ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Flooring Installation Checklist

Ensure a flawless flooring installation! Download our comprehensive Flooring Installation Checklist - your guide to subfloor prep, material inspection, layout, adhesives, and finishing. Perfect for contractors & DIYers. Avoid costly mistakes & achieve professional results! #flooring #construction #checklist #installation #DIY #contractor

This Template was installed 3 times.

Pre-Installation Assessment

NaN of 8

Verify the existing subfloor is suitable for the new flooring. Includes moisture testing, levelness checks, and structural integrity evaluation.

Subfloor Levelness (Max Deviation)

Subfloor Type

Moisture Content (Subfloor)

Moisture Content (Flooring)

Subfloor Condition

Notes on Subfloor Assessment

Subfloor Photos

Material Delivery & Acclimation

NaN of 8

Ensure flooring materials are delivered, inspected, and properly acclimated to the environment.

Material Delivery Date

Delivery Confirmation Notes (Driver Signature, Condition upon arrival)

Quantity Delivered (Square Feet/Units)

Quantity Ordered (Square Feet/Units)

Material Condition Upon Arrival

Acclimation Start Date (Days)

Acclimation Start Date

Acclimation Environment Details (Temperature, Humidity)

Acclimation Complete?

Acclimation Notes (Observations, Adjustments)

Subfloor Preparation

NaN of 8

Address and rectify any subfloor issues such as leveling, cleaning, patching, and applying appropriate underlayment or moisture barrier.

Subfloor Levelness (Deviation Limit)

Subfloor Type

Moisture Content (Subfloor)

Moisture Content (Air)

Moisture Barrier Required?

Subfloor Repair Notes

Subfloor Condition Photo(s)

Underlayment Type (if applicable)

Layout & Planning

NaN of 8

Determine the optimal layout to minimize waste and ensure a visually appealing final product.

Room Dimensions (Length)

Room Dimensions (Width)

Total Square Footage

Waste Factor (%)

Direction of Flooring (with respect to longest wall)

Notes on Layout Considerations (e.g., furniture placement, door swing)

Pattern Type (if applicable)

Detailed Layout Sketch or Diagram (Optional)

Flooring Installation

NaN of 8

The core process of installing the chosen flooring material according to manufacturer's instructions and best practices.

Manufacturer's Installation Instructions Followed?

Room Temperature (During Installation)

Adhesive Type (If Applicable)

Expansion Gap Considerations?

Flooring Pattern

Specific Installation Challenges Encountered (if any)?

Number of Flooring Boxes Installed

Seams, Transitions & Trim

NaN of 8

Properly manage seams, transitions between flooring types, and installation of baseboards, quarter-round, and other trim.

Seam Adhesive Type

Seam Adhesive Notes (If 'Other' Selected)

Transition Strip Type

Transition Strip Fastener Count (per strip)

Trim Installation Notes

Caulk Used (Baseboards/Transitions)

Caulk Notes (If 'Other' Selected)

Installer Signature (Seam/Transition Approval)

Finishing & Clean-Up

NaN of 8

Final steps including cleaning, sealing (if applicable), and ensuring a pristine finished surface.

Describe any final cleaning procedures performed (e.g., sweeping, vacuuming, mopping)

Was a floor sealant applied?

If sealant was applied, how many coats?

Note any specific instructions given to the client regarding post-installation care (e.g., avoiding heavy furniture, recommended cleaning products)

Were excess adhesive or grout remnants removed?

Describe any touch-up work performed (e.g., filling minor scratches, correcting imperfections)

Quality Control & Client Walkthrough

NaN of 8

Conduct a thorough inspection to identify and correct any imperfections, and perform a walkthrough with the client for approval.

Overall Impression Notes

Are there any visible imperfections? (Select all that apply)

Subfloor Levelness (in inches)

Seam Visibility - Acceptable?

Client Concerns/Feedback

Client Satisfaction Level

Walkthrough Date

Walkthrough Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Client Signature

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?