Pre-LOTO Planning & Preparation

1 of 8

Ensuring thorough planning and necessary preparations are completed before initiating lockout/tagout procedures.

Scheduled LOTO Date

Reason for LOTO

Affected Area/Zone

Equipment ID

Potential Hazards Identified

LOTO Supervisor

LOTO Supervisor Signature

Equipment Identification & Isolation

2 of 8

Accurate identification of equipment to be locked out and verification of isolation points.

Equipment Name/Description

Equipment ID/Asset Tag

Serial Number (if applicable)

Energy Source Type(s)

Specific Isolation Points (e.g., valve numbers, breaker IDs)

Isolation Point Location (GPS Coordinates or description)

Equipment Diagram/Drawing (if available)

Energy Source Isolation

3 of 8

Detailed steps for isolating all relevant energy sources (electrical, mechanical, hydraulic, pneumatic, chemical, thermal).

Energy Source Type

Detailed Isolation Procedure Description

Circuit Breaker Number (if applicable)

Date of Last Isolation Check

Time of Isolation

Isolation Point Verified?

Photo of Isolation Point (optional)

Lock and Tag Application

4 of 8

Proper application of locks and tags with unique identifiers for each authorized employee.

Lock Type Used

Tag Type Used

Lock Identifier (Unique Code)

Tag Identifier (Unique Code)

Locking Employee Signature

Tag Number (If Applicable)

Lock Placement Verified?

Notes/Comments (if applicable)

Verification of Isolation

5 of 8

Testing and verifying that equipment is completely de-energized and cannot be inadvertently started.

Voltage Reading (Volts)

Pressure Reading (PSI)

Mechanical Brake Status

Hydraulic Cylinder Status

Additional Verification Notes

Verifier Signature

Communication & Authorization

6 of 8

Confirming communication and authorization among personnel involved in the LOTO process.

Authorized Personnel Communication Method

Communication Log - Brief Summary

Employee ID of Authorizing Personnel

Date of Authorization

Time of Authorization

Signature of Authorizing Personnel

LOTO Removal & Re-Energization

7 of 8

Controlled and authorized removal of locks and tags, followed by equipment re-energization and testing.

Re-Energization Date

Re-Energization Time

Re-Energization Authorized By (Role)

Re-Energization Authorization Signature

Voltage/Pressure Test Result (Post Re-Energization)

Test Result Pass/Fail

If Fail, describe issue

Documentation & Record Keeping

8 of 8

Maintaining accurate records of LOTO procedures, personnel involved, and equipment serviced.

LOTO Procedure Date

Equipment Identifier

Authorized Personnel Initials

Lock/Tag Number

Notes/Observations

Lockout Personnel Signature

LOTO Status

Mining Management Screen Recording

Get a hands-on look at ChecklistGuro's mining management solution! This screen recording shows you how our app works in a real-world mining environment, featuring visuals of mining machines, operational workflows, and issue resolution. Learn how our BPM platform empowers teams to streamline processes, track progress, and ensure safety on the job. #MiningManagement #BPM #ChecklistGuro #MiningSoftware #AppDemo #MiningTechnology #WorkflowAutomation

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?