Concrete Delivery & Placement Checklist
Ensure flawless concrete projects! Download our free Concrete Delivery & Placement Checklist - a comprehensive guide for construction professionals. Minimize costly errors, maximize strength, and streamline your workflow. Perfect for contractors, builders, and anyone working with concrete. Get your checklist today!
This Template was installed 0 times.
Pre-Pour Planning & Preparation
Ensuring everything is ready *before* the concrete arrives.
Planned Pour Date
Estimated Pour Start Time
Estimated Concrete Volume (cubic yards)
Excavation Status
Formwork Status
Specific Site Preparation Notes (Compaction, Ground Conditions, etc.)
Utilities Located & Marked?
Site Preparation Photos (Optional)
Concrete Ordering & Mix Design
Verification of concrete specifications and delivery schedule.
Total Concrete Volume (cubic yards)
Concrete Strength (psi) - Specified
Special Mix Requirements (e.g., admixtures, color)
Slump (inches) - Specified
Scheduled Delivery Date
Scheduled Delivery Time (start window)
Concrete Supplier Name
Number of Concrete Trucks Required
Delivery & Hauling
Checking the concrete during transport and ensuring proper conditions.
Scheduled Delivery Time
Actual Delivery Time (minutes late/early)
Concrete Supplier
Supplier Representative Name & Contact Info
Hauler
Concrete Temperature (°F/°C)
Ambient Temperature (°F/°C)
Weather Conditions
Observations during Delivery (e.g., segregation, spillage)
Placement & Consolidation
Ensuring correct placement techniques and proper consolidation.
Placement Method Verified (Pump, Bucket, Manual)
Concrete Slump (in)
Vibration Equipment Used
Vibration Spacing (ft)
Over-Consolidation Observed?
Notes on Consolidation & Placement
Finishing & Curing
Correct finishing methods and proper curing procedures for optimal strength and durability.
Finishing Method Used
If 'Other' finishing method selected, please describe:
Ambient Temperature (°C)
Concrete Temperature (°C)
Curing Method
If 'Other' curing method selected, please describe:
Start of Curing Date
Curing Duration (Days)
Moisture Content of Curing Material (if applicable)
Quality Control & Documentation
Records of all processes and quality checks performed.
Concrete Slump Test Result (in)
Air Content (%)
Temperature of Concrete (F)
Mix Design Verification Status
Comments / Deviations from Plan
Pour Date
Time of Pour Start
Supporting Photos / Documents
Concrete Test Cylinder Status
Inspector Signature
Construction Management Solution Screen Recording
See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation
Related Checklist Templates
Construction Material Inventory Checklist Template
Construction Material Inventory Tracking Checklist
Title Search & Insurance Checklist
Renovation Project Checklist
Roof Drainage System Inspection Checklist
Interior Painting Checklist
Warranty Documentation Checklist
Operation and Maintenance (O&M) Manuals Checklist
Site Mobilization Readiness Checklist
Tree Protection Measures Checklist
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.