ChecklistGuro logo ChecklistGuro Solutions Industries Resources Pricing

WMS Automation Maintenance Checklist

Ensure peak performance and minimize downtime with our comprehensive WMS Automation Maintenance Checklist. This essential guide helps you systematically verify and optimize your warehouse automation, preventing costly errors and keeping your WMS running smoothly. Download now and safeguard your operational efficiency!

This Template was installed 0 times.

System Hardware

1 of 10

Checks related to the physical components supporting the WMS automation.

Server CPU Utilization (%)

Server RAM Usage (GB)

Disk Space Available (GB)

Last Hardware Inspection Date

Notes on Hardware Condition

UPS Status

Hardware Inventory Record

Network Connectivity

2 of 10

Verification of stable and secure network connections for all automated processes.

Network Bandwidth (Mbps)

Ping Time (ms)

Packet Loss (%)

Network Security Protocol (e.g., TLS 1.3)

Last Network Scan Date

Network Configuration Notes

Automated Equipment (e.g., Conveyors, AS/RS)

3 of 10

Routine inspections and maintenance for specific automated equipment.

Last Conveyor Belt Inspection Date

Conveyor Belt Speed (m/s)

AS/RS Lift Height (m)

Description of any unusual noises observed during inspection

Condition of Sensors (e.g., photoelectric, proximity)

Supporting Photos/Videos of Equipment Condition

Scheduled Downtime for Preventative Maintenance

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Robotics and AGV Systems

4 of 10

Maintenance and calibration checks for robotic and automated guided vehicle (AGV) operations.

AGV Battery Voltage (V)

Robot Joint Temperature (°C)

Last Calibration Date

Last Emergency Stop Event Time

0:00
0:15
0:30
0:45
1:00
1:15
1:30
1:45
2:00
2:15
2:30
2:45
3:00
3:15
3:30
3:45
4:00
4:15
4:30
4:45
5:00
5:15
5:30
5:45
6:00
6:15
6:30
6:45
7:00
7:15
7:30
7:45
8:00
8:15
8:30
8:45
9:00
9:15
9:30
9:45
10:00
10:15
10:30
10:45
11:00
11:15
11:30
11:45
12:00
12:15
12:30
12:45
13:00
13:15
13:30
13:45
14:00
14:15
14:30
14:45
15:00
15:15
15:30
15:45
16:00
16:15
16:30
16:45
17:00
17:15
17:30
17:45
18:00
18:15
18:30
18:45
19:00
19:15
19:30
19:45
20:00
20:15
20:30
20:45
21:00
21:15
21:30
21:45
22:00
22:15
22:30
22:45
23:00
23:15
23:30
23:45

Notes on Unusual Behavior/Events

AGV/Robot Operational Status

Upload Diagnostic Logs

Software Updates and Patches

5 of 10

Ensuring all software components are up-to-date and secure.

Last Software Update Date

Version Number of Current Software

Description of Software Updates Applied

Update Source (e.g., Vendor, Internal)

Upload Installation Logs (if available)

Scheduled Next Software Update Date

Integration Points

6 of 10

Testing and validation of interfaces between the WMS and other systems (e.g., ERP, Shipping).

ERP System Integration Status

Last Data Synchronization Time (minutes)

Last Successful Data Transfer Date

Description of any synchronization errors encountered

Shipping Carrier Integration Status

Integration Error Logs (if applicable)

Backup and Recovery

7 of 10

Confirmation of regular backups and functionality of disaster recovery procedures.

Last Full Backup Date

Backup Retention Period (in days)

Backup Type

Recovery Test Notes (Date, Process, Results)

Last Disaster Recovery Drill Date

Recovery Point Objective (RPO)

Recovery Time Objective (RTO)

Security Checks

8 of 10

Verification of access controls and security protocols within the automated systems.

Last Password Reset Date (Days Ago)

Multi-Factor Authentication Enabled?

Access Restrictions Applied?

Last Security Audit Date

Firewall Rules Reviewed?

Performance Monitoring

9 of 10

Review of system logs and performance metrics to identify potential bottlenecks or errors.

Average Order Processing Time (seconds)

Throughput (Orders/Hour)

System CPU Utilization (%)

Database Query Response Time (ms)

Summary of Recent System Logs (Errors/Warnings)

Last Performance Review Date

Overall System Health (Based on Metrics)

User Training and Documentation

10 of 10

Confirmation that users are properly trained and documentation is up-to-date.

Number of Users Trained (Initial)

Date of Last Training Session

Summary of Training Content Covered

Topics Covered in Training (Select All)

Upload Training Materials (e.g., Manuals, Presentations)

Training Method Used

Number of Users Requiring Refresher Training

Warehouse Management System (WMS) Screen Recording

See ChecklistGuro's Warehouse Management System (WMS) in action! This screen recording provides a quick look at key features, from receiving and putaway to picking, packing, and shipping. Learn how ChecklistGuro can streamline your warehouse operations and boost efficiency. #WMS #WarehouseManagement #ChecklistGuro #InventoryManagement #BPM

Related Checklist Templates

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?