Electrical Wiring Inspection Checklist

Ensure safe and compliant electrical installations! Download our comprehensive Electrical Wiring Inspection Checklist for construction projects. Cover critical wiring, grounding, and code adherence - avoid costly errors & protect your build. Free, printable & easy to use.

This Template was installed 1 times.

General Requirements & Documentation

NaN of 10

Review of permits, plans, and general compliance with applicable codes and regulations.

Permit Number

Project Description

Inspection Date

Code Compliance Standard

Approved Electrical Plans

Square Footage of Building

Type of Occupancy

Notes/Comments on Documentation Review

Main Service Entrance

NaN of 10

Inspection of the service entrance conductors, meter base, service disconnect, and grounding system.

Service Voltage (e.g., 120/240V)

Service Capacity (Amps)

Meter Base Condition

Service Disconnect Labeling (Amps & Voltage)

Service Entrance Conductor Type

Grounding Electrode Size (if applicable)

Any observed issues or comments regarding the service entrance?

Bonding Condition

Panelboards & Overcurrent Protection

NaN of 10

Evaluation of panelboard labeling, circuit breakers/fuses, and overcurrent protection devices.

Panelboard Voltage Rating (V)

Panelboard Location (Indoor/Outdoor)

Number of Circuit Breakers Installed

Panelboard Labeling (Select all that apply)

Circuit Breaker Type (Select One)

Circuit Breaker Ampacity (A)

Any Visible Damage or Corrosion?

Panelboard is Properly Secured?

Branch Circuits & Wiring Methods

NaN of 10

Assessment of branch circuit wiring, conduit fill, cable supports, and proper wiring methods (e.g., NM, MC, EMT).

Conduit Fill Percentage:

Wiring Method Verification (Select all that apply):

If 'Other' wiring method selected above, please specify:

Number of Branch Circuits Identified:

Wiring Secured Appropriately?

Photograph of Conduit Installation (if needed)

Wire Gauge (e.g., 12 AWG) Verification - All Circuits:

Proper Wire Type Used?

Grounding & Bonding

NaN of 10

Verification of grounding electrode system, grounding conductors, bonding jumpers, and equipment grounding.

Type of Grounding Electrode System?

Ground Rod Depth (inches)

Ground Wire Size (AWG)

Description of Bonding Jumpers (size, material, location)

Bonding of Exposed Metallic Piping?

Resistance to Ground (Ohms)

Notes on Grounding System

Receptacles & Switches

NaN of 10

Inspection of receptacle wiring, grounding, tamper resistance, and switch functionality.

Receptacle Grounding Status

Receptacle Tamper Resistance

Receptacle Voltage (V)

Switch Functionality

Switch Wiring Observations

Receptacle Type

Receptacle/Switch Notes

Lighting Fixtures

NaN of 10

Assessment of lighting fixture installation, proper grounding, and compliance with code requirements.

Fixture Type (e.g., LED, Fluorescent)

Number of Fixtures Inspected

Fixture Securely Mounted?

Proper Grounding Connection?

Notes on Wiring (e.g., cable type, connection quality)

Appropriate Wattage Rating?

Upload Photo of Fixture Installation (if issues found)

Special Equipment (HVAC, Water Heaters, etc.)

NaN of 10

Review of electrical connections to appliances, equipment, and other specialized systems.

Water Heater Disconnect Location

Water Heater Voltage (V)

HVA/C Unit Proper Grounding?

Detailed Observations regarding HVAC wiring

Dedicated Circuit for Water Heater?

Attach Photo of Equipment Connection

Amperage Rating of Dedicated Circuit (A)

GFCI Protection for Water Heater?

Smoke Detectors & Carbon Monoxide Detectors

NaN of 10

Verification of proper installation, functionality, and compliance with local codes for fire safety devices.

Smoke Detector Location - Living Room

Carbon Monoxide Detector Location - Near Bedrooms

Smoke Detector Power Source

Number of Smoke Detectors Installed

Smoke Detector Interconnection

Notes/Comments on Smoke/CO Detector Installation

CO Detector Tested and Working?

Date of Last CO Detector Test (if applicable)

Final Sign-Off & Remediation

NaN of 10

Documentation of inspection findings, required corrections, and final sign-off upon completion of remediation.

Date of Final Inspection

Time of Final Inspection

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Summary of Findings & Required Corrections (Detailed)

Were all previously identified deficiencies corrected?

Number of Open/Uncorrected Items

Description of any remaining deficiencies (if applicable)

Inspector's Recommendation:

Inspector's Signature

Inspector's Printed Name

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?