8S (5S + Safety + Sanitation + Standardized Work) Checklist

Download our free 8S Checklist (5S + Safety + Sanitation + Standardized Work) Excel template to optimize workflows and boost operational productivity today.

Label Value Notes
Created by checklistguro.com
Sort (Seiri) (STEP)
Describe items identified for removal during Sort. (TEXT)
What categories of items were removed? (SELECTION options: Obsolete Inventory, Broken Equipment, Unused Tools, Excess Materials, Personal Items, Other (Specify in LONG_TEXT))
Number of items removed. (NUMBER)
Were items moved to a 'holding area' for potential reuse/disposal? (SELECTION options: Yes, No)
If 'Yes' to the previous question, describe the holding area and its purpose. (TEXT)
Was a 'Red Tag' system used for items being evaluated? (SELECTION options: Yes, No)
If 'Yes', describe how the red tag system was implemented and what criteria were used. (TEXT)
Date items were removed (DATE)
Set in Order (Seiton) (STEP)
Location of Tools/Equipment (Distance in meters) (NUMBER)
Clearly Marked Location for Frequently Used Tools (LOCATION)
Shadow Boards Used for Tools? (SELECTION options: Yes, No)
Are Tool/Equipment Locations Clearly Marked? (SELECTION options: Yes, No)
What visual aids are used for organization? (SELECTION options: Color Coding, Labeling, Floor Markings, Shadow Boards, Other (Specify))
Describe any deviations from the defined layout and explain reasons (TEXT)
Photo of current layout (Optional) (UPLOAD)
Shine (Seiso) (STEP)
Overall Cleanliness Score (1-5, 5 being spotless) (NUMBER)
Describe cleaning tasks completed today (e.g., machine cleaning, floor scrubbing, spill cleanup) (TEXT)
Areas cleaned today (check all that apply) (SELECTION options: Machine Surfaces, Floors, Work Benches, Equipment Casings, Walls, Storage Areas)
Photo Evidence of Cleaning (Optional) (UPLOAD)
Note any areas requiring further or more frequent cleaning. (TEXT)
Time spent on cleaning activities (in minutes) (NUMBER)
Type of cleaning chemicals used (if applicable) (SELECTION options: None, Degreaser, All-Purpose Cleaner, Specialized Cleaner)
Standardize (Seiketsu) (STEP)
Frequency of 5S Audits: (SELECTION options: Daily, Weekly, Bi-weekly, Monthly)
Time allocated for daily cleaning (minutes): (NUMBER)
Photographs of standardized layouts (before/after) (UPLOAD)
Detailed description of the visual management system: (TEXT)
Method for reporting 5S violations: (SELECTION options: Verbal Report, Written Form, Online System)
Date of last 5S training session: (DATE)
Describe process for updating standardized procedures: (TEXT)
Sustain (Shitsuke) (STEP)
Frequency of 5S Audits (Weeks) (NUMBER)
Last 5S Training Date (DATE)
5S Champion Identified? (SELECTION options: Yes, No)
Summary of Corrective Actions Needed (from previous audits) (TEXT)
Which of the following support mechanisms are in place? (SELECTION options: Management Review, Employee Recognition, Regular Communication, Training Refresher, Suggestion Box)
Are audit results communicated to employees? (SELECTION options: Yes, No)
Notes/Comments on Sustainment Efforts (TEXT)
Safety (STEP)
PPE Availability (Count of Required Items) (NUMBER)
Hazard Identification - Confined Spaces? (SELECTION options: Yes, No)
Hazard Identification - Lockout/Tagout? (SELECTION options: Yes, No)
Describe any observed safety hazards. (TEXT)
Distance from moving equipment (feet) (NUMBER)
Emergency Stop functionality? (SELECTION options: Fully Functional, Partially Functional, Not Functional)
Last Safety Training Date (DATE)
Sanitation (STEP)
Frequency of Cleaning (Days) (NUMBER)
Areas Cleaned (Check all that apply) (SELECTION options: Floors, Equipment Surfaces, Work Benches, Walls, Storage Areas, Drainage Systems)
Specific Cleaning Agents Used (List chemicals and concentrations) (TEXT)
Photos of Cleaning Procedure (UPLOAD)
Type of Waste Generated (Select best fit) (SELECTION options: Organic, Chemical, General Waste, Hazardous Waste)
Last Sanitation Inspection Date (DATE)
Any Issues/Corrective Actions Required (TEXT)
Pest Control Status (SELECTION options: Active, Inactive, Scheduled)
Standardized Work (STEP)
Is a current Standard Operating Procedure (SOP) available for this process? (SELECTION options: Yes, No, Not Applicable)
Briefly describe the process being standardized. (TEXT)
Cycle time (minutes) – as per documented Standard. (NUMBER)
Actual cycle time observed (minutes). (NUMBER)
Is the standardized work instructions readily accessible to all personnel? (SELECTION options: Yes, No, Partially)
Upload a copy of the Standardized Work Instruction (SWI) document. (UPLOAD)
Describe any deviations from the standardized work process observed. (TEXT)
Is training provided and documented for this standardized work? (SELECTION options: Yes, No, Needs Update)

Manufacturing Management Solution Demo

Stop chasing paperwork and wrestling with disconnected systems! Our solution brings clarity and control to your production process. From standard operating procedures (SOPs) and equipment maintenance to quality control and inventory tracking, we simplify every step.



Comments

There are no comments yet. Be the first to add one!


Related Media Files