| | | |
| Created by checklistguro.com | | |
| | | |
| Design Records & Documentation Review (STEP) | | |
| Drawing Revision Level (UPLOAD) | | |
| Specification Deviation Summary (if any) (TEXT) | | |
| Part Number (NUMBER) | | |
| BOM Status (SELECTION options: Approved, Pending, Revision Required) | | |
| Date of Latest Drawing Revision (DATE) | | |
| Summary of Design Record Review Findings (TEXT) | | |
| Engineering Change Order (ECO) Status (SELECTION options: None, Open, Closed) | | |
| Revision Level Status (TEXT) | | |
| | | |
| Engineering Sample Submission & Evaluation (STEP) | | |
| Description of Engineering Sample Deviations (if any) (TEXT) | | |
| Engineering Sample Photographs (UPLOAD) | | |
| Number of Engineering Samples Received (NUMBER) | | |
| Description of Sample Testing Procedures (TEXT) | | |
| Test Temperature (°C) (NUMBER) | | |
| Test Humidity (%) (NUMBER) | | |
| Overall Sample Performance Evaluation (SELECTION options: Meets Requirements, Partially Meets Requirements, Does Not Meet Requirements) | | |
| Sample Receipt Date (DATE) | | |
| Detailed Comments on Sample Performance (TEXT) | | |
| | | |
| Process Capability & Control (STEP) | | |
| Process Capability Index (Cp) (NUMBER) | | |
| Process Capability Index (Cpk) (NUMBER) | | |
| Short-Term Process Variation (Sigma) (NUMBER) | | |
| Description of Process Control Plan (TEXT) | | |
| Control Plan Document (UPLOAD) | | |
| Process Validation Status (SELECTION options: Not Validated, Validated) | | |
| Date of Process Validation (DATE) | | |
| Description of any Process Deviations & Corrective Actions (TEXT) | | |
| Critical Process Parameters (CPPs) Monitored (SELECTION) | | |
| | | |
| Material & Component Approval (STEP) | | |
| Material Certificates (e.g., RoHS, REACH, Compliance) (UPLOAD) | | |
| Material Specification Review Summary (including revisions and variances) (TEXT) | | |
| Material Lot Traceability System? (SELECTION options: Yes, No) | | |
| Material Lot Size (Minimum) (NUMBER) | | |
| Supplier Material Approval Status? (SELECTION options: Approved, Pending Approval, Not Approved) | | |
| Notes Regarding Material Substitutions (if any) (TEXT) | | |
| Component Datasheets/Specifications (UPLOAD) | | |
| | | |
| Measurement System Analysis (MSA) (STEP) | | |
| MSA Study Type Performed (Gage R&R, Attribute, Variable) (SELECTION options: Gage R&R, Attribute, Variable, Other (Specify in LONG_TEXT)) | | |
| Number of Trials/Repetitions for MSA Study (NUMBER) | | |
| Brief Description of MSA Study Methodology (TEXT) | | |
| Repeatability (r) Value (NUMBER) | | |
| Reproducibility (R) Value (NUMBER) | | |
| Part-to-Part Variation (P) Value (NUMBER) | | |
| Overall MSA Variation (E) Value (NUMBER) | | |
| Acceptance Criteria Met? (SELECTION options: Yes, No) | | |
| MSA Study Report (PDF/Excel) (UPLOAD) | | |
| Comments/Corrective Actions (if applicable) (TEXT) | | |
| | | |
| Product Appearance Approval (PAA) (STEP) | | |
| Describe the aesthetic and visual standards for the product. (TEXT) | | |
| Upload approved appearance samples or reference images. (UPLOAD) | | |
| Acceptable variation limits for color (e.g., Delta E values). (NUMBER) | | |
| Surface finish requirement (e.g., matte, gloss, textured). (SELECTION options: Matte, Gloss, Textured, Other (specify)) | | |
| Select any applicable appearance defects to be monitored. (SELECTION options: Scratches, Dents, Color inconsistencies, Part line evidence, Orange peel, Other (specify)) | | |
| Acceptance criteria for visual defects (e.g., minor, major, critical). (SELECTION options: Minor, Major, Critical) | | |
| Detailed description of acceptable tolerances for appearance variations. (TEXT) | | |
| | | |
| Packaging & Labeling (STEP) | | |
| Packaging Specifications Summary (TEXT) | | |
| Packaging Drawings/Schematics (UPLOAD) | | |
| Packaging Material Compliance (e.g., RoHS, REACH) (SELECTION options: Compliant, Non-Compliant, Pending Review) | | |
| Labeling Requirements Met? (SELECTION options: Part Number, Lot Number, Revision Level, Customer PO Number, Country of Origin, Warning Labels (if applicable)) | | |
| Units per Package (NUMBER) | | |
| Package Integrity Test Results (SELECTION options: Pass, Fail, Not Applicable) | | |
| Packaging Defects Observed (if any) (TEXT) | | |
| | | |
| Initial Production Run & Sample Inspection (STEP) | | |
| Sample Size for Initial Production Run (NUMBER) | | |
| Description of Production Environment/Line Used (TEXT) | | |
| Critical Characteristics Verified During Initial Run? (SELECTION options: Dimensional, Functional, Visual, Material Properties, Performance) | | |
| Representative Photos of Initial Production Run (UPLOAD) | | |
| Any Deviations from Approved Process Encountered? (TEXT) | | |
| Conformity to Specifications? (SELECTION options: Yes, No) | | |
| Date of Initial Production Run (DATE) | | |
| Quantity of Parts Produced During Initial Run (NUMBER) | | |
| Description of Corrective Actions taken (if any) (TEXT) | | |
| | | |
| Final Approval & Sign-off (STEP) | | |
| PPAP Completion Date (DATE) | | |
| PPAP Status (SELECTION options: Approved, Rejected, Conditionally Approved) | | |
| Comments / Deviation Notes (if applicable) (TEXT) | | |
| Engineering Sign-off (SIGNATURE) | | |
| Manufacturing Sign-off (SIGNATURE) | | |
| Next Steps/Follow-up Actions (if applicable) (SELECTION options: None, Further testing required, Process adjustments recommended, Material review needed) | | |
| Revision Number (of approved document) (NUMBER) | | |
| | | |
| Document Retention & Traceability (STEP) | | |
| Number of PPAP Records Retained (NUMBER) | | |
| Date of Last PPAP Record Review (DATE) | | |
| Summary of Record Review Findings (if any) (TEXT) | | |
| Upload Record Retention Policy Document (UPLOAD) | | |
| Record Storage Location (Physical or Digital) (SELECTION options: Physical Archive, Digital Server (Specify)) | | |
| Description of Digital Storage Security Measures (if applicable) (TEXT) | | |
| Date of Next Scheduled Record Retention Review (DATE) | | |
| Contact Person for Record Retrieval (TEXT) | | |