Pre-Installation & Planning
Activities and verifications prior to commencing cladding installation. Includes design review, site conditions, and preparation.
Project Number
Scheduled Start Date
Review of Approved Shop Drawings
Relevant Permits Obtained?
Cladding System Type
Site Access & Safety Plan Review
Expected Duration of Cladding Installation (days)
Upload Relevant Drawings/Specifications
Substrate Preparation
Ensuring the underlying structure is suitable for cladding installation. Covers framing, sheathing, and any necessary modifications.
Sheathing Thickness (inches)
Framing Spacing (inches)
Sheathing Type
Description of any substrate modifications/repairs
Substrate Leveling Required?
Photos of Substrate Condition (before work)
Date Substrate Preparation Completed
Details of any sealant/adhesive applied and manufacturer details
Material Receipt & Storage
Verification of delivered cladding materials, including quantity, quality, and proper storage to prevent damage.
Quantity Received (per material type)
Quantity Ordered (per material type)
Material Condition Upon Arrival
Description of any Damage/Discrepancies
Photographs of Received Materials (if applicable)
Material Storage Location
Specifics of 'Other' Storage Location (if selected)
Date of Material Receipt
Materials Received
Layout & Shop Drawings
Confirmation of layout accuracy and adherence to shop drawings and design specifications.
Shop Drawing Review Status
Shop Drawing Upload
Shop Drawing Accuracy Verification
Discrepancy Notes (if applicable)
Offset Verification (if applicable)
Building Line Offset Value
Vertical Alignment Verification
Layout Approval Date
System Installation (Specific to Cladding Type)
Detailed steps and checks for the specific cladding system being installed (e.g., Brick, Siding, Metal Panels). This section will need to be expanded based on the type of cladding chosen.
Cladding Type Confirmed?
Specific Installation Instructions/Notes for Cladding Type:
Number of Rows/Courses Installed (Brick):
Number of Panels Installed:
Panel/Brick Alignment Checks:
Fastener Type Verified (if applicable):
Photo Documentation of Installation (1-3 Photos)
Quality Control & Inspections
Ongoing checks during installation to ensure adherence to quality standards and specifications.
Panel/Brick/Siding Alignment Tolerance (mm/inch)
Joint Width Consistency (mm/inch)
Panel/Brick/Siding Condition Upon Arrival (Visual Inspection)
Identify Potential Issues (Check all that apply)
Detailed Observations/Corrective Actions Taken
Flashings Installed Correctly?
Date of Inspection
Time of Inspection
Inspector Signature
Supporting Photos (Optional)
Flashing & Waterproofing
Verification of proper installation of flashing and waterproofing details to prevent water ingress.
Flashing Material Verified?
Describe Flashing Installation Details (Material, Placement, Overlap)
Flashing Installed per Approved Details?
Flashing Overlap (Minimum)
Note any deviations from specified flashing details.
Upload Photo of Flashing Installation
Membrane Waterproofing Installed (if applicable)?
Describe Waterproofing Application Method
Penetrations Properly Waterproofed?
Jointing & Sealing
Ensuring proper jointing and sealing of cladding elements for weather tightness and aesthetics.
Joint Width (mm)
Sealant Depth (mm)
Sealant Type Verified?
Backer Rod Used?
Notes on Joint Condition/Application
Joint Surface Preparation Verified (Clean, Dry, Sound)?
Photo Documentation of Jointing/Sealing
Finishing & Cleanup
Final tasks related to appearance and site cleanliness.
Overall Appearance Assessment: Describe any visible imperfections (scratches, blemishes, etc.)
Surface Cleaning Required?
Details of Cleaning Procedure (if applicable)
Amount of Cleaning Solution Used (if applicable)
Photographs of Finished Cladding System
Joint Sealer Condition?
Notes on joint sealant condition (if applicable)
Site Cleanup - Describe any remaining debris/waste.
Post-Installation & Documentation
Final inspections, documentation, and handover procedures.
Final Inspection Date
Inspector Name
Inspection Notes/Deficiencies
Warranty Period (Years)
As-Built Drawings
Outstanding Items/Follow-up Required?
Contact Person for Follow-up
Completion Date
Contractor Signature
Construction Management Solution Screen Recording
See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation
Related Checklist Templates
Construction Material Inventory Checklist Template
Construction Material Inventory Tracking Checklist
Title Search & Insurance Checklist
Renovation Project Checklist
Roof Drainage System Inspection Checklist
Interior Painting Checklist
Warranty Documentation Checklist
Operation and Maintenance (O&M) Manuals Checklist
Site Mobilization Readiness Checklist
Tree Protection Measures Checklist
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.