Calibration Checklist
Ensure peak performance & regulatory compliance with our comprehensive Calibration Checklist for Manufacturing. Download now & streamline your processes, reduce downtime, & maintain accuracy across your equipment. Perfect for quality control & ISO standards.
This Template was installed 2 times.
Equipment Identification & Information
Verify equipment details and calibration history.
Equipment Name/Description
Manufacturer
Model Number
Serial Number
Asset Tag Number
Date of Last Calibration
Next Calibration Due Date
Location
Any previous issues or notes?
Environmental Conditions
Record and monitor ambient temperature, humidity, and other relevant environmental factors.
Ambient Temperature (°C)
Ambient Temperature (°F)
Relative Humidity (%)
Air Pressure (kPa)
Date of Environmental Measurement
Time of Environmental Measurement
Notes on Environmental Conditions (e.g., drafts, unusual fluctuations)
Calibration Standards
Confirm traceability of calibration standards to national or international standards.
Standard Serial Number
Standard Uncertainty (k=2)
Standard Traceability (e.g., NIST, ISO)
Traceability Details (Specify originating standard)
Standard Calibration Due Date
Standard Calibration Certificate
Standard Condition (As Received)
Preliminary Checks & Warm-up
Perform initial assessments and allow sufficient warm-up time for stable readings.
Equipment Serial Number
Visual Inspection Notes (damage, cleanliness, etc.)
Power Supply Condition
Warm-up Time (minutes)
Warm-up Start Time
Initial Readings / Baseline Measurements (before full calibration)
Equipment Stability Check - Pass/Fail
Calibration Procedure
Execute the detailed calibration procedure as outlined in the manufacturer's instructions or documented method.
Procedure Step 1: Initial Setting & Zeroing
Span Adjustment Value (if applicable)
Zero Adjustment Value (if applicable)
Calibration Method Used (e.g., Relative, Absolute)
Notes on Procedure Execution (e.g., any deviations from standard)
Number of Readings Taken
Calibration Points Used
Attach Calibration Graph (if applicable)
Data Acquisition & Recording
Document readings, measurements, and observations systematically during the calibration process.
Measurement 1 Reading
Measurement 2 Reading
Measurement 3 Reading
Ambient Temperature (°C)
Ambient Humidity (%)
Date of Measurement
Time of Measurement
Notes/Observations During Measurement
Measurement Unit
Tolerance Evaluation
Compare measured values against specified tolerances and determine if the equipment is within acceptable limits.
Measured Value 1
Tolerance Upper Limit (Value 1)
Tolerance Lower Limit (Value 1)
Result of Value 1 (Within Tolerance?)
Explanation/Comments (if Value 1 is out of tolerance)
Measured Value 2
Result of Value 2 (Within Tolerance?)
Explanation/Comments (if Value 2 is out of tolerance)
Adjustment & Correction (If Required)
Perform necessary adjustments to bring the equipment back into calibration. Document adjustments made.
Detailed Description of Adjustment(s) Performed
Adjustment Value 1 (e.g., Offset)
Adjustment Value 2 (e.g., Gain)
Adjustment Method Used (e.g., Software, Manual)
If 'Other' selected above, please specify the adjustment method.
Number of Adjustment Cycles
Confirmation of Adjustment Stability
Date of Adjustment
Time of Adjustment
Technician Signature (Adjustment Confirmation)
Final Verification
Repeat measurements after adjustments to confirm calibration stability and accuracy.
Span Value (Post-Adjustment)
Zero Value (Post-Adjustment)
Linearity Error (Max)
Repeatability Error (Max)
Pass/Fail Result
Comments / Observations (If Applicable)
Date of Final Verification
Time of Final Verification
Technician Signature
Calibration Certificate & Documentation
Generate a calibration certificate with results, dates, and technician information. Maintain complete records.
Certificate Number
Calibration Date
Next Calibration Due Date
Equipment Name
Equipment Model
Equipment Serial Number
Calibration Results Summary
Calibration Data Files
Calibration Technician Signature
Equipment Return & Tagging
Return equipment to its designated location and apply appropriate calibration labels/tags.
Return Location
Equipment Tag Number (Pre-Calibration)
Equipment Tag Number (Post-Calibration)
Return Date
Return Time
Condition Upon Return
Notes on Return/Condition
Technician Signature
Facility Management Solution Screen Recording
Simplify facility management with ChecklistGuro! This screen recording shows how to manage work orders, track assets, and streamline maintenance. See the power of automation! #facilitymanagement #checklistguro #bpm #businessprocessmanagement #maintenance #assetmanagement
Related Checklist Templates
Lease Renewal Checklist
Maintenance Request Checklist
Resident Communication Checklist
Capital Improvement Planning Checklist
Office Opening/Closing Checklist
Operating Room Readiness Checklist
Elevator Maintenance & Safety Checklist
Compressed Air System Inspection Checklist
Swimming Pool & Spa Maintenance Checklist
Dialysis Unit Maintenance Checklist
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.