Fire Suppression System - Manufacturing Equipment Checklist
Ensure manufacturing equipment safety! Download our free Fire Suppression System Checklist for Facility Management. Protect your assets & comply with fire codes - a vital guide for plant managers & safety professionals.
This Template was installed 2 times.
System Overview & Identification
Verify system details and identify equipment locations. Includes system type, location identifiers, and responsible personnel.
System Name/Identifier
Fire Suppression System Type
System Activation Pressure (PSI)
Primary System Location
Date of Last System Design Review
Brief Description of Protected Area/Equipment
Responsible Department/Contact Person
Contact Person's Name
Contact Phone Number
Visual Inspection
General visual checks for any obvious signs of damage, tampering, or obstructions.
Equipment Location (Refer to System Layout)
System Type (e.g., Wet, Dry, Pre-action)
Visible Damage or Corrosion?
Ambient Temperature (°C)
Obstructions Around Equipment (e.g., stored materials)
Notes on Visual Condition
System Status (Based on Visual Inspection)
Nozzle and Piping Inspection
Detailed inspection of sprinkler heads, piping, and related components for corrosion, leaks, and proper orientation.
Sprinkler Head Location 1 (Equipment Area)
Sprinkler Head Condition (Equipment Area)
Pipe Diameter (inches)
Pipe Condition
Number of Nozzles Inspected
Comments/Observations (Nozzle & Piping)
Sprinkler Head Orientation
Control Panel & Detection System
Inspection of the fire alarm control panel, detectors (smoke, heat), and associated wiring.
Control Panel Battery Voltage
Panel Alarm Status
Panel Event Log Last Entry
Last Panel Inspection Date
Detector Types Present
Detector Sensitivity Setting
Notes/Observations
Pump & Water Supply
Verification of pump functionality, water pressure, and water supply adequacy.
Static Water Pressure (PSI)
Residual Pressure (PSI)
Pump Discharge Pressure (PSI)
Pump Flow Rate (GPM)
Pump Operational Status
Notes on Pump Condition/Performance
Last Pump Tested Date
Water Supply Type
Manual Pull Stations & Auxiliary Devices
Inspection of manual pull stations and any auxiliary devices like deluge triggers or remote monitors.
Pull Station 1 Location (Machine A)
Pull Station 2 Location (Assembly Line B)
Pull Station 1 - Condition
Pull Station 2 - Condition
Pull Station 1 - Activation Test Result (0=Fail, 1=Pass)
Pull Station 2 - Activation Test Result (0=Fail, 1=Pass)
Last Inspection Date (Auxiliary Device X)
Comments/Observations (Manual Pull Stations & Auxiliary Devices)
Testing & Maintenance Records Review
Review of recent testing and maintenance records to ensure compliance with schedule.
Last Inspection Date
Pressure Test Results (PSI)
System Type Verified?
Summary of Maintenance Performed
Alarm Testing Completed?
Attach Inspection Report (PDF)
Next Scheduled Inspection Date
Documentation & Compliance
Confirmation that all necessary documentation is present, up-to-date, and readily accessible.
Last System Inspection Date
Inspection Frequency (Months)
System Type
Summary of Findings/Comments
Upload Inspection Report
Compliance Status
Next Scheduled Inspection Date
Corrective Actions Required (if applicable)
Facility Management Solution Screen Recording
Simplify facility management with ChecklistGuro! This screen recording shows how to manage work orders, track assets, and streamline maintenance. See the power of automation! #facilitymanagement #checklistguro #bpm #businessprocessmanagement #maintenance #assetmanagement
Related Checklist Templates
Lease Renewal Checklist
Maintenance Request Checklist
Resident Communication Checklist
Capital Improvement Planning Checklist
Office Opening/Closing Checklist
Operating Room Readiness Checklist
Elevator Maintenance & Safety Checklist
Compressed Air System Inspection Checklist
Swimming Pool & Spa Maintenance Checklist
Dialysis Unit Maintenance Checklist
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.