Automated Passenger Counting System (APCS) Functionality
Assess the operation and accuracy of the automated passenger counting system, if installed.
APCS Accuracy Rate (%)
Last APCS System Sync Time
APCS System Status
Number of Malfunctioning Sensors
Last Calibration Date
Description of any Errors/Issues
Data Transmission Method
Manual Passenger Counting Procedures
Evaluate the effectiveness of manual passenger counting methods when automated systems are unavailable or being used in conjunction.
Estimated Passengers Boarding (First 5 Minutes)
Estimated Passengers Alighting (First 5 Minutes)
Method Used for Passenger Count (e.g., Visual Estimation, Tally Counter)
Details of 'Other' Counting Method (If Selected)
Time of Passenger Count
Notes/Observations about Manual Count
Did count match APCS Data (if applicable)?
Driver Load Management Practices
Observe and document driver adherence to load limits and safety protocols during boarding and alighting.
Observed Passenger Count (Boarding)
Maximum Permitted Passenger Capacity
Did Driver Adhere to Load Limits?
Driver Comments on Load Conditions
Were Passengers Properly Instructed?
Time of Observation
Details of any Overcrowding Issues
Passenger Information & Announcements
Review the clarity and timeliness of passenger announcements regarding capacity and service disruptions.
Clarity of Announcements (Capacity)
Timeliness of Announcements (Service Disruptions)
Number of Announcements Regarding Capacity in Last Hour
Language Options Available (If Applicable)
Time of Last Capacity Announcement
Notes on Effectiveness of Announcements
Security & Crowd Control
Assess the implementation of security measures to prevent overcrowding and ensure passenger safety at stops and stations.
Observed Passenger Density at Peak Times
Presence of Crowd Control Barriers/Fencing?
Effectiveness of Staff Presence for Crowd Management
Notes on Staff Interaction with Passengers (Crowd Management)
Location of Recurring Crowd Control Issues (if any)
Date of Last Crowd Control Incident (if applicable)
Detailed Observations Regarding Crowd Behavior and Potential Risks
Real-Time Passenger Data Reporting
Evaluate the accuracy and timeliness of passenger load data reported to central control or relevant departments.
Reporting Interval (minutes)
Average Passenger Count Reported
Reporting Accuracy (%)
Reporting System Used
Last Data Transmission Date
Last Data Transmission Time
Notes on Data Transmission Issues (if any)
Equipment Maintenance & Calibration
Verify the scheduled maintenance and calibration of passenger counting equipment, including any electronic components.
Last Calibration Date
Calibration Counter Reading
Calibration Start Time
Infrared Sensor Accuracy (%),
Calibration Method Used
Calibration Certificate/Report (Optional)
Notes/Observations during Calibration
Compliance with Regulations
Ensure adherence to local and regional regulations concerning passenger load limits and safety standards.
Maximum Passenger Capacity (as per regulation)
Relevant Regulatory Body
Summary of Applicable Regulations
Date of Last Regulatory Review
Regulations Currently in Effect (Select all that apply)
Copy of Current Regulatory Documents
Incident Reporting & Review
Assess the process for reporting and reviewing incidents related to passenger load issues or overcrowding.
Date of Incident
Time of Incident
Detailed Description of Incident
Estimated Number of Passengers Involved
Severity Level (e.g., Minor, Moderate, Major)
Contributing Factors (Select all that apply)
Actions Taken to Mitigate Situation
Supporting Documentation (Photos, Videos, etc.)
Incident Location (GPS Coordinates)
Recommendations for Preventative Measures
Staff Training and Awareness
Evaluate the extent of training provided to drivers and other relevant staff on passenger counting and load management procedures.
Has driver received initial passenger counting training?
Date of last passenger counting refresher training
Number of staff trained on passenger counting procedures
Topics covered in passenger counting training:
Briefly describe the content of the staff training program.
Are visual aids (posters, videos) used to reinforce passenger counting best practices?
Upload copy of training materials (e.g., manual, presentation)
Public Transport Reporting Solution Screen Recording
Check out our public transport reporting solution in action! This screen recording showcases the key features and functionality, making it easy to understand how our system helps transit agencies and commuters. #public-transport #reporting #transit #passanger #data #analytics
Related Checklist Templates
Public Transport Noise Reduction Measures Audit Checklist Template
Train Signal System Inspection Checklist Template
Bus Route Deviation and Stop Accuracy Audit Checklist - Public Transit
Public Transport Accessibility for Passengers with Disabilities Audit Checklist Template
Tram Switchgear and Interlocking System Inspection Checklist Template
Bus Fleet Vehicle Washing & Maintenance Audit Checklist - Public Transit
Public Transport Real-Time Information System Audit Checklist Template
Train Level Crossing Safety Inspection Checklist Template
Bus Fleet Air Quality Emissions Audit Checklist - Public Transit
Public Transport Security Camera System Checklist Template
We can do it Together
Need help with Checklists?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.