Geotechnical Investigation Review Checklist

Ensure construction project safety & success! Our Geotechnical Investigation Review Checklist guides you through essential soil & rock analysis, preventing costly errors & delays. Download now for a thorough, expert review! #geotechnical #construction #checklist #soiltesting #engineering

This Template was installed 3 times.

Display Style

Scope of Work & Objectives

1 of 9

Ensuring the investigation's scope aligns with the project's needs and intended use.

Describe the project's intended use and structural load requirements.

Summarize the stated objectives of the geotechnical investigation as outlined in the proposal/contract.

Was the scope of work sufficient to address the project's needs?

Estimated design loads (e.g., kPa or psf).

Describe any limitations or assumptions stated in the scope of work.

Which aspects of the project were explicitly covered in the scope?

Site Characterization & Geology

2 of 9

Review of site geology, topography, and existing conditions as documented in the report.

Briefly describe the site's geological setting (e.g., near a fault line, in an area of known landslides).

Maximum Slope Gradient (in degrees) observed at the site.

Topographic Map (showing contours, drainage patterns, and existing structures)

Was a review of historical aerial photographs/satellite imagery performed?

Describe any visible signs of instability (e.g., cracks in the ground, tilted trees, evidence of past erosion).

Are there any known geological hazards in the vicinity (e.g., active faults, karst topography)?

Describe the soil profile at the ground surface based on visual inspection (e.g., topsoil, sand, clay).

Borehole/Test Pit Locations & Density

3 of 9

Assessment of the adequacy of borehole/test pit locations and the number of explorations performed.

Number of Boreholes/Test Pits

Justification for Borehole/Test Pit Density

Borehole/Test Pit Location Accuracy (GPS Coordinates)

Were Boreholes/Test Pits located to investigate areas of concern (e.g., fills, slopes)?

Description of any deviations from proposed borehole/test pit locations

Were borehole/test pit locations representative of the site?

Site Plan Showing Borehole/Test Pit Locations

Soil/Rock Properties & Classification

4 of 9

Verification of soil/rock classification, index properties, and strength parameters.

Soil Classification System Used?

Detailed Description of Soil Types Encountered

Dry Density (lbs/ft³)

Moisture Content (%)

Liquid Limit (LL)

Plastic Limit (PL)

Plasticity Index (PI)

Laboratory Tests Performed (Select all that apply)

Notes/Comments regarding Soil/Rock Properties

Groundwater Conditions

5 of 9

Evaluation of groundwater levels, flow patterns, and potential impact on construction.

Highest Recorded Groundwater Level (ft below ground surface)

Lowest Recorded Groundwater Level (ft below ground surface)

Groundwater Flow Direction (based on piezometers/field observations)

Groundwater Flow Rate (estimated)

Description of any observed groundwater quality (e.g., color, odor, presence of contaminants)

Attach any piezometer data logs or monitoring records

Was a drawdown test performed?

Seismic Design Parameters

6 of 9

Review of seismic hazard assessments and ground motion parameters, if applicable.

Peak Ground Acceleration (PGA) - Horizontal

Peak Ground Acceleration (PGA) - Vertical

Design Response Spectrum Period (T)

Seismic Design Category (SDC)

Description of Seismic Hazard Assessment Methodology

Seismic Hazard Maps or Data

Site Class (per relevant code)

Recommendations & Design Considerations

7 of 9

Assessment of geotechnical recommendations and their impact on structural design and construction methods.

Evaluate Adequacy of Foundation Recommendations

Assess Slope Stability Recommendations (if applicable)

Verify Recommended Bearing Capacity (psf/kPa)

Review Retaining Wall Design Recommendations

Recommended Ground Improvement Techniques (Select all that apply)

Describe any concerns regarding settlement predictions

Foundation Type Recommended?

Notes regarding recommendations for Dewatering (if required)

Reporting & Documentation

8 of 9

Verification of data accuracy, clarity, and completeness of the geotechnical report.

Overall Clarity and Readability Assessment

Report Date Verification

Original Geotechnical Report

Units of Measurement Consistency

Summary of Key Findings & Assumptions

Report Accuracy - Data Validation

Notes on any missing information or potential errors

Compliance & Regulations

9 of 9

Confirmation that the investigation adheres to relevant codes, standards, and regulations.

Were applicable local building codes consulted?

Was the investigation performed in accordance with ASTM standards?

ASTM Standard Version Used (e.g., ASTM D420-21)

Describe any deviations from standard practices or regulations and justification.

Upload any permits or approvals related to the geotechnical investigation.

Was the investigation performed by a licensed geotechnical engineer?

More about this Template Construction Management

Frequently Asked Questions

Can I customize this template after installing it?

Absolutely. Once installed, you can add, remove, or reorder tasks, add custom fields, and adjust deadlines to fit your specific workflow.


Can I add images or photos to these checklist items?

Yes. Our platform allows you to attach photos, signatures, and notes to any checklist item for better verification and proof of completion.


Can I create a custom checklist from scratch instead of using a template?

Yes. You can use our "Create your own checklist" feature to build a unique workflow tailored exactly to your operational requirements.


Can I add dependencies between tasks?

Yes, you can set up conditional logic and dependencies to ensure your team follows the correct sequence of operations.


Can I assign specific checklist items to different team members?

Yes. You can assign individual tasks to specific employees, ensuring clear accountability across your entire team.


Can I use these checklists on mobile devices in the field?

Yes. Our platform is fully responsive, allowing your team to complete, update, and upload photos to checklists directly from any smartphone or tablet.


How do I notify my manager when a checklist is completed?

You can set up automated notifications (via email, push notification, or in-app alerts) to trigger whenever a checklist is finished or if an item fails inspection.


Can multiple people work on the same checklist simultaneously?

Yes, the platform supports real-time updates, allowing multiple users to contribute to a single live checklist.


Where is the data from completed checklists stored?

All completed checklists are stored securely in your Work OS dashboard, creating a permanent, searchable audit trail of your operations.


Can I generate reports based on my checklist results?

Yes. You can track completion rates, identify recurring issues, and monitor team performance through our integrated reporting and analytics tools.


How can I use these checklists for compliance or auditing purposes?

Because our checklists capture timestamps, photos, and digital signatures, they serve as a robust digital paper trail for regulatory compliance and internal audits.


Can I export my completed checklist data for use in other tools?

Yes. You can export your data in various formats (CSV, Excel, etc.) to integrate your operational insights with your other business software.


Summarize and Analyze this checklist template with

Comments

There are no comments yet. Be the first to add one!


Construction Management Solution Demo

Build smarter, not harder! ChecklistGuro streamlines construction projects from planning to closeout. Manage tasks, inspections, safety protocols & more - all in one place. Reduce delays, improve communication, and deliver projects on time & on budget.

Related Checklist Templates

Need help with
Construction?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email
How can we help?