Flooring Installation Checklist

Ensure a flawless flooring installation! Download our comprehensive Flooring Installation Checklist - your guide to subfloor prep, material inspection, layout, adhesives, and finishing. Perfect for contractors & DIYers. Avoid costly mistakes & achieve professional results! #flooring #construction #checklist #installation #DIY #contractor

This Template was installed 4 times.

Pre-Installation Assessment

1 of 8

Verify the existing subfloor is suitable for the new flooring. Includes moisture testing, levelness checks, and structural integrity evaluation.

Subfloor Levelness (Max Deviation)

Subfloor Type

Moisture Content (Subfloor)

Moisture Content (Flooring)

Subfloor Condition

Notes on Subfloor Assessment

Subfloor Photos

Material Delivery & Acclimation

2 of 8

Ensure flooring materials are delivered, inspected, and properly acclimated to the environment.

Material Delivery Date

Delivery Confirmation Notes (Driver Signature, Condition upon arrival)

Quantity Delivered (Square Feet/Units)

Quantity Ordered (Square Feet/Units)

Material Condition Upon Arrival

Acclimation Start Date (Days)

Acclimation Start Date

Acclimation Environment Details (Temperature, Humidity)

Acclimation Complete?

Acclimation Notes (Observations, Adjustments)

Subfloor Preparation

3 of 8

Address and rectify any subfloor issues such as leveling, cleaning, patching, and applying appropriate underlayment or moisture barrier.

Subfloor Levelness (Deviation Limit)

Subfloor Type

Moisture Content (Subfloor)

Moisture Content (Air)

Moisture Barrier Required?

Subfloor Repair Notes

Subfloor Condition Photo(s)

Underlayment Type (if applicable)

Layout & Planning

4 of 8

Determine the optimal layout to minimize waste and ensure a visually appealing final product.

Room Dimensions (Length)

Room Dimensions (Width)

Total Square Footage

Waste Factor (%)

Direction of Flooring (with respect to longest wall)

Notes on Layout Considerations (e.g., furniture placement, door swing)

Pattern Type (if applicable)

Detailed Layout Sketch or Diagram (Optional)

Flooring Installation

5 of 8

The core process of installing the chosen flooring material according to manufacturer's instructions and best practices.

Manufacturer's Installation Instructions Followed?

Room Temperature (During Installation)

Adhesive Type (If Applicable)

Expansion Gap Considerations?

Flooring Pattern

Specific Installation Challenges Encountered (if any)?

Number of Flooring Boxes Installed

Seams, Transitions & Trim

6 of 8

Properly manage seams, transitions between flooring types, and installation of baseboards, quarter-round, and other trim.

Seam Adhesive Type

Seam Adhesive Notes (If 'Other' Selected)

Transition Strip Type

Transition Strip Fastener Count (per strip)

Trim Installation Notes

Caulk Used (Baseboards/Transitions)

Caulk Notes (If 'Other' Selected)

Installer Signature (Seam/Transition Approval)

Finishing & Clean-Up

7 of 8

Final steps including cleaning, sealing (if applicable), and ensuring a pristine finished surface.

Describe any final cleaning procedures performed (e.g., sweeping, vacuuming, mopping)

Was a floor sealant applied?

If sealant was applied, how many coats?

Note any specific instructions given to the client regarding post-installation care (e.g., avoiding heavy furniture, recommended cleaning products)

Were excess adhesive or grout remnants removed?

Describe any touch-up work performed (e.g., filling minor scratches, correcting imperfections)

Quality Control & Client Walkthrough

8 of 8

Conduct a thorough inspection to identify and correct any imperfections, and perform a walkthrough with the client for approval.

Overall Impression Notes

Are there any visible imperfections? (Select all that apply)

Subfloor Levelness (in inches)

Seam Visibility - Acceptable?

Client Concerns/Feedback

Client Satisfaction Level

Walkthrough Date

Walkthrough Time

Client Signature

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?