Renovation Project Checklist

Unlock your dream home! 🏡 Our free Renovation Project Checklist guides you through every step, from planning & permits to finishing touches. Avoid costly mistakes & stay on track - perfect for DIYers & homeowners alike. Download now! #renovation #realestate #checklist #homeimprovement #diy

This Template was installed 4 times.

Planning & Permits

1 of 9

Initial planning, design, budget creation, and securing necessary permits.

Project Description

Estimated Budget

Target Start Date

Estimated Completion Date

Property Zoning

Preliminary Site Plan

Scope of Work (brief)

Contractor Type

Design & Material Selection

2 of 9

Finalizing design choices, selecting materials, and obtaining quotes from suppliers.

Overall Design Concept Description

Initial Design Sketches/Mood Boards

Preferred Flooring Material

Preferred Kitchen Cabinet Styles

Estimated Budget for Materials (USD)

Countertop Material

Specific Paint Color Preferences (with Codes)

Demolition & Site Prep

3 of 9

Removing existing structures, clearing the work area, and preparing the site for renovation.

Detailed Scope of Demolition Work

Materials to be Recycled/Disposed of (Select all that apply)

Estimated Volume of Debris (Cubic Yards)

Scheduled Demolition Start Date

Location of Debris Staging Area

Photos of Pre-Demolition Condition

Hazardous Material Assessment Required?

Structural Work

4 of 9

Addressing any structural issues, including foundation, framing, and load-bearing walls.

Foundation Inspection Result (if applicable)

Description of any existing structural issues identified

Type of Framing System Used

Framing Inspection Date

Number of Load-Bearing Walls Modified

Details of any load-bearing wall modifications

Structural Engineer's Report (if applicable)

Rough-In Stage

5 of 9

Installation of plumbing, electrical, HVAC, and insulation.

Plumbing Rough-In Inspection Scheduled?

Number of New Electrical Outlets Installed

HVAC System Type

Electrical Rough-In Completion Date

Notes on Plumbing Rough-In (e.g., pipe size, material)

Insulation Type

Finishing Stage

6 of 9

Installation of drywall, flooring, cabinets, countertops, and fixtures.

Flooring Type Selected?

Number of Cabinet Doors Installed

Countertop Material Installed?

Notes on Tile/Flooring Installation

Faucet Brand Installed?

Photos of Completed Countertops

Number of Light Fixtures Installed

Painting & Trim

7 of 9

Painting walls, ceilings, and trim, and installing decorative elements.

Paint Type Selection

Rooms to be Painted

Number of Paint Coats (Per Room)

Trim Material

Trim Details/Style Notes

Trim Style Reference Image

Caulk Color (if applicable)

Final Inspection & Punch List

8 of 9

Addressing any remaining issues and obtaining final approvals.

Overall Project Assessment

Code Compliance Verification (Check all that apply)

Number of Open Punch List Items

Detailed Description of Remaining Issues

Date of Final Inspection

Inspector's Comments/Recommendations

Inspection Result

Inspector Signature

Closeout & Warranty

9 of 9

Finalizing paperwork, warranties, and project handover.

Project Completion Date

Total Project Cost (Actual)

Project Notes & Summary

Final Inspection Report

Contractor Satisfaction

Warranty Information Summary

Warranty Expiration Date (Overall)

Client Signature

Client Contact Information (For Warranty)

Construction Management Solution Screen Recording

See how ChecklistGuro can transform your construction management! This screen recording showcases our BPM solution in action, streamlining workflows, boosting efficiency, and keeping your projects on track. Discover how easy it is to manage tasks, approvals, and more. #constructionmanagement #bpm #checklistguro #screenrecording #projectmanagement #constructiontech #workflowautomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?