ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Reinforcement Bar Placement Checklist (Rebar)

Ensure structural integrity with our comprehensive Reinforcement Bar Placement Checklist! Downloadable & printable, this Construction checklist guarantees accurate rebar placement, preventing costly errors & ensuring building code compliance. Perfect for contractors, engineers, and construction crews. Get yours now!

This Template was installed 5 times.

General Information

NaN of 9

Basic project and rebar information verification.

Project Name

Contractor

Rebar Supplier

Drawing Revision Number

Inspection Date

Area of Inspection

Inspector Name

Bar Identification & Shop Drawings

NaN of 9

Verification of bar mark numbers and conformance to shop drawings.

Shop Drawing Number Verified?

Shop Drawing Revision Checked:

Bar Mark Number on Bar Verified:

Bar Marks Confirmed (List separated by commas):

Discrepancies Noted (if any):

Rebar Type Consistent with Shop Drawing?

Photograph of Marked Bar (if discrepancy)

Bar Size and Quantity

NaN of 9

Ensuring correct bar sizes and the proper number of bars are installed.

Bar Mark Verification: Match Quantity from Shop Drawings?

Actual Number of #X Bar (e.g., #4) Installed

Quantity Variance: Actual - Required (#X Bar)

Bar Size Confirmation: Matched Shop Drawing Specification?

Bar Grade Verification (e.g., Grade 60)

Comments/Notes on Bar Size/Quantity Discrepancies (if any)

Bar Placement & Spacing

NaN of 9

Verification of bar positions, spacing, and cover requirements.

Bar Cover (mm)

Clear Distance Between Parallel Bars (mm)

Bar Alignment with Formwork

Notes on Bar Alignment (if misaligned)

Bar Placement Verification (Check All That Apply)

Additional Notes Regarding Bar Placement/Spacing

Vertical Bar Positioning

Bar Supports & Chairs

NaN of 9

Confirmation of proper bar support placement and functionality.

Chair Type & Size (Diameter)

Chair Material Verification

Number of Chairs Used

Location of Bar Supports (Grid Coordinates/Description)

Chair Condition (Visible Damage/Wear)

Support Adequate for Concrete Weight?

Photograph of Bar Supports in Place (Optional)

Lap Splices

NaN of 9

Checking lap splice lengths, bar placement, and tie requirements.

Lap Splice Length (mm/inches)

Splice Type (Overlap, Hooked, Mechanical)

Number of Bars in Lap Splice (Top)

Number of Bars in Lap Splice (Bottom)

Tie Wire/Spiral Present at Splice?

Notes/Observations regarding lap splice condition

Clearance Around Splice (Adequate?)

Photo Documentation (Optional)

Welded Fabric Reinforcement

NaN of 9

Verification of welding quality and proper alignment (if applicable).

Fabric Weld Quality Score (1-5, 5 being excellent)

Welding Defects Observed (Check all that apply)

Detailed Description of Welding Observations (if any)

Fabric Alignment with Formwork

Upload Photos of Welded Fabric Reinforcement

Welder Certification Verified?

Specialty Reinforcement

NaN of 9

Inspection of special bar types or configurations (e.g., headed bars, corner bars).

Type of Specialty Reinforcement Used:

If 'Other' selected above, please specify the specialty reinforcement type:

Quantity of Headed Bars Installed:

Quantity of Corner Reinforcement Installed:

Condition of Welded Connections (if applicable):

Upload Photo of Special Reinforcement Placement:

Unique Identifier/Tracking Number for Specialty Reinforcement:

Documentation & Sign-off

NaN of 9

Ensuring proper record-keeping and verification of completion.

Inspection Date

Inspection Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Inspector Name

Inspector Company

Comments/Observations

Rebar Placement Status

Area Checked (sq ft/m2)

Inspector Signature

Supporting Photos/Documents (optional)

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?