Healthcare Facility Construction Project Checklist Template
Ensure a smooth, compliant, and on-time healthcare facility build with our comprehensive checklist. Covering everything from initial planning to final inspection, this template minimizes risk, streamlines communication, and helps you deliver exceptional healthcare spaces.
This Template was installed 3 times.
Planning & Design
Initial assessments, site surveys, architectural designs, and regulatory approvals.
Project Goals & Objectives
Target Project Completion Date
Estimated Project Budget
Building Type (e.g., Hospital, Clinic, Surgical Center)
Preliminary Site Survey Report
Description of Required Medical Services & Patient Flow
Architectural Design Style
Permitting & Regulatory Compliance
Securing necessary permits, environmental impact studies, and adhering to healthcare-specific regulations.
Zoning Permit Status
Permit Application Submission Date
Permit Application Fee Paid (USD)
Fire Safety Permit Status
Copy of Environmental Impact Assessment Report
Notes on Regulatory Communication
Site Preparation & Demolition
Site clearing, demolition of existing structures, and soil testing.
Lot Size (Acres)
Description of Existing Site Conditions
Demolition Permit Application Date
Pre-Demolition Site Photos
Demolition Method
Estimated Demolition Waste Volume (Cubic Yards)
Hazardous Materials Identified (e.g., Asbestos, Lead)
Foundation & Structure
Foundation pouring, structural steel erection, and building frame construction.
Foundation Depth (feet)
Concrete Strength (PSI)
Concrete Pour Date
Concrete Inspection Signature
Steel Grade Specification
Foundation Type
Notes on Structural Integrity Concerns
Exterior Works
Roofing, siding, windows, doors, landscaping, and exterior signage.
Scheduled Start Date for Exterior Work
Roofing Material Quantity (sq ft)
Siding Material Samples
Window Quantity
Exterior Lighting Type
Landscaping Contractor Site Visit Coordinates
Scheduled Completion Date for Exterior Painting
MEP (Mechanical, Electrical, Plumbing)
HVAC installation, electrical wiring, plumbing fixtures, and fire suppression systems.
HVAC Unit Capacity (BTU)
Electrical Panel Amperage (Amps)
Plumbing Pipe Diameter (inches)
Electrical Wiring Type
Plumbing Fixture Types Installed
HVAC System Commissioning Date
Electrical System Testing Start Time
Notes on Plumbing Backflow Prevention
Interior Build-Out
Wall construction, flooring, ceiling, and interior finishes.
Wall Thickness (inches)
Wall Finish Type
Detailed Notes on Wall Finishes (e.g., specific paint codes, texture details)
Flooring Material
Flooring Installation Completion Date
Ceiling Type and Details (e.g., suspended, drywall, acoustic panels)
Ceiling Finish Samples (if applicable)
Number of Interior Doors
Medical Equipment Installation
Procurement, delivery, and installation of specialized medical equipment.
Equipment Vendor
Equipment Model Number
Quantity
Scheduled Delivery Date
Estimated Installation Start Time
Installation Notes/Specific Requirements
Equipment Manual/Datasheet
Installation Status
IT & Communication Infrastructure
Network cabling, server room setup, and telecommunications systems.
Network Bandwidth (Mbps)
Wireless Network Standard (Wi-Fi)
Security Protocols
Network Activation Date
Network Documentation (Diagrams, Configurations)
Network Security Audit Report
Infection Control & Safety
Implementation of infection control measures and ensuring workplace safety.
COVID-19 Safety Plan in Place?
Number of Hand Sanitizer Stations
PPE Requirements
Last Safety Training Date
Description of Ventilation System Enhancements (if any)
Safety Plan Document
Air Filtration System Type
Commissioning & Testing
Testing and verifying all systems are functioning correctly (electrical, plumbing, HVAC, medical gas, etc.).
Commissioning Start Date
Commissioning Start Time
System Commissioned (Select All That Apply)
Temperature Verification (HVAC)
Pressure Verification (Medical Gas)
Test Results & Observations
Commissioning Engineer Signature
Final Inspections & Approvals
Local authority inspections and obtaining Certificate of Occupancy.
Scheduled Inspection Date
Inspection Type
Inspector Name
Inspector Company
Inspection Findings (Number of Deficiencies)
Detailed Inspection Notes
Inspector Signature
Resolution Completion Date (if applicable)
Handover & Training
Facility handover to client and staff training on new systems and equipment.
Official Handover Date
Summary of Outstanding Issues/Snag List
Systems Handover Checklist Completed?
Contractor Representative Signature
Client Representative Signature
Training Summary (Topics Covered, Attendees)
Number of Staff Trained
Project Management Solution Screen Recording
Get projects done right with ChecklistGuro's project management solution! This screen recording shows you how to organize tasks, collaborate with your team, and stay on schedule. See it in action! #projectmanagement #checklistguro #bpm #businessprocessmanagement #taskmanagement #teamcollaboration
Related Checklist Templates
Aquaculture Farm Project Checklist Template
Ranch Operation Project Checklist Template
Forestry Management Project Checklist Template
Dairy Farm Startup Project Checklist Template
Winery Production Project Checklist Template
Cannabis Cultivation Facility Project Checklist Template
Brewery Startup Project Checklist Template
Orchard Planting and Development Project Checklist Template
Casino Resort Development Project Checklist Template
Cruise Ship Construction Project Checklist Template
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.