ChecklistGuro logo ChecklistGuro Solutions Industries Company Pricing

Renewable Energy Project Risk Assessment Checklist

Ensure your renewable energy projects stay on track and minimize costly setbacks. Our Risk Assessment Checklist provides a comprehensive framework for identifying, evaluating, and mitigating potential risks in solar, wind, hydro, and other clean energy initiatives. Stay compliant, optimize performance, and protect your investment with this essential tool for energy professionals.

This Template was installed 0 times.

Project Overview & Scope

1 of 12

Details about the project, its goals, and the areas covered by this risk assessment.

Project Name

Project Description

Project Budget (USD)

Project Start Date

Projected Completion Date

Project Phase

Scope of Assessment (briefly describe areas covered)

Environmental Risks & Permits

2 of 12

Assessment of potential environmental impacts and permit compliance.

Preliminary Environmental Impact Assessment (EIA) Status

EIA Submission Date

Permit Type Required (e.g., Air, Water, Waste)

Summary of Potential Environmental Impacts Identified

Copies of Environmental Permits (Upload all relevant documents)

Protected Species Identified in Project Area?

Description of Mitigation Measures for Identified Environmental Impacts

Site Conditions & Geotechnical Risks

3 of 12

Evaluation of site-specific challenges like soil stability, geology, and potential hazards.

Identify areas of potential landslide risk

Soil Bearing Capacity (kPa)

Groundwater Level (meters)

Soil Type

Describe any observed signs of instability (cracks, settlement)

Attach Geotechnical Report (if available)

Seismic Zone

Date of Last Geotechnical Survey

Technology & Equipment Risks

4 of 12

Assessment of risks associated with the selected renewable energy technology and its components.

Turbine/Panel Model

Equipment Age (Years)

Detailed Description of Equipment Condition

Supplier Reputation

Potential Failure Modes

Estimated Remaining Life (Years)

Equipment Documentation (Manuals, Schematics)

Construction & Installation Risks

5 of 12

Identification of potential risks during the construction and installation phase.

Crane Lifting Capacity (tons)

Soil Stability Assessment Status

Description of Potential Ground Contamination Issues

Scheduled Concrete Pour Date

Potential Hazards Identified (Select all that apply)

Photographic Evidence of Site Conditions

Equipment Inspection Status (Wind Turbine Foundations)

Scheduled Blast Time (if applicable)

Operational Risks & Maintenance

6 of 12

Evaluation of risks related to ongoing operations, maintenance, and performance.

Turbine/Panel Output Deviation (%)

Description of Performance Anomalies

Last Preventative Maintenance Date

Time of Inspection

Equipment Temperature (°C)

Equipment Issues Observed

Maintenance Required?

Details of Corrective Actions Taken

Financial & Contractual Risks

7 of 12

Assessment of potential financial losses, contractual disputes, and regulatory changes.

Project Budget Variance (Percentage)

Contract Type

Contract Expiration Date

Potential Contractual Disputes Summary

Contingency Fund Allocation (USD)

Currency Risk Mitigation Strategy

Description of any financing constraints

Health & Safety Risks

8 of 12

Identification of potential hazards to worker safety and public health.

Description of potential slip, trip, and fall hazards observed.

Estimated worker exposure duration (hours/day) for high-risk tasks.

Personal Protective Equipment (PPE) Requirements Met?

Confined Space Entry Procedures Followed?

Last Safety Training Date

Safety Officer Signature

Details of any near misses or incidents observed.

Security Risks

9 of 12

Assessment of potential threats to project security, including physical security and cybersecurity.

Perimeter Security Assessment

Number of Security Cameras

Location of Server Room

Cybersecurity Measures in Place (Select all that apply)

Last Security System Update

Description of any recent security incidents

Security System Design Documents

Stakeholder & Community Risks

10 of 12

Evaluation of potential conflicts with stakeholders and community concerns.

Summary of Community Concerns Identified

Level of Community Support

Potential Stakeholder Groups Impacted

Details of any Communication Protocols Established

Date of Last Community Consultation

Estimated Number of People Affected

Regulatory & Compliance Risks

11 of 12

Assessment of adherence to all relevant local, state, and federal regulations.

Applicable Environmental Permits Required?

Compliance with Local Zoning Regulations?

Date of Last Regulatory Compliance Audit

Number of Outstanding Regulatory Notices

Description of any Outstanding Regulatory Concerns

Relevant Regulatory Bodies Involved (select all that apply)

Upload Copies of Key Permits and Licenses

Risk Mitigation & Response

12 of 12

Plan detailing risk mitigation strategies and response procedures.

Detailed Mitigation Strategy Description

Estimated Cost of Mitigation

Target Completion Date for Mitigation

Responsible Party for Mitigation

Supporting Documentation (e.g., Contracts, Plans)

Severity Level After Mitigation

Contingency Plan Description (If Mitigation Fails)

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?