ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Structural Sheathing Fastening Checklist

Ensure strong, code-compliant structural sheathing installation! Download our free Structural Sheathing Fastening Checklist - your essential guide for builders & contractors. Avoid costly errors & guarantee a solid foundation. #construction #sheathing #fastening #checklist #buildingcode

This Template was installed 3 times.

Pre-Installation & Material Verification

NaN of 8

Checks performed before sheathing fastening begins to ensure correct materials and site conditions.

Sheathing Panel Width (ft)

Sheathing Panel Length (ft)

Sheathing Panel Type

Sheathing Grade (if applicable)

Sheathing Exposure (if applicable)

Project Specifications for Sheathing Installation (notes)

Weather Conditions (Affecting Installation)

Other Pre-Installation Observations

Fastener Selection & Inspection

NaN of 8

Verification of fastener type, size, and condition to meet project specifications.

Fastener Type Specified in Plans?

Fastener Material (e.g., galvanized, stainless steel)

Fastener Length (inches)

Fastener Diameter (inches)

Fastener Head Type

If 'Other' selected for Head Type, please specify:

Fasteners Corroded/Damaged?

If yes, describe damage:

Sheathing Layout & Support

NaN of 8

Ensuring proper sheathing placement and adequate framing support.

Panel Width Variation (Maximum)

Panel Length Variation (Maximum)

Sheathing Alignment with Framing

Panel Support Spacing Verified?

Maximum Distance Between Panel Supports

Blocking Installed Per Plan?

Notes on Panel Support/Layout Deviations

Fastening Pattern & Spacing

NaN of 8

Verification of fastener density and spacing according to code and design requirements.

Sheathing Edge Distance (inches)

Fasterner Spacing (inches) - Field

Fasterner Spacing (inches) - Perimeter

Fasterner Pattern (e.g., Staggered, Uniform)

Minimum End Nail/Screw Spacing (inches)

Sheathing Type (affects spacing)

Notes on Fastener Pattern Deviations (if any)

Fastener Installation Quality

NaN of 8

Inspection of fastener installation to ensure proper embedment and avoid issues like overdriving or stripping.

Fascener Penetration Depth (inches)

Number of Overdriven Fasteners Observed

Number of Stripped Fastener Holes Observed

Sheathing Compression Assessment

Detailed Observations of Fastener Installation Quality

Fastener Head Flatness

Number of Fasteners with Visible Head Damage

Edge Distance & Blockage

NaN of 8

Verification of edge distances and proper blocking requirements.

Minimum Edge Distance from Sheathing End (inches)

Minimum Edge Distance from Corner (inches)

Sheathing Edge Blocking Required?

Spacing of Blocking (inches, center-to-center)

Blocking Material Type (if required)

Details regarding blocking requirements (e.g., nailing schedule, span)

Edge Distance Verified Against Approved Plans?

Sheathing Edge Treatment

NaN of 8

Ensuring proper fastening and sealing of sheathing edges.

Edge Sealing Method?

If 'Other' edge sealing method specified, describe:

Edge Distance to Framing (inches)

Sheathing Edge Protection?

Description of Edge Protection (if applicable)

Photo Documentation of Edge Treatment

Documentation & Record Keeping

NaN of 8

Maintaining records of inspection results and corrective actions.

Inspection Date

Inspection Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Sheathing Panel Sequence Number

Observations & Comments

Compliance Status

Corrective Actions Required

Corrective Action Completion Date

Inspector Signature

Found this Checklist Template helpful?

Construction Management Solution

Keeping construction projects on time and on budget? ChecklistGuro's Work OS platform streamlines everything from planning and scheduling to resource management and progress tracking. Improve collaboration, minimize delays, and maximize efficiency. Discover how ChecklistGuro can transform your construction business!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?