ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Cargo Temperature Control Verification (Refrigerated Transport) Checklist

Ensure perishable cargo arrives safely! Our Cargo Temperature Control Verification checklist (Refrigerated Transport) guarantees compliance & prevents spoilage. Downloadable, customizable & essential for logistics professionals. Maintain cold chain integrity - protect your shipments!

This Template was installed 2 times.

Pre-Departure Equipment & Vehicle Checks

1 of 7

Verification of the refrigeration unit and vehicle condition prior to loading cargo.

Refrigeration Unit Voltage (V)

Refrigeration Unit Amperage (A)

Ambient Temperature (°C/°F)

Refrigeration Unit Set Point (°C/°F)

Refrigeration Unit Operational Status

Vehicle Temperature Recorder Operational?

Comments/Observations (e.g., unusual noises, leaks)

Pre-Departure Photos/Documentation (Optional)

Cargo Loading & Initial Temperature Recording

2 of 7

Checks performed during loading to ensure correct cargo placement and initial temperature settings.

Initial Cargo Temperature (°C/°F)

Target Temperature Range (°C/°F)

Refrigeration Unit Operating Mode

Cargo Placement - Proximity to Refrigeration Unit

Notes on Cargo Loading and Initial Conditions (e.g., packaging, visible damage)

Time of Initial Temperature Recording

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Product Type

En-Route Temperature Monitoring & Logging

3 of 7

Regular temperature checks and data recording throughout the transport journey.

Time of First Temperature Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature Reading (°C/°F)

Ambient Temperature (°C/°F)

Refrigeration Unit Status

Observations/Notes (e.g., humidity, unusual noises)

Date of Temperature Check

Time of Temperature Check

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

GPS Location (Latitude)

GPS Location (Longitude)

Temperature Deviation & Corrective Actions

4 of 7

Procedures for addressing any temperature excursions during transport.

Time of Deviation Detected

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature at Time of Deviation (°C/°F)

Target Temperature (°C/°F)

Reason for Deviation (Select Best Fit)

Detailed Description of Deviation and Possible Cause

Corrective Actions Taken

Time Corrective Action Completed

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Temperature After Corrective Action (°C/°F)

Effect on Cargo (Risk Assessment)

Signature of Person Implementing Corrective Action

Arrival & Final Temperature Recording

5 of 7

Verification of cargo temperature upon arrival and documentation of final readings.

Arrival Temperature (Cargo)

Arrival Temperature (Refrigeration Unit)

Average Temperature during Transit

Temperature within acceptable range?

Observations/Comments on Arrival Condition (e.g., condensation, ice build-up)

Date of Arrival

Time of Arrival

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Describe any deviations from expected temperature range or conditions.

Recipient Acceptance of Cargo Temperature

Signature of Receiving Personnel

Documentation & Record Keeping

6 of 7

Ensuring all temperature data, deviations, and corrective actions are properly recorded and maintained.

Date of Transport

Departure Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Arrival Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Initial Temperature (Pre-Loading)

Final Temperature (Arrival)

Temperature Logs / Data Recording (Attach screenshot/export)

Any Temperature Deviations & Corrective Actions Taken

Compliance with Temperature Requirements?

Supporting Documentation (e.g., Reefer Unit Maintenance Records)

Signature of Verifying Personnel

Equipment Calibration & Maintenance

7 of 7

Schedule and records related to the calibration and maintenance of temperature monitoring equipment.

Last Calibration Date (Temperature Sensors)

Calibration Accuracy (+/-)

Next Calibration Due Date (Temperature Sensors)

Calibration Method

Calibration Results/Observations

Calibration Certificate (If Applicable)

Last Maintenance Date (Refrigeration Unit)

Maintenance Performed (Refrigeration Unit)

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?