Mining Blast Plan Review Checklist
Ensure safe and compliant blasting operations. This Mining Blast Plan Review Checklist guides you through critical checks, minimizing risk and maximizing efficiency. Download now and streamline your mining workflow.
This Template was installed 0 times.
Blast Plan Overview & Objectives
Review the overall blast plan goals, objectives, and scope of work.
Project Name
Blast Plan Purpose & Scope
Block Number/Sequence
Date of Plan Creation
Plan Type (Production/Development/Rescue)
Brief Summary of Blast Objectives
Geotechnical Data & Site Conditions
Verify accuracy and completeness of geotechnical data, including rock type, fault locations, and groundwater conditions.
Summary of Geological Report
Rock Unit Dip Angle (degrees)
Joint Spacing (meters)
Dominant Rock Type
Geotechnical Survey Maps
Date of Last Geotechnical Survey
Description of Observed Faults/Fractures
Blast Design Parameters
Assess the appropriateness of burden, spacing, and delay sequences based on site conditions and rock mechanics.
Burden (meters)
Spacing (meters)
Maximum Hole Depth (meters)
Hole Angle (degrees)
Delay Sequence (milliseconds)
Firing Pattern
Stemming Thickness (meters)
Drilling & Fragmentation
Evaluate the drilling plan, hole depth, angle, and diameter, ensuring adequate fragmentation is achievable.
Hole Depth (meters)
Hole Diameter (mm)
Hole Angle (degrees)
Drilling Pattern Type
Drilling Method Description
Drill Pattern Diagram
Expected Fragmentation Size (mm)
Fragmentation Control Measures
Explosives Selection & Calculation
Confirm appropriate explosive type, density, and total explosive charge calculations.
Total Explosive Mass (kg)
Explosive Density (kg/m³)
Type of Explosive Used
Justification for Explosive Selection
Average Hole Diameter (mm)
Average Burden (m)
Explosives Cost per kg (AUD)
Sequence and Timing
Review the blasting sequence and timing for minimizing vibration and backbreak.
Delay Time (Seconds) - First Hole
Delay Time (Seconds) - Subsequent Holes
Total Delay Sequence Length (Seconds)
Delay Type
Justification for Delay Sequence
Burden and Spacing Methodology
Date of Sequence Calculation Review
Ground Control and Stability
Assess potential impacts on ground stability and control measures required.
Rock Mass Rating (RMR) Value
Geological Strength Index (GSI) Value
Existing Ground Support System
Description of Existing Ground Conditions
Potential Instability Features Observed
Proposed Ground Support Modifications (if any)
Ground Stability Risk Level
Vibration & Airblast Mitigation
Evaluate strategies to minimize vibration and airblast impacts on surrounding areas.
Peak Particle Velocity (PPV) Limit (m/s)
Airblast Overpressure Limit (dB)
Blast Pattern Design to Minimize Vibration?
Mitigation Techniques Implemented (select all that apply)
Description of 'Other' Mitigation Techniques (if selected)
Date of Vibration/Airblast Monitoring Plan Review
Upload Vibration Monitoring Plan
Environmental Considerations
Verify adherence to environmental regulations and mitigation plans regarding dust, noise, and water quality.
Predicted Dust Emission (mg/m³)
Predicted Noise Level (dB)
Proximity to Water Sources?
Description of Water Management Plan
Applicable Environmental Regulations
Date of Last Environmental Impact Assessment
Environmental Monitoring Plan Document
Regulatory Compliance & Approvals
Confirm all necessary permits, licenses, and regulatory approvals are secured.
Permit Number
Permit Description
Permit Issue Date
Permit Expiration Date
Regulatory Body
Copy of Permit Document
Permit Status
Risk Assessment & Mitigation
Identify potential hazards and review mitigation measures outlined in the plan.
Describe potential blast-related hazards identified.
Detail existing mitigation measures for each hazard.
Estimated Vibration Intensity (Peak Particle Velocity)
Estimated Airblast Overpressure
Severity of Potential Impact (if Hazard Occurs)
Likelihood of Occurrence
Supporting Documentation (e.g., Vibration Monitoring Plan)
Competency & Training
Verify the competency and training of personnel involved in the blasting operation.
Blaster Certification Status
Blaster Certification Expiration Date
Years of Blasting Experience
Completion of Blast Plan Review Training?
Date of Last Refresher Training
Details of any relevant experience or specialized training
Mining Management Screen Recording
Get a hands-on look at ChecklistGuro's mining management solution! This screen recording shows you how our app works in a real-world mining environment, featuring visuals of mining machines, operational workflows, and issue resolution. Learn how our BPM platform empowers teams to streamline processes, track progress, and ensure safety on the job. #MiningManagement #BPM #ChecklistGuro #MiningSoftware #AppDemo #MiningTechnology #WorkflowAutomation
Related Checklist Templates
Mining Noise Monitoring Checklist
Mining Explosives Handling Checklist
Mining Waste Rock Management Checklist
Mine Dewatering Plan Checklist
Mining Incident Reporting Checklist
Mine Ventilation Dilution Checklist
Mining Fire Prevention Checklist
Mining First Aid & Medical Response Checklist
Mining PPE Compliance Checklist
Mining Lockout Tagout (LOTO) Checklist
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.