Window & Door Weatherstripping Checklist

Boost your home's energy efficiency & comfort! Our comprehensive Window & Door Weatherstripping Checklist (Construction) guides you step-by-step to seal drafts, lower energy bills, and prevent costly repairs. Download now for a warmer, quieter home!

This Template was installed 3 times.

Pre-Inspection & Planning

1 of 7

Initial assessment of windows and doors, identifying areas needing weatherstripping and planning materials and tools.

Window Type(s)

Areas of Concern (Check all that apply)

Estimated Number of Windows

Estimated Number of Doors

Specific Observations/Notes

Weather Exposure

Inspection Date

Material Selection & Acquisition

2 of 7

Choosing the appropriate weatherstripping materials based on window/door type, gap size, and climate conditions. Procuring necessary materials.

Window/Door Type

Maximum Gap Size (inches)

Weatherstripping Material Preference

Climate Considerations

Notes on Specific Material Requirements

Quantity of Weatherstripping (feet)

Supplier Selection

Existing Weatherstripping Removal

3 of 7

Careful removal of old or damaged weatherstripping, minimizing damage to window/door frames.

Type of Existing Weatherstripping

Describe Condition of Existing Weatherstripping (e.g., brittle, crumbling, detached)

Removal Method Used

Note any damage to the window or door frame during removal.

Number of Weatherstripping Sections Removed

Describe any adhesive residue left behind.

Surface Preparation

4 of 7

Cleaning and preparing surfaces where new weatherstripping will be applied. Ensuring proper adhesion.

Describe any existing damage to the frame (rot, cracks, peeling paint).

What is the current surface condition?

Approximate temperature (°F) during preparation.

Cleaning Solution Used (e.g., TSP, All-Purpose Cleaner).

Did you use a primer?

If primer was used, describe the type and application method.

Surface dry to touch?

Weatherstripping Installation

5 of 7

Step-by-step installation of the selected weatherstripping materials. Ensuring a tight seal.

Weatherstripping Type Applied:

If 'Other' Selected Above, Specify Weatherstripping Type:

Length of Weatherstripping Installed (feet):

Application Method:

Detailed Installation Notes:

Alignment Verification:

Post-installation concerns (if any):

Testing & Adjustment

6 of 7

Testing the weatherstripping for air and water leaks. Making any necessary adjustments to ensure a perfect seal.

Initial Leak Test - Visual Inspection

Draft Measurement (CFM)

Smoke Test Result

Adjustment Notes

Final Leak Test - Overall Assessment

Temperature Differential (Interior/Exterior)

Cleanup & Disposal

7 of 7

Cleaning up debris and properly disposing of old weatherstripping and waste materials.

Waste Material Types

Specify 'Other' Waste Materials (if applicable)

Disposal Method

Specify 'Other' Disposal Method (if applicable)

Estimated Waste Volume (Cubic Feet)

Responsible Party for Disposal

Disposal Completion Date

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?