Post-Tensioning Checklist

Ensure structural integrity & compliance! Download our comprehensive Post-Tensioning Checklist for construction projects. Minimize risks, verify procedures, & guarantee quality with this essential guide. Perfect for engineers, contractors, & inspectors. Get your peace of mind today!

This Template was installed 4 times.

Pre-Tensioning Design & Planning

NaN of 8

Checks related to the design review, calculations, and planning phase before any on-site work begins.

Design Post-Tensioning Force (kips)

Design Post-Tensioning Stress (psi)

Summary of Design Assumptions

Design Calculations

Design Code Used

Date of Design Review Completion

Notes from Design Review (if any)

Design Approved?

Approver Name (if approved)

Material Inspection & Handling

NaN of 8

Verification of post-tensioning materials, including tendons, anchorages, and grout, upon delivery to the site.

Tendons Lot Number(s)

Manufacturer's Certificate Review - Summary of Findings

Number of Tendons Received

Number of Anchor Plates Received

Visual Inspection of Tendons (Select all that apply)

Grout Material Type Received

Upload Photos of Received Materials (if any issues found)

Notes/Comments regarding material condition.

Sheathing & Formwork

NaN of 8

Checks pertaining to the preparation and stability of the sheathing and formwork system that will hold the tendons.

Sheathing Thickness (inches)

Formwork Deflection Limit (inches)

Sheathing Material Type

Describe Formwork System & Support

Formwork Condition

Sheathing & Formwork Defects Observed?

If defects observed, describe in detail

Date of Formwork Inspection

Inspector Signature

Tendons Placement & Stressing

NaN of 8

Detailed inspection of tendon placement, alignment, and the stressing process itself.

Tendons Total Number Verified?

Tendons Orientation Correct?

Tendon Diameter Verified (inches)?

Tendons Placement Location Verified?

Stage 1 Stressed Force (kips)?

Stage 1 Measured Extension (inches)?

Stage 2 Stressed Force (kips)?

Stage 2 Measured Extension (inches)?

Stressing Completion Date

Stressing Notes and Observations

Anchor Plate & Anchorage Inspection

NaN of 8

Verification of anchor plate installation and anchorage conditions before and after stressing.

Anchor Plate Identification Number

Anchor Plate Condition (Visual)

Anchor Bolt Torque (kN·m)

Anchor Bolt Condition

Description of any Anchor Bolt Issues

Anchor Plate Alignment (mm)

Photograph of Anchor Plate & Anchorage

Corrosion on Anchor Plate

Details regarding any corrosion found.

Grouting

NaN of 8

Comprehensive checks related to the grouting process, including materials, mixing, placement, and monitoring.

Grout Mix Water/Cement Ratio

Grout Slump (if applicable)

Grout Type

Grout Batching Record Details (Batch Number, Date, Time, etc.)

Grout Air Voids Test Results (Select all that apply)

Grouting Start Date

Grouting Start Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Description of Grouting Procedure Followed

Grout Test Results (e.g., Compression Strength)

Grouting Completion Status

Post-Grouting Inspection & Testing

NaN of 8

Verification of post-grouting activities, including acceptance criteria and required testing.

Date of Post-Grouting Inspection

Start Time of Post-Grouting Inspection

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Ambient Temperature (°C)

Grout Temperature (°C) - Initial

Grout Temperature (°C) - Final

Grout Pressure during Placement (psi)

Visual Inspection Findings (Select all that apply)

Detailed Observations and Comments (Any anomalies, corrections, or concerns)

Photographs of Post-Grouting Activities

Overall Assessment

Documentation & Record Keeping

NaN of 8

Ensuring all necessary records, calculations, and certifications are properly documented and maintained.

Design Calculations & Drawings

Record of Design Review Comments & Resolutions

Date of Stressing Operation

Maximum Tendon Stress Reached (psi)

Description of Any Deviations from Approved Procedures

Quality Control Personnel Present During Stressing

Details of Any Re-stressing Operations

Grout Test Results (Slump, Air Content, etc.)

Post-Tensioning Supervisor Signature

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?