Lighting Retrofit Assessment Checklist

Unlock energy savings and boost your facility's efficiency! Our Lighting Retrofit Assessment checklist, a vital tool for Facility Managers, guides you through a comprehensive evaluation - from fixture inventory to ROI analysis. Reduce costs, improve lighting quality, and create a sustainable environment. Download now and illuminate your facility's potential!

This Template was installed 4 times.

Initial Assessment & Information Gathering

NaN of 8

Collect background information and initial observations regarding current lighting systems and facility needs.

Project Goals & Objectives

Building Size (sq ft)

Building Type

Date of Last Lighting System Evaluation (if applicable)

Current Lighting System Concerns/Issues (reported by occupants or FM)

Current Lighting Control System (if any)

Contact Person for Lighting Retrofit Project

Approximate Number of Lighting Fixtures

Existing Lighting Inventory & Analysis

NaN of 8

Detailed assessment of existing lighting fixtures, their types, quantities, and operating characteristics.

Fixture ID/Location Number

Fixture Type

Fixture Description (e.g., model number, manufacturer)

Wattage (per fixture)

Number of Fixtures in Area

Lumens Output (estimated or manufacturer's data)

Control Type (if applicable)

Notes/Observations (e.g., condition, issues)

Energy Consumption & Cost Analysis

NaN of 8

Determine current energy usage and associated costs related to lighting.

Current Total Lighting Energy Consumption (kWh/year)

Average Lighting Operating Hours per Year

Current Average Electricity Rate ($/kWh)

Total Annual Lighting Cost ($)

Utility Rate Structure (e.g., Tiered, Demand)

Notes on Utility Billing or Rate Structure (if applicable)

Power Factor of Existing Lighting (if known)

Lighting Level & Quality Evaluation

NaN of 8

Assess the adequacy and quality of existing lighting for intended tasks and occupant comfort.

Foot-candle (Lux) measurement at workstation 1

Foot-candle (Lux) measurement at workstation 2

Foot-candle (Lux) measurement - common area

Lighting Uniformity - Overall Assessment

Color Rendering Index (CRI) - Acceptability

Observed Glare Issues?

Describe any observed issues with light distribution or visual comfort.

Overall occupant satisfaction with existing lighting (scale 1-5, 5 being most satisfied)

Retrofit Options & Technology Review

NaN of 8

Identify and evaluate potential lighting retrofit technologies (LEDs, controls, etc.) and their suitability.

Consideration of LED Technology?

Potential Lighting Control Strategies?

Estimated LED Lumens per Watt (lm/W)

Color Temperature Preference (CCT)?

Notes on Specific Fixture Replacement Opportunities (e.g., high bay, troffer)

Attach Fixture Datasheets (if available)

Financial Analysis & ROI Calculation

NaN of 8

Calculate the return on investment (ROI) for various retrofit scenarios, considering costs and savings.

Estimated Project Cost (Total)

Current Annual Lighting Energy Consumption (kWh)

Current Electricity Rate ($/kWh)

Estimated Annual Energy Savings (kWh)

Estimated Annual Cost Savings ($)

Estimated Rebate/Incentive Amount ($)

Simple Payback Period (Years)

Return on Investment (ROI) (%)

Assumptions & Notes for ROI Calculation

Implementation Planning & Logistics

NaN of 8

Develop a plan for the lighting retrofit project, including scheduling, installation, and disruption management.

Planned Start Date of Retrofit

Planned Completion Date of Retrofit

Estimated Downtime (in hours) per area

Detailed Area Sequencing Plan (how areas will be retrofitted in order)

Safety Precautions Required (check all that apply)

Waste Disposal Method

Contingency Plan for Unexpected Issues

Detailed Retrofit Layout Drawings

Post-Retrofit Verification & Commissioning

NaN of 8

Verify that the retrofit project meets performance goals and ensure proper functionality.

Measured Lighting Levels (Foot-Candles)

Color Temperature Consistency?

Control System Functionality Verified?

Notes on observed issues or deviations from expected performance.

Date of Commissioning Completion

Post-Retrofit Energy Consumption (kWh)

Occupant Feedback Received?

Post-Retrofit Photos/Videos

Found this Checklist Template helpful?

Facility Management Solution

Managing facilities can be overwhelming. ChecklistGuro's Work OS platform offers a complete solution for streamlining maintenance, tracking assets, and improving efficiency. From preventative maintenance to work order management, we're here to simplify your facility operations. Learn how ChecklistGuro can transform your facility management!

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?