Blasting Operations & Fragmentation Control

Optimize your mine productivity with our Blasting Operations & Fragmentation Control workflow. Master every stage of the blast cycle-from precise pattern design and explosive loading to real-time fragmentation analysis-to minimize secondary breakage, reduce downstream crushing costs, and enhance pit safety. Streamline fragmentation consistency and drive operational efficiency with data-driven blasting management.

Този шаблон е инсталиран 5 пъти.

Старт
1. Retrieve Site Geological Data
2. Get Blast Pattern Design
3. Calculate Powder Factor
4. Calculate Maximum Instantaneous Charge (MIC)
5. Create Blast Plan Entry
6. Assign Drilling Task
7. Assign Loading & Stemming Task
8. Update Drill Log with Actuals
9. Retrieve Explosive Inventory
10. Update Explosive Usage
11. Assign Blasting Technician
12. Notify Site Safety Officer
13. Blast Warning Alert
14. Create Fragmentation Analysis Entry
15. Calculate Average Fragmentation Size
16. Generate Post-Blast Performance Report
17. Update Blast Performance Score
Край

Начало на работния поток/процеса.

Fetch existing borehole and rock density data from the Geological Data Model to determine fragmentation requirements.

Retrieve the predefined drilling pattern and burden/spacing parameters from the Blast Design entry.

Calculate the ratio of explosive mass to the volume of rock to be fragmented (kg/m³).

Calculate the allowed charge weight per delay to comply with vibration safety limits.

Generate a new Blast Plan record containing the calculated parameters, pattern geometry, and explosive types.

Create a task for the Drilling Supervisor to execute the pattern according to the retrieved design.

Create a task for the Blasting Crew to perform hole charging and stemming.

Update the Blast Plan entry with actual drilling depths and any deviations encountered during drilling.

Check available emulsion or ANFO stock levels in the Inventory Data Model.

Subtract the quantity of explosives used from the Inventory Data Model.

Assign the final detonation and firing task to the certified Blaster-in-Charge.

Send an email notification to the Safety Officer regarding the scheduled blast time and exclusion zone setup.

Send an SMS alert to all site personnel in the vicinity to clear the blast area.

Create a new entry to record post-blast fragmentation results (e.g., % of oversize, mean fragment size).

Aggregate all recent fragmentation analysis entries to find the average particle size trend.

Generate a comprehensive report comparing the planned powder factor vs. actual fragmentation results.

Update the master Blast Log with a quality score based on the fragmentation analysis.

Край на работния поток/процеса.

Управление на Минното Дело
PDF (.pdf)
EXCEL (.xlsx)
CSV (.csv)

Намерихте ли този шаблон за работния процес полезен?

Обобщете и анализирайте този шаблон за работния процес с

Демонстрация на решението за управление на минното дело

Максимизирайте ефективността и безопасността в минните операции! ChecklistGuro рационализира управлението на задачите, проследяването на оборудването и отчитането на съответствието. Оптимизирайте работните процеси, намалете риска и увеличете производителността. Управлявайте всичко това с нашата платформа Work OS.

Свързани шаблони за работни потоци

Можем да го направим заедно

Нуждаете се от помощ с
Управление на добива?

Имате въпрос? Тук сме, за да помогнем. Моля, изпратете запитването си и ние ще отговорим своевременно.

Имейл
Как можем да помогнем?