ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Cargo Temperature Control Verification (Refrigerated Transport) Checklist

Ensure perishable cargo arrives safely! Our Cargo Temperature Control Verification checklist (Refrigerated Transport) guarantees compliance & prevents spoilage. Downloadable, customizable & essential for logistics professionals. Maintain cold chain integrity - protect your shipments!

This Template was installed 1 times.

Pre-Departure Equipment & Vehicle Checks

NaN of 7

Verification of the refrigeration unit and vehicle condition prior to loading cargo.

Refrigeration Unit Voltage (V)

Refrigeration Unit Amperage (A)

Ambient Temperature (°C/°F)

Refrigeration Unit Set Point (°C/°F)

Refrigeration Unit Operational Status

Vehicle Temperature Recorder Operational?

Comments/Observations (e.g., unusual noises, leaks)

Pre-Departure Photos/Documentation (Optional)

Cargo Loading & Initial Temperature Recording

NaN of 7

Checks performed during loading to ensure correct cargo placement and initial temperature settings.

Initial Cargo Temperature (°C/°F)

Target Temperature Range (°C/°F)

Refrigeration Unit Operating Mode

Cargo Placement - Proximity to Refrigeration Unit

Notes on Cargo Loading and Initial Conditions (e.g., packaging, visible damage)

Time of Initial Temperature Recording

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Product Type

En-Route Temperature Monitoring & Logging

NaN of 7

Regular temperature checks and data recording throughout the transport journey.

Time of First Temperature Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature Reading (°C/°F)

Ambient Temperature (°C/°F)

Refrigeration Unit Status

Observations/Notes (e.g., humidity, unusual noises)

Date of Temperature Check

Time of Temperature Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

GPS Location (Latitude)

GPS Location (Longitude)

Temperature Deviation & Corrective Actions

NaN of 7

Procedures for addressing any temperature excursions during transport.

Time of Deviation Detected

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature at Time of Deviation (°C/°F)

Target Temperature (°C/°F)

Reason for Deviation (Select Best Fit)

Detailed Description of Deviation and Possible Cause

Corrective Actions Taken

Time Corrective Action Completed

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature After Corrective Action (°C/°F)

Effect on Cargo (Risk Assessment)

Signature of Person Implementing Corrective Action

Arrival & Final Temperature Recording

NaN of 7

Verification of cargo temperature upon arrival and documentation of final readings.

Arrival Temperature (Cargo)

Arrival Temperature (Refrigeration Unit)

Average Temperature during Transit

Temperature within acceptable range?

Observations/Comments on Arrival Condition (e.g., condensation, ice build-up)

Date of Arrival

Time of Arrival

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Describe any deviations from expected temperature range or conditions.

Recipient Acceptance of Cargo Temperature

Signature of Receiving Personnel

Documentation & Record Keeping

NaN of 7

Ensuring all temperature data, deviations, and corrective actions are properly recorded and maintained.

Date of Transport

Departure Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Arrival Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Initial Temperature (Pre-Loading)

Final Temperature (Arrival)

Temperature Logs / Data Recording (Attach screenshot/export)

Any Temperature Deviations & Corrective Actions Taken

Compliance with Temperature Requirements?

Supporting Documentation (e.g., Reefer Unit Maintenance Records)

Signature of Verifying Personnel

Equipment Calibration & Maintenance

NaN of 7

Schedule and records related to the calibration and maintenance of temperature monitoring equipment.

Last Calibration Date (Temperature Sensors)

Calibration Accuracy (+/-)

Next Calibration Due Date (Temperature Sensors)

Calibration Method

Calibration Results/Observations

Calibration Certificate (If Applicable)

Last Maintenance Date (Refrigeration Unit)

Maintenance Performed (Refrigeration Unit)

Found this Checklist Template helpful?

Logistics Management Solution

Tired of shipping delays, lost packages, and inefficient routes? ChecklistGuro's Work OS platform streamlines your entire logistics operation, from warehouse management and order fulfillment to route optimization and delivery tracking. Gain real-time visibility, reduce costs, and improve customer satisfaction. Learn how ChecklistGuro can transform your logistics business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?