ChecklistGuro logo ChecklistGuro Solutions Secteurs d'activité Ressources Tarifs

Mining Ground Control Checklist

Ensure mine stability & worker safety with our comprehensive Ground Control Checklist. Proactively identify & mitigate risks, maintain regulatory compliance, and optimize your mining operations. Download now!

Ce modèle a été installé 3 fois.

Style d'affichage

Visual Inspection & Mapping

1 of 9

Documentation of existing ground conditions, including cracks, shear zones, and geological structures.

Date of Inspection

Area/Block Inspected

Geological Formation Present

Joint Spacing (Average)

Orientation of Major Joints (Dip & Strike)

Description of Visible Rock Defects (e.g., cracks, shear zones)

Photographs of Ground Conditions

Rock Quality Designation (RQD)

Support System Assessment

2 of 9

Evaluation of existing support systems (e.g., bolts, cable bolts, mesh) for effectiveness and integrity.

Bolt Torque (kN·m)

Cable Bolt Length (m)

Mesh Condition

Support System Issues

Detailed Description of Support Condition

Overall Support System Integrity

Convergence Monitoring

3 of 9

Review of convergence monitoring data (e.g., extensometers, tape surveys) to identify trends and potential instability.

Extensometer Reading (Point A)

Extensometer Reading (Point B)

Tape Survey - Crown Height (mm)

Tape Survey - Sidewall Closure (mm)

Convergence Monitoring Date

Convergence Monitoring Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Observations & Anomalies

Instrumentation Functionality

4 of 9

Verification that all ground support instrumentation (e.g., load cells, pressure cells) are functioning correctly.

Extensometer 1 Status

Tape Survey Functionality

Load Cell 1 Reading (kN)

Pressure Cell 1 Status

Last Calibration Date (Extensometer 1)

Ground Condition Changes

5 of 9

Documentation of any observed ground condition changes since last inspection and potential causes.

Describe Observed Changes

Estimated Crack Width (mm)

Date of Observed Change

Change Severity

Potential Causes (Select all that apply)

Attach Photos/Videos of Changes

Scaling & Mucking

6 of 9

Assessment of scaling and mucking activities to maintain stability and prevent future issues.

Scaling Volume (m³)

Mucking Volume (m³)

Rock Type Scaled/Mucked

Description of Scaling/Mucking Activities

Equipment Used

Date of Scaling/Mucking

Support Installation Verification

7 of 9

Confirmation that new ground support installations meet design specifications and are properly installed.

Bolt Length Installed (m)

Cable Diameter Installed (mm)

Mesh Spacing (mm)

Bolt Type Verified?

Cable Bolt Tension Verified?

Support Method Confirmation

Comments/Observations on Installation

Water Ingress

8 of 9

Assessment and documentation of water ingress and its potential impact on ground stability.

Water Flow Rate (L/s)

Water Source Identified?

Description of Water Ingress Location

Date of Initial Observation

Time of Initial Observation

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Description of Water Quality (e.g., colour, odour)

Photo/Video Evidence

Recommendations & Actions

9 of 9

Record of recommendations for ground control improvements and associated actions to be taken.

Detailed Description of Recommended Action

Priority Level (1-5, 1=Highest)

Target Completion Date

Responsible Party

Supporting Documentation Required

Authorized Signatory

Ce modèle de liste de contrôle vous a-t-il été utile ?

Démonstration de la solution de gestion minière

Maximisez l'efficacité et la sécurité des opérations minières ! ChecklistGuro rationalise la gestion des tâches, le suivi des équipements et la production de rapports de conformité. Optimisez les flux de travail, réduisez les risques et augmentez la productivité. Gérez tout cela grâce à notre plateforme Work OS.

Modèles de liste de contrôle associés

Nous pouvons le faire ensemble

Besoin d'aide avec les listes de contrôle?

Vous avez une question ? Nous sommes là pour vous aider. Veuillez soumettre votre demande et nous vous répondrons rapidement.

E-mail
Comment pouvons-nous vous aider ?