Theme Park Construction Project Checklist Template

Ensure a thrilling launch! Our Theme Park Construction Project Checklist Template guides you through every step - from initial design to final inspection - minimizing delays and maximizing excitement. Build your dream park with confidence.

This Template was installed 4 times.

Planning & Permitting

1 of 10

Initial project planning, feasibility studies, securing permits and approvals.

Project Name

Project Start Date (Planned)

Estimated Project Budget

Zoning Compliance

Environmental Impact Assessment Report

Required Permits

Permit Application Submission Date

Site Preparation & Demolition

2 of 10

Clearing land, demolition of existing structures, and initial grading.

Detailed Site Assessment Report

Estimated Demolition Volume (Cubic Yards)

Existing Structures to be Demolished

Scheduled Demolition Start Date

Environmental Impact Mitigation Plan

Demolition Method Selected

Site Survey Map

Foundation & Infrastructure

3 of 10

Foundation work, underground utilities (water, sewer, electricity), and road construction.

Foundation Depth (meters)

Soil Bearing Capacity (kPa)

Foundation Type

Soil Testing Completion Date

Soil Testing Report Summary

Water Table Depth (meters)

Utility Main Connection Type

Ride & Attraction Construction

4 of 10

Construction and installation of major rides, shows, and attractions.

Ride Height (meters)

Maximum Ride Capacity (Guests)

Scheduled Delivery Date of Primary Ride Components

Ride Foundation Location Coordinates

Ride Safety System Features (Select All)

Detailed Ride Construction Notes

Ride Design Blueprints

Building & Theming

5 of 10

Construction of buildings, restaurants, shops, and application of theming elements.

Facade Material Quantity (sq ft)

Facade Design Render

Theming Style Consistency Check

Detailed Description of Interior Theming

Scheduled Mural Painting Completion Date

Number of Themed Lighting Fixtures Installed

Theming Elements Confirmed (check all that apply)

Landscaping & Grounds

6 of 10

Installation of landscaping, pathways, and other outdoor features.

Total Area for Landscaping (sq ft)

Plant Selection Categories

Landscape Design Plan

Irrigation System Installation Date

Notes on Soil Composition & Amendments

Mulch Type

Location of Main Entrance Landscaping

Utilities & Systems

7 of 10

Installation and testing of electrical, plumbing, HVAC, and security systems.

Main Power Supply Voltage (kV)

Emergency Generator Capacity (kW)

HVAC System Type

Initial Plumbing System Pressure Test Date

Scheduled System Calibration Time

Detailed Description of Security System Components

Electrical System Schematic

Safety & Inspections

8 of 10

Ongoing safety checks, inspections, and compliance with regulations.

Inspection Date

Inspection Time

Inspection Type

Temperature (Fahrenheit)

Wind Speed (MPH)

Observations/Comments

Hazards Identified

Inspector Signature

Ride Testing & Commissioning

9 of 10

Rigorous testing and commissioning of all rides and attractions.

Ride Cycle Test Count

Maximum Load Test Count

First Operational Test Date

First Operational Test Time

Ride Operational Status

Ride Test Observations

Ride Test Video Evidence

Ride Test Engineer Signature

Final Walkthrough & Handover

10 of 10

Final inspections, documentation, and handover to operations team.

Walkthrough Date

Walkthrough Start Time

Overall Project Summary & Key Achievements

Outstanding Issues Requiring Attention

Number of Open Safety Items

Areas Inspected & Verified (Select all that apply)

Construction Manager Signature

Client Representative Signature

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?