Pre-Installation & Planning

1 of 10

Activities and verifications prior to commencing cladding installation. Includes design review, site conditions, and preparation.

Project Number

Scheduled Start Date

Review of Approved Shop Drawings

Relevant Permits Obtained?

Cladding System Type

Site Access & Safety Plan Review

Expected Duration of Cladding Installation (days)

Upload Relevant Drawings/Specifications

Substrate Preparation

2 of 10

Ensuring the underlying structure is suitable for cladding installation. Covers framing, sheathing, and any necessary modifications.

Sheathing Thickness (inches)

Framing Spacing (inches)

Sheathing Type

Description of any substrate modifications/repairs

Substrate Leveling Required?

Photos of Substrate Condition (before work)

Date Substrate Preparation Completed

Details of any sealant/adhesive applied and manufacturer details

Material Receipt & Storage

3 of 10

Verification of delivered cladding materials, including quantity, quality, and proper storage to prevent damage.

Quantity Received (per material type)

Quantity Ordered (per material type)

Material Condition Upon Arrival

Description of any Damage/Discrepancies

Photographs of Received Materials (if applicable)

Material Storage Location

Specifics of 'Other' Storage Location (if selected)

Date of Material Receipt

Materials Received

Layout & Shop Drawings

4 of 10

Confirmation of layout accuracy and adherence to shop drawings and design specifications.

Shop Drawing Review Status

Shop Drawing Upload

Shop Drawing Accuracy Verification

Discrepancy Notes (if applicable)

Offset Verification (if applicable)

Building Line Offset Value

Vertical Alignment Verification

Layout Approval Date

System Installation (Specific to Cladding Type)

5 of 10

Detailed steps and checks for the specific cladding system being installed (e.g., Brick, Siding, Metal Panels). This section will need to be expanded based on the type of cladding chosen.

Cladding Type Confirmed?

Specific Installation Instructions/Notes for Cladding Type:

Number of Rows/Courses Installed (Brick):

Number of Panels Installed:

Panel/Brick Alignment Checks:

Fastener Type Verified (if applicable):

Photo Documentation of Installation (1-3 Photos)

Quality Control & Inspections

6 of 10

Ongoing checks during installation to ensure adherence to quality standards and specifications.

Panel/Brick/Siding Alignment Tolerance (mm/inch)

Joint Width Consistency (mm/inch)

Panel/Brick/Siding Condition Upon Arrival (Visual Inspection)

Identify Potential Issues (Check all that apply)

Detailed Observations/Corrective Actions Taken

Flashings Installed Correctly?

Date of Inspection

Time of Inspection

Inspector Signature

Supporting Photos (Optional)

Flashing & Waterproofing

7 of 10

Verification of proper installation of flashing and waterproofing details to prevent water ingress.

Flashing Material Verified?

Describe Flashing Installation Details (Material, Placement, Overlap)

Flashing Installed per Approved Details?

Flashing Overlap (Minimum)

Note any deviations from specified flashing details.

Upload Photo of Flashing Installation

Membrane Waterproofing Installed (if applicable)?

Describe Waterproofing Application Method

Penetrations Properly Waterproofed?

Jointing & Sealing

8 of 10

Ensuring proper jointing and sealing of cladding elements for weather tightness and aesthetics.

Joint Width (mm)

Sealant Depth (mm)

Sealant Type Verified?

Backer Rod Used?

Notes on Joint Condition/Application

Joint Surface Preparation Verified (Clean, Dry, Sound)?

Photo Documentation of Jointing/Sealing

Finishing & Cleanup

9 of 10

Final tasks related to appearance and site cleanliness.

Overall Appearance Assessment: Describe any visible imperfections (scratches, blemishes, etc.)

Surface Cleaning Required?

Details of Cleaning Procedure (if applicable)

Amount of Cleaning Solution Used (if applicable)

Photographs of Finished Cladding System

Joint Sealer Condition?

Notes on joint sealant condition (if applicable)

Site Cleanup - Describe any remaining debris/waste.

Post-Installation & Documentation

10 of 10

Final inspections, documentation, and handover procedures.

Final Inspection Date

Inspector Name

Inspection Notes/Deficiencies

Warranty Period (Years)

As-Built Drawings

Outstanding Items/Follow-up Required?

Contact Person for Follow-up

Completion Date

Contractor Signature

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?