Fire Sprinkler System Installation Checklist

Ensure a safe and compliant construction project with our comprehensive Fire Sprinkler System Installation Checklist! This essential guide covers all critical steps, from planning and permits to testing and commissioning, guaranteeing a properly installed and life-saving sprinkler system. Download now for construction professionals!

This Template was installed 2 times.

Pre-Installation Planning & Permits

1 of 9

Activities related to planning, design review, and obtaining necessary approvals before any physical installation begins.

Project Start Date

Project Description & Scope of Work

Authority Having Jurisdiction (AHJ)

Approved Sprinkler System Shop Drawings

Permit Number

Permit Status

Notes on Permit Approval/Rejection

Site Preparation & Layout

2 of 9

Tasks involving site clearing, excavation, and initial layout for sprinkler system components.

Existing Utility Location Verification

Sprinkler System Layout Marked on Site

Elevation Difference for Pipe Slope (if applicable)

Ground Condition Assessment (e.g., stable, unstable, rocky)

Date of Site Survey/Layout Verification

Notes on Site Preparation (e.g., obstructions, access limitations)

Pipe Installation & Support

3 of 9

Installation of piping, including cutting, threading, welding, and securing pipes with appropriate hangers and supports.

Pipe Diameter (inches)

Pipe Material Thickness (schedule)

Pipe Material Type

If 'Other' Pipe Material Selected, Please Specify:

Number of Pipe Hangers Installed

Hanger Spacing Verified?

If Hanger Spacing Not Verified, Explain:

Pipe Alignment Verified?

Pipe Installation Photos

Sprinkler Head Installation

4 of 9

Correct placement and securing of sprinkler heads, ensuring proper orientation and spacing.

Sprinkler Head ID (Sequential)

Sprinkler Head Type

Sprinkler Head Orientation

Sprinkler Head Temperature Rating (degrees F)

Sprinkler Head Location (Grid Coordinates or Description)

Manufacturer & Model Number

Distance from Wall (inches)

Sprinkler Head Condition (Post Install)

Notes/Comments regarding installation

Riser Installation

5 of 9

Installation of vertical piping (risers) connecting the water supply to the sprinkler system distribution.

Riser Pipe Diameter (inches)

Riser Material Type

Number of Risers Installed

Riser Location (coordinates/description)

Riser Installation Completion Date

Details of Riser Support System (type, spacing)

Riser Insulation Type (if applicable)

Hydrostatic Test Pressure (PSI)

Control Valve & Alarm Panel Installation

6 of 9

Installation and connection of the control valve, alarm panel, and related electrical components.

Control Valve Size (inches)

Control Valve Type

Alarm Panel Model Number

Alarm Panel Wiring Diagram Verification Notes

Alarm Panel Programming Completion Date

Supervisory Switch Settings (PSI)

Tamper Switch Functionality Test Result

Control Valve Labeling Verification (Yes/No)

Fire Department Connection (FDC)

7 of 9

Installation and testing of the FDC, ensuring proper connection and functionality.

FDC Connection Size (inches)

FDC Valve Type

If 'Other' valve type selected, specify:

FDC Signage Present & Visible?

If 'No' signage present, provide explanation:

Date of FDC Inspection

Time of FDC Inspection

FDC Pressure (PSI)

Upload Photo of FDC Installation

System Testing & Flushing

8 of 9

Comprehensive testing of the system, including hydrostatic testing, flow testing, and flushing to remove debris.

Hydrostatic Test Pressure (PSI)

Hydrostatic Test Duration (Minutes)

Flow Test Pressure (PSI)

Flow Rate (GPM)

Flush Water Clarity

Notes on Flush Water Clarity (if not Clear)

Hydrostatic Test Date

Hydrostatic Test Time

Hydrostatic Test Record/Graph

Documentation & As-Built Drawings

9 of 9

Creation and review of as-built drawings and all necessary documentation for system recordkeeping.

Original System Design Drawings

Permit Documentation (Approved Plans, Inspection Reports)

Description of Deviations from Original Design (if any)

As-Built Drawings (Signed and Dated)

Date of As-Built Drawing Completion

Hydrostatic Test Pressure (in PSI)

Hydrostatic Test Duration (in minutes)

Contractor Representative Signature

Owner/Client Representative Signature

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?