ChecklistGuro logo ChecklistGuro Solutions Industries Company Pricing

Shutdown/Turnaround Checklist

Maximize uptime & minimize risk with our comprehensive Manufacturing Shutdown/Turnaround Checklist! Ensure safety, efficiency, and compliance during plant shutdowns. Downloadable & customizable for optimal results.

This Template was installed 2 times.

Planning & Preparation

1 of 10

Activities related to planning, risk assessment, permit acquisition, and communication prior to the shutdown.

Planned Shutdown Start Date

Planned Shutdown End Date

Estimated Shutdown Duration (Days)

Shutdown Scope Description

Affected Areas/Units

Shutdown Type

Risk Assessment Document

Permit Required (Yes/No)

Personnel & Safety

2 of 10

Ensuring adequate staffing, safety protocols, and emergency preparedness for the shutdown.

Number of Personnel Involved

PPE Requirements (Select all that apply)

Briefing/Toolbox Talk Topics Covered

Date of Safety Briefing

Time of Safety Briefing

Emergency Contact Person(s)

Emergency Procedures Reviewed (Fire, Medical, Spill)

Attach Relevant Safety Documentation (SDS, Permit to Work)

Safety Supervisor Sign-off

Utilities & Services

3 of 10

Steps required to isolate, depressurize, and secure utilities like electricity, water, steam, and compressed air.

Main Power Supply Voltage (V)

Steam Supply Isolation Method

Detailed Notes on Steam Isolation Procedure

Scheduled Time for Water Supply Isolation

Compressed Air Line Isolation

Description of Partial Compressed Air Isolation

Date of Last Utility System Inspection

Water Tank Level (%), prior to shutdown

Nitrogen Purge Required?

Equipment Isolation & Lockout/Tagout (LOTO)

4 of 10

Procedures for isolating and securing equipment to prevent accidental startup.

Select Isolation Method

Describe Isolation Procedures

Lock Number (if applicable)

Energy Source

Affected Equipment (Check all that apply)

Isolation Verification Signature

Isolation Verification Date

Isolation Verification Time

Mechanical Work

5 of 10

Tasks related to mechanical repairs, replacements, and inspections.

Describe the specific mechanical work to be performed.

Estimated labor hours required for mechanical work.

Upload detailed mechanical work scope documents/drawings.

Type of Mechanical Repair (e.g., replacement, overhaul, inspection).

Estimated Start Date for Mechanical Work.

Estimated Start Time for Mechanical Work.

Specialized tools or equipment required.

Part Number(s) of replaced components.

Mechanical Work Completion Signature

Electrical Work

6 of 10

Activities involving electrical equipment, including testing, repairs, and upgrades.

Voltage Readings - Phase A

Voltage Readings - Phase B

Voltage Readings - Phase C

Insulation Resistance Test Result (Megger)

Detailed Observations During Insulation Resistance Testing

Electrical Safety Checks Performed

Date of Next Electrical Inspection

Upload Infrared Thermography Report (if applicable)

Equipment Tag Number for Disconnect Switches

Electrician Sign-off

Instrumentation & Control Systems

7 of 10

Tasks related to calibration, testing, and maintenance of instrumentation and control systems.

Calibrate Flow Meter - Loop X

PLC Program Backup Status

Record any observed deviations during calibration

Last Calibration Date - Controller Y

Time of Calibration - Controller Y

Upload Calibration Certificates

HMI Screen Functionality Test Result

Loop Checks Performed

Process & Cleaning

8 of 10

Steps for cleaning, flushing, and preparing process equipment for maintenance or inspection.

Describe the cleaning procedure to be followed. Include any specific chemicals or techniques.

Target cleanliness level (e.g., % reduction in contaminants)

Cleaning Method Selected

Upload SDS (Safety Data Sheets) for cleaning chemicals.

Date of Last Cleaning

Record any unusual observations or issues encountered during cleaning.

Waste Disposal Method

Estimated Cleaning Duration

Post-Shutdown Activities & Restart

9 of 10

Procedures for post-maintenance checks, system re-integration, and controlled equipment restart.

Planned Restart Date/Time

Actual Restart Time

Pressure Readings (Confirm within spec)

Temperature Readings (Confirm within spec)

Checklist Verification - Restart Sequence Complete?

Confirm Safety Interlocks Functioning Correctly

Any Issues Encountered During Restart?

Restart Verification Signature

Production Levels Restored?

Notes on initial production run

Documentation & Sign-off

10 of 10

Ensuring all work is properly documented, signed off, and lessons learned are captured.

Shutdown Start Date

Shutdown End Date (Planned)

Planned Restart Time

Summary of Work Performed

Total Shutdown Duration (Hours)

Deviations from Planned Shutdown (Check all that apply)

Details of Deviations (if any)

Supporting Documentation (e.g., Inspection Reports, Photos)

Shutdown Supervisor Sign-off

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?