entry with actual drilling depths and any deviations encountered during drilling.

Check available emulsion or ANFO stock levels in the Inventory Data Model.

Subtract the quantity of explosives used from the Inventory Data Model.

Assign the final detonation and firing task to the certified Blaster-in-Charge.

Send an email notification to the Safety Officer regarding the scheduled blast time and exclusion zone setup.

Send an SMS alert to all site personnel in the vicinity to clear the blast area.

Create a new entry to record post-blast fragmentation results (e.g., % of oversize, mean fragment size).

Aggregate all recent fragmentation analysis entries to find the average particle size trend.

Generate a comprehensive report comparing the planned powder factor vs. actual fragmentation results.

Update the master Blast Log with a quality score based on the fragmentation analysis.

Koniec przepływu pracy/procesu.

Zarządzanie górnictwem
Pobierz szablon jako:

Czy ten szablon przepływu pracy okazał się pomocny?

Podsumuj i przeanalizuj ten szablon przepływu pracy z

Demonstracja rozwiązania do zarządzania górnictwem

Maksymalizuj efektywność i bezpieczeństwo w operacjach górniczych! ChecklistGuro usprawnia zarządzanie zadaniami, śledzenie sprzętu i raportowanie zgodności. Zoptymalizuj przepływy pracy, zmniejsz ryzyko i zwiększ produktywność. Zarządzaj wszystkim za pomocą naszej platformy Work OS.

Powiązane Szablony Pracy

Możemy to zrobić razem

Potrzebujesz pomocy z listami kontrolnymi?

Masz pytanie? Jesteśmy tu, aby pomóc. Prześlij zapytanie, a my szybko na nie odpowiemy.

E-mail
W czym możemy pomóc?