ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Topsoil Placement & Grading Checklist

Ensure flawless landscaping with our comprehensive Topsoil Placement & Grading Checklist! Perfect for construction projects, this checklist guarantees proper soil preparation, drainage, and a beautiful, stable foundation for your landscaping. Download now for construction professionals & DIYers.

This Template was installed 5 times.

Pre-Placement Verification

NaN of 8

Ensuring site conditions are ready for topsoil application.

Existing Grade Elevation (Min/Max)

Description of Existing Ground Conditions (e.g., fill, native soil)

Underlying Soil Type Verified?

Date of Site Survey/Grade Verification

Notes/Observations Regarding Existing Conditions

Utilities Located & Marked?

Site Survey/Grade Verification Document

Topsoil Quality & Testing

NaN of 8

Verifying the topsoil meets specified quality standards.

Topsoil Moisture Content (%)

Organic Matter Content (%)

pH Level

Particle Size Distribution (% Sand, Silt, Clay)

Topsoil Nutrient Levels (N, P, K)

Presence of Debris (Rocks, Roots, Construction Waste)

Laboratory Testing Report (PDF)

Additional Notes on Topsoil Quality

Topsoil Stockpiling & Handling

NaN of 8

Proper storage and handling of topsoil to prevent contamination and compaction.

Stockpile Location Verified and Approved?

Describe Stockpile Preparation (e.g., erosion control measures):

Estimated Volume of Topsoil Stockpiled (cubic yards):

Potential Contaminants Present?

Describe any observed contaminants:

Equipment Used for Handling Topsoil?

Describe any preventative measures taken to minimize compaction during handling:

Date of Stockpile Establishment:

Topsoil Placement

NaN of 8

Guidelines for the application and initial spreading of topsoil.

Topsoil Depth (inches)

Topsoil Placement Method

Specify 'Other' Placement Method (if selected)

Topsoil Material Source

Specify 'Other' Source (if selected)

Areas of Topsoil Placement

Specify 'Other' Areas (if selected)

Topsoil Placement Date

Grading & Shaping

NaN of 8

Procedures for achieving the desired final grade and contour.

Desired Topsoil Depth (inches)

Maximum Grade Variance Allowed (inches)

Grading Method Used

Describe any specific grading requirements (e.g., slopes, swales)

Method for Verification of Grade

Date of Initial Grading

Time of Initial Grading

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Notes on Grading and Shaping performed

Compaction & Settlement

NaN of 8

Managing compaction and allowing for settlement of the topsoil.

Initial Topsoil Moisture Content (%)

Target Topsoil Moisture Content (%)

Compaction Requirement (lbs/sq ft)

Compaction Method Used

Observations Regarding Compaction and Moisture

Date of Initial Compaction

Settlement Allowance (inches)

Date of Follow-up Settlement Observation

Protection & Erosion Control

NaN of 8

Measures to protect the topsoil and prevent erosion.

Erosion Control Blanket Installed?

Silt Fence Installed?

Mulch Depth (inches)

Description of Temporary Erosion Control Measures

Date of Mulching Application

Hydroseeding Completed?

Photos of Erosion Control Measures

Documentation & Approval

NaN of 8

Records and approvals related to topsoil placement and grading.

Date of Topsoil Placement

Project Description & Scope of Topsoil Work

Topsoil Volume Placed (cubic yards)

Topsoil Analysis Report (Lab Results)

Topsoil Source

Contractor Representative Signature

Project Inspector/Engineer Signature

Notes/Observations/Deviations from Specifications

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?