Exterior Painting/Staining Checklist

Ensure a flawless exterior finish! Download our comprehensive Exterior Painting/Staining Checklist for Construction. Prevent costly mistakes, protect your investment, & achieve professional results. Includes prep work, application, & inspection - your ultimate guide to a beautiful, long-lasting exterior.

This Template was installed 2 times.

Project Planning & Preparation

1 of 6

Initial steps and considerations before any painting or staining begins. Includes material selection, permitting, and site protection.

Project Budget

Project Start Date (Planned)

Project Completion Date (Estimated)

Paint/Stain Type

Description of Scope of Work

Permit Required?

Site Photos (Pre-Project)

Notes on Existing Conditions (e.g., peeling, mold)

Surface Preparation

2 of 6

Crucial steps to ensure proper adhesion and a lasting finish. This includes cleaning, scraping, sanding, and repairing damage.

Describe Existing Condition of Surfaces (e.g., peeling paint, mildew, rot)

Identify Surface Issues to Address:

Estimated Square Footage to be Prepared

Describe Method Used for Cleaning (e.g., power washing, hand scrubbing)

PSI of Power Washer (if used)

Describe Repair Work Performed (e.g., wood replacement, patching)

Scraping Method Used:

Describe Sanding Process (grit sizes used, method)

Priming (If Applicable)

3 of 6

Details concerning the application of primer, including selection and proper technique.

Primer Type Selection

Primer Coverage Rate (sq ft/gallon)

Number of Primer Coats Applied

Primer Application Date

Notes on Primer Application (e.g., weather conditions, adhesion issues)

Primer Drying Time Adherance

Painting/Staining Application

4 of 6

Step-by-step instructions and checks for the actual painting or staining process.

First Coat Ambient Temperature (°F/°C)

First Coat Surface Temperature (°F/°C)

Second Coat Ambient Temperature (°F/°C)

Second Coat Surface Temperature (°F/°C)

Application Method (Brush, Roller, Sprayer)

First Coat Dry Time (Hours)

Second Coat Dry Time (Hours)

First Coat Coverage (Sq. Ft./Gallon)

Second Coat Coverage (Sq. Ft./Gallon)

Clean-up & Inspection

5 of 6

Final steps including cleanup, tool maintenance, and a thorough inspection of the finished product.

Debris Removal Complete?

Type of Waste Disposed Of (e.g., paint cans, rags)

Number of Paint Cans/Containers Recycled

Notes on Any Remaining Issues or Concerns

Overall Finish Quality (Subjective Assessment)

Date of Final Inspection

Detailed Description of any imperfections noted (e.g., runs, drips, color variations)

Safety & Environmental Considerations

6 of 6

Important safety precautions and environmental best practices to follow during the project.

Review SDS (Safety Data Sheet) for all materials?

Which PPE (Personal Protective Equipment) is being used?

Ventilation Plan (Describe)

Ambient Temperature (°F/°C)

Proper disposal method for paint/stain waste?

Spill Prevention & Control Measures

Is runoff being controlled to prevent environmental contamination?

Photos documenting environmental controls (if applicable)

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?