Plumbing Pipe Pressure Testing Checklist

Ensure plumbing integrity & avoid costly leaks! Download our free Plumbing Pipe Pressure Testing Checklist - a vital construction document for verifying pipework performance & meeting code compliance. Protect your project with this essential checklist.

This Template was installed 0 times.

Pre-Test Preparation

1 of 6

Tasks to be completed prior to commencing pressure testing. This ensures the system is ready and safe for testing.

Test Date

Test Start Time

Pipe Diameter (inches)

Pipe Material

Description of Plumbing System being Tested

Test Method

Test Pressure (PSI)

Isolation Details (Describe how the system is isolated)

Identify all fixtures isolated

Test Setup & Verification

2 of 6

Steps to establish the test setup correctly, including connections, pressure gauges, and isolation.

Test Section Length (ft/m)

Test Fluid Used

Specify 'Other' Test Fluid (if applicable)

Gauge Reading (Initial)

Test Pressure (psi/kPa)

Location of Pressure Gauge(s)

Connections Verified?

Isolation Valves Confirmed Closed?

Date of Setup Verification

Time of Setup Verification

Pressure Application & Hold

3 of 6

Procedures for gradually applying pressure, verifying stability, and maintaining the hold period.

Test Pressure (PSI/Bar)

Pressure Application Start Time

Pressure Increase Rate (PSI/Bar/Minute)

Time to Reach Test Pressure

Hold Pressure Duration (Minutes)

Pressure Reading After 5 Minutes of Hold (PSI/Bar)

Pressure Stability Observed?

Observations During Pressure Hold

Pressure Drop Monitoring & Evaluation

4 of 6

Monitoring for pressure drops and interpreting the results to determine system integrity.

Initial Test Pressure (PSI)

Hold Pressure (PSI)

Hold Duration (Minutes)

Maximum Allowable Pressure Drop (PSI)

Time Pressure Drop Observed (If Applicable)

Pressure Drop During Hold (PSI)

Pressure Drop Assessment

Detailed Observations & Notes (Leaks, Noise, etc.)

Photo/Video Documentation (if applicable)

Post-Test Procedures & Documentation

5 of 6

Actions to be taken after the test, including depressurization, inspection, and record keeping.

Post-Test Observations & Anomalies

Maximum Pressure Observed During Test (PSI/Bar)

Pressure Drop Result (Pass/Fail)

Description of any Failures (if applicable)

Date of Test

Time Test Completed

Attach Pressure Gauge Calibration Certificate

Technician Signature

Corrective Actions Taken (If Fail)

Safety & Permits

6 of 6

Ensuring proper safety protocols are followed and necessary permits are obtained.

Permit Required?

Permit Documentation (if required)

Permit Number (if applicable)

Brief Description of Safety Plan

PPE Required (Check all that apply)

Specify 'Other' PPE (if selected)

Date of Permit Application (if applicable)

Time of Start of Pressure Testing

Name of Safety Observer (if applicable)

Safety Observer Signature (if applicable)

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?