| | | |
| Created by checklistguro.com | | |
| | | |
| Pre-Installation & Material Verification (STEP) | | |
| Sheathing Panel Width (ft) (NUMBER) | | |
| Sheathing Panel Length (ft) (NUMBER) | | |
| Sheathing Panel Type (SELECTION options: Plywood, OSB, Waferboard, Other (Specify)) | | |
| Sheathing Grade (if applicable) (TEXT) | | |
| Sheathing Exposure (if applicable) (SELECTION options: 1, 2, 3, 4) | | |
| Project Specifications for Sheathing Installation (notes) (TEXT) | | |
| Weather Conditions (Affecting Installation) (SELECTION options: Clear, Rain, Snow, Windy, Other (Specify)) | | |
| Other Pre-Installation Observations (TEXT) | | |
| | | |
| Fastener Selection & Inspection (STEP) | | |
| Fastener Type Specified in Plans? (SELECTION options: Yes, No) | | |
| Fastener Material (e.g., galvanized, stainless steel) (SELECTION options: Galvanized, Stainless Steel, Other (Specify)) | | |
| Fastener Length (inches) (NUMBER) | | |
| Fastener Diameter (inches) (NUMBER) | | |
| Fastener Head Type (SELECTION options: Flat Head, Bugle Head, Other (Specify)) | | |
| If 'Other' selected for Head Type, please specify: (TEXT) | | |
| Fasteners Corroded/Damaged? (SELECTION options: Yes, No) | | |
| If yes, describe damage: (TEXT) | | |
| | | |
| Sheathing Layout & Support (STEP) | | |
| Panel Width Variation (Maximum) (NUMBER) | | |
| Panel Length Variation (Maximum) (NUMBER) | | |
| Sheathing Alignment with Framing (SELECTION options: Parallel, Perpendicular, As per plans) | | |
| Panel Support Spacing Verified? (SELECTION options: Yes, No) | | |
| Maximum Distance Between Panel Supports (NUMBER) | | |
| Blocking Installed Per Plan? (SELECTION options: Yes, No, N/A) | | |
| Notes on Panel Support/Layout Deviations (TEXT) | | |
| | | |
| Fastening Pattern & Spacing (STEP) | | |
| Sheathing Edge Distance (inches) (NUMBER) | | |
| Fasterner Spacing (inches) - Field (NUMBER) | | |
| Fasterner Spacing (inches) - Perimeter (NUMBER) | | |
| Fasterner Pattern (e.g., Staggered, Uniform) (SELECTION options: Uniform, Staggered) | | |
| Minimum End Nail/Screw Spacing (inches) (NUMBER) | | |
| Sheathing Type (affects spacing) (SELECTION options: Plywood, OSB, Other) | | |
| Notes on Fastener Pattern Deviations (if any) (TEXT) | | |
| | | |
| Fastener Installation Quality (STEP) | | |
| Fascener Penetration Depth (inches) (NUMBER) | | |
| Number of Overdriven Fasteners Observed (NUMBER) | | |
| Number of Stripped Fastener Holes Observed (NUMBER) | | |
| Sheathing Compression Assessment (SELECTION options: Optimal, Slightly Compressed, Insufficient Compression) | | |
| Detailed Observations of Fastener Installation Quality (TEXT) | | |
| Fastener Head Flatness (SELECTION options: Satisfactory, Minor Dimpling, Significant Dimpling) | | |
| Number of Fasteners with Visible Head Damage (NUMBER) | | |
| | | |
| Edge Distance & Blockage (STEP) | | |
| Minimum Edge Distance from Sheathing End (inches) (NUMBER) | | |
| Minimum Edge Distance from Corner (inches) (NUMBER) | | |
| Sheathing Edge Blocking Required? (SELECTION options: Yes, No, NA) | | |
| Spacing of Blocking (inches, center-to-center) (NUMBER) | | |
| Blocking Material Type (if required) (SELECTION options: 2x4, 2x6, Other) | | |
| Details regarding blocking requirements (e.g., nailing schedule, span) (TEXT) | | |
| Edge Distance Verified Against Approved Plans? (SELECTION options: Yes, No, NA) | | |
| | | |
| Sheathing Edge Treatment (STEP) | | |
| Edge Sealing Method? (SELECTION options: Tape, Caulk, None, Other) | | |
| If 'Other' edge sealing method specified, describe: (TEXT) | | |
| Edge Distance to Framing (inches) (NUMBER) | | |
| Sheathing Edge Protection? (SELECTION options: Yes, No) | | |
| Description of Edge Protection (if applicable) (TEXT) | | |
| Photo Documentation of Edge Treatment (UPLOAD) | | |
| | | |
| Documentation & Record Keeping (STEP) | | |
| Inspection Date (DATE) | | |
| Inspection Time (DATE) | | |
| Sheathing Panel Sequence Number (NUMBER) | | |
| Observations & Comments (TEXT) | | |
| Compliance Status (SELECTION options: Compliant, Non-Compliant, Partial Compliance) | | |
| Corrective Actions Required (TEXT) | | |
| Corrective Action Completion Date (DATE) | | |
| Inspector Signature (SIGNATURE) | | |