Site Assessment & Baseline Data

1 of 11

Initial site evaluation and collection of baseline environmental data.

Project Site Coordinates (Latitude/Longitude)

Date of Site Assessment

Elevation (meters)

Description of Surrounding Land Use

Dominant Vegetation Type

Average Daily Temperature (°C)

Average Annual Precipitation (mm)

Identification of Sensitive Habitats (e.g., wetlands, riparian zones)

Permitting & Regulatory Compliance

2 of 11

Verification of required permits and adherence to environmental regulations.

Environmental Permit Obtained?

Permit Expiration Date

Permit Number

Regulatory Body Oversight

Summary of Permit Conditions

Copy of Environmental Permit

Flora & Fauna Protection

3 of 11

Measures to protect local plant and animal life during construction and operation.

Identify Sensitive Habitats

Detailed Description of Observed Flora

Detailed Description of Observed Fauna

Estimated Area of Habitat Disturbance (hectares)

Mitigation Measures Implemented

Description of Mitigation Strategy Details

Date of Biological Survey

Water Resource Management

4 of 11

Assessment and mitigation of potential impacts on water quality and quantity.

Initial Water Table Level (meters)

Project Water Withdrawal Rate (m³/day)

Estimated Water Consumption (m³/year)

Water Source Type

Water Discharge Method

Last Water Quality Sampling Date

Summary of Water Quality Sampling Results

Soil Erosion & Sediment Control

5 of 11

Strategies to prevent soil erosion and sediment runoff.

Soil Type Assessment

Slope Gradient (degrees)

Rainfall Intensity (estimated)

Description of Existing Vegetation Cover

Erosion Control Methods Implemented

Date of Erosion Control Implementation

Photos of Erosion Control Measures

Air Quality Monitoring

6 of 11

Tracking and minimizing air pollutant emissions.

Background PM2.5 Concentration (µg/m³)

PM2.5 Concentration During Construction (µg/m³)

PM10 Concentration During Operation (µg/m³)

NOx Concentration During Operation (ppm)

Monitoring Equipment Calibration Status

Date of Last Monitoring Event

Time of Monitoring Event

Notes/Observations During Monitoring

Noise Pollution Mitigation

7 of 11

Reducing noise levels to protect surrounding communities and wildlife.

Ambient Noise Level (dB)

Construction Noise Level (dB)

Operational Noise Level (dB)

Noise Barrier Implementation?

Noise Reduction Techniques Used?

Noise Monitoring Start Date

Noise Monitoring Time

Waste Management Plan

8 of 11

Proper handling, storage, and disposal of waste materials.

Estimated Waste Generation (tons/year)

Waste Types Generated

Specify 'Other' Waste Type (if selected)

Waste Disposal Manifests (Upload)

Preferred Waste Disposal Method

Last Waste Disposal Record Date

Hazardous Materials Management

9 of 11

Safe handling and storage of hazardous substances.

List of Hazardous Materials on Site

Quantity of Chemical A (in liters/gallons)

Quantity of Chemical B (in kilograms/pounds)

Storage Container Condition (e.g., Rust, Leaks)

Last Inspection Date of Hazardous Material Storage Area

Attach SDS (Safety Data Sheet) for Key Chemicals

Secondary Containment Present?

Decommissioning & Restoration

10 of 11

Planning for the eventual decommissioning of the project and restoration of the site.

Project Decommissioning Target Date

Detailed Decommissioning Plan Description

Estimated Site Restoration Cost (USD)

Site Restoration Plan Document

Land Use Post-Restoration

Description of Post-Restoration Land Use

Responsible Party Signature (Decommissioning Lead)

Emergency Response Plan

11 of 11

Procedures for responding to environmental emergencies.

Emergency Contact List

Primary Emergency Coordinator

Secondary Emergency Coordinator

Last Emergency Drill Date

Typical Emergency Response Time Estimate

Estimated Evacuation Time (minutes)

Potential Emergency Scenarios

Emergency Response Plan Document