Facility Inspection and Auditing Process

Streamline your facility management with our comprehensive Facility Inspection and Auditing Process. Master the art of proactive maintenance, ensure regulatory compliance, and eliminate operational risks with a structured workflow designed to optimize building safety, asset longevity, and seamless onsite inspections.

Start
1. Fetch Facility Master Data
2. Initialize Inspection Record
3. Assign Physical Inspection Task
4. Log Inspection Findings
5. Retrieve Compliance Checklist
6. Calculate Compliance Score
7. Generate Non-Conformance Report (NCR)
8. Assign Remediation Task
9. Update Inspection Status
10. Summarize Total Findings
11. Notify Management of Critical Failures
12. Generate Final Audit Report
13. Send Audit Summary to Site Manager
14. Close Inspection Record
End

Start of the Workflow/Process.

Retrieve the list of all facilities and their associated site managers from the Facility Data Model.

Create a new entry in the 'Inspections' data model to track the current audit instance.

Create a task for the assigned Field Auditor to perform the on-site walkthrough.

Update the Inspection entry with observations, photos, and notes captured during the audit.

Fetch the specific regulatory requirements and safety checklists tied to the facility type.

Execute a formula to calculate the percentage of passed vs. failed items in the audit.

If a failure is detected, create a new entry in the 'Defects/Non-Conformance' data model.

Create a task for the Facility Manager to address the identified non-conformance items.

Update the main Inspection entry status to 'Review Required' or 'Closed'.

Aggregate all 'Defect' entries linked to this inspection to count total critical failures.

Send an automated email to the Operations Director if the Compliance Score falls below the threshold.

Create a comprehensive PDF/Report summarizing the inspection results, photos, and findings.

Send the completed Audit Report and any pending remediation tasks to the site manager's email.

Update the Inspection entry to 'Completed' and lock it from further editing.

End of the Workflow/Process.