Lockout/Tagout (LOTO) Checklist

Ensure worker safety & regulatory compliance with our comprehensive Lockout/Tagout (LOTO) Checklist for Manufacturing! Download our free, printable checklist to prevent accidents, streamline procedures, and protect your team. Stay OSHA compliant - get your LOTO checklist today!

This Template was installed 5 times.

Display Style

Pre-Shift Planning & Hazard Assessment

1 of 8

Initial steps to identify hazards and plan the LOTO procedure.

Date of Assessment

Time of Assessment Start

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Brief Description of Task/Job to be Performed

Potential Hazards Identified (Initial Assessment)

Hazards Related to Previous Incidents/Near Misses?

Previous Control Measures (if any) & Their Effectiveness

Risk Level (Based on Initial Assessment)

Name of Person Performing Hazard Assessment

Signature of Person Performing Hazard Assessment

Identify Energy Sources

2 of 8

Listing all potential energy sources that need to be controlled.

What types of energy are present?

Describe any unusual or non-standard energy sources.

Voltage of electrical supply (if applicable)

Pressure of pneumatic/hydraulic systems (if applicable)

Identify the primary energy source requiring isolation.

Additional Notes about Energy Sources (e.g., secondary hazards)

Isolation & Shutdown Procedures

3 of 8

Steps for isolating and shutting down equipment.

Detailed Step-by-Step Shutdown Procedure

Equipment ID Number

Shutdown Sequence (e.g., Normal Stop, Emergency Stop)

Location of Primary Isolation Point

Date of Procedure Review/Update (Last Reviewed)

Time of Shutdown Initiation

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Any Unusual Considerations for Shutdown?

Lockout/Tagout Application

4 of 8

Applying locks and tags to energy isolation points.

Lock Type Used (e.g., Keyed, Combination)

Lock ID Number

Tag Type Used

Tag ID Number

Tag Information

Lock/Tag Location (Specific Point of Isolation)

Authorized Personnel Applying LOTO

Authorized Personnel Signature (Lock Application)

Verification of Isolation

5 of 8

Confirming that equipment is completely de-energized and safe to work on.

Voltage Reading (Phase-to-Phase)

Voltage Reading (Phase-to-Neutral)

Current Reading (Amps)

Confirm Zero Energy State?

Describe Verification Steps Taken

Sound Check (Confirm no equipment noise)

Movement Check (Confirm no unintended movement)

Verification Date

Verification Time

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Work Performance & Observation

6 of 8

Ensuring work is performed safely and observing for any potential issues.

Describe the work being performed on the equipment.

Number of personnel working on the equipment.

Are there any unusual noises or movements observed?

If yes, describe the unusual noises or movements.

Were any tools or equipment accidentally moved or dropped during the work?

If yes, describe the incident and corrective actions taken.

Is anyone experiencing discomfort or noticing anything concerning?

If yes, describe the discomfort or concern.

Removal of LOTO & Equipment Restart

7 of 8

Process for removing locks and tags and safely restarting equipment.

Date of LOTO Removal

Time of LOTO Removal

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Reason for LOTO Removal

If 'Other' selected, please explain reason for removal

Was a visual inspection performed?

Equipment Voltage/Pressure after Verification

Confirmation of Clear Communication with Affected Personnel

Authorized Personnel Signature (Removal)

Name (Printed) of Authorized Personnel

Documentation & Sign-off

8 of 8

Recording the LOTO procedure and confirming completion.

Date of LOTO Procedure

Time of LOTO Implementation

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Equipment/Machine ID

Brief Description of Work Performed

LOTO Procedure Followed (Reference)

Additional Notes/Observations

Authorized Lockout Person Signature

Affected Employee Acknowledgement

More about this Template Manufacturing Management

Frequently Asked Questions

Can I customize this template after installing it?

Absolutely. Once installed, you can add, remove, or reorder tasks, add custom fields, and adjust deadlines to fit your specific workflow.


Can I add images or photos to these checklist items?

Yes. Our platform allows you to attach photos, signatures, and notes to any checklist item for better verification and proof of completion.


Can I create a custom checklist from scratch instead of using a template?

Yes. You can use our "Create your own checklist" feature to build a unique workflow tailored exactly to your operational requirements.


Can I add dependencies between tasks?

Yes, you can set up conditional logic and dependencies to ensure your team follows the correct sequence of operations.


Can I assign specific checklist items to different team members?

Yes. You can assign individual tasks to specific employees, ensuring clear accountability across your entire team.


Can I use these checklists on mobile devices in the field?

Yes. Our platform is fully responsive, allowing your team to complete, update, and upload photos to checklists directly from any smartphone or tablet.


How do I notify my manager when a checklist is completed?

You can set up automated notifications (via email, push notification, or in-app alerts) to trigger whenever a checklist is finished or if an item fails inspection.


Can multiple people work on the same checklist simultaneously?

Yes, the platform supports real-time updates, allowing multiple users to contribute to a single live checklist.


Where is the data from completed checklists stored?

All completed checklists are stored securely in your Work OS dashboard, creating a permanent, searchable audit trail of your operations.


Can I generate reports based on my checklist results?

Yes. You can track completion rates, identify recurring issues, and monitor team performance through our integrated reporting and analytics tools.


How can I use these checklists for compliance or auditing purposes?

Because our checklists capture timestamps, photos, and digital signatures, they serve as a robust digital paper trail for regulatory compliance and internal audits.


Can I export my completed checklist data for use in other tools?

Yes. You can export your data in various formats (CSV, Excel, etc.) to integrate your operational insights with your other business software.


Summarize and Analyze this checklist template with

Comments

There are no comments yet. Be the first to add one!


Manufacturing Management Solution Demo

Stop chasing paperwork and wrestling with disconnected systems! Our solution brings clarity and control to your production process. From standard operating procedures (SOPs) and equipment maintenance to quality control and inventory tracking, we simplify every step.

Related Checklist Templates

Need help with
Manufacturing?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email
How can we help?