ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

Fire Suppression System - Manufacturing Equipment Checklist

Ensure manufacturing equipment safety! Download our free Fire Suppression System Checklist for Facility Management. Protect your assets & comply with fire codes - a vital guide for plant managers & safety professionals.

This Template was installed 4 times.

System Overview & Identification

NaN of 8

Verify system details and identify equipment locations. Includes system type, location identifiers, and responsible personnel.

System Name/Identifier

Fire Suppression System Type

System Activation Pressure (PSI)

Primary System Location

Date of Last System Design Review

Brief Description of Protected Area/Equipment

Responsible Department/Contact Person

Contact Person's Name

Contact Phone Number

Visual Inspection

NaN of 8

General visual checks for any obvious signs of damage, tampering, or obstructions.

Equipment Location (Refer to System Layout)

System Type (e.g., Wet, Dry, Pre-action)

Visible Damage or Corrosion?

Ambient Temperature (°C)

Obstructions Around Equipment (e.g., stored materials)

Notes on Visual Condition

System Status (Based on Visual Inspection)

Nozzle and Piping Inspection

NaN of 8

Detailed inspection of sprinkler heads, piping, and related components for corrosion, leaks, and proper orientation.

Sprinkler Head Location 1 (Equipment Area)

Sprinkler Head Condition (Equipment Area)

Pipe Diameter (inches)

Pipe Condition

Number of Nozzles Inspected

Comments/Observations (Nozzle & Piping)

Sprinkler Head Orientation

Control Panel & Detection System

NaN of 8

Inspection of the fire alarm control panel, detectors (smoke, heat), and associated wiring.

Control Panel Battery Voltage

Panel Alarm Status

Panel Event Log Last Entry

Last Panel Inspection Date

Detector Types Present

Detector Sensitivity Setting

Notes/Observations

Pump & Water Supply

NaN of 8

Verification of pump functionality, water pressure, and water supply adequacy.

Static Water Pressure (PSI)

Residual Pressure (PSI)

Pump Discharge Pressure (PSI)

Pump Flow Rate (GPM)

Pump Operational Status

Notes on Pump Condition/Performance

Last Pump Tested Date

Water Supply Type

Manual Pull Stations & Auxiliary Devices

NaN of 8

Inspection of manual pull stations and any auxiliary devices like deluge triggers or remote monitors.

Pull Station 1 Location (Machine A)

Pull Station 2 Location (Assembly Line B)

Pull Station 1 - Condition

Pull Station 2 - Condition

Pull Station 1 - Activation Test Result (0=Fail, 1=Pass)

Pull Station 2 - Activation Test Result (0=Fail, 1=Pass)

Last Inspection Date (Auxiliary Device X)

Comments/Observations (Manual Pull Stations & Auxiliary Devices)

Testing & Maintenance Records Review

NaN of 8

Review of recent testing and maintenance records to ensure compliance with schedule.

Last Inspection Date

Pressure Test Results (PSI)

System Type Verified?

Summary of Maintenance Performed

Alarm Testing Completed?

Attach Inspection Report (PDF)

Next Scheduled Inspection Date

Documentation & Compliance

NaN of 8

Confirmation that all necessary documentation is present, up-to-date, and readily accessible.

Last System Inspection Date

Inspection Frequency (Months)

System Type

Summary of Findings/Comments

Upload Inspection Report

Compliance Status

Next Scheduled Inspection Date

Corrective Actions Required (if applicable)

Found this Checklist Template helpful?

Facility Management Solution

Managing facilities can be overwhelming. ChecklistGuro's Work OS platform offers a complete solution for streamlining maintenance, tracking assets, and improving efficiency. From preventative maintenance to work order management, we're here to simplify your facility operations. Learn how ChecklistGuro can transform your facility management!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?