Start of the Workflow/Process.
1. Retrieve Production Data
Fetch production data from the MES system for the previous shift.
2. Calculate OEE
Aggregate data to calculate Overall Equipment Effectiveness (OEE).
3. Calculate Yield Rate
Aggregate data to calculate the yield rate for the production run.
4. Get Planned Production Schedule
Retrieve the planned production schedule for comparison.
5. Calculate Variance from Plan
Calculate the difference between actual and planned production quantities.
6. Calculate Downtime Duration
Calculate total downtime duration based on recorded downtime events.
7. Log Performance Metrics
Create an entry in the performance metrics data model with calculated metrics.
8. Assign Review Task
Create a task for the production supervisor to review performance metrics.
9. Notify Supervisor of Key Deviations
Send an email to the production supervisor if OEE falls below a threshold.
10. Retrieve Previous Shift Performance
Get the performance data from the previous shift to enable comparison.
11. Generate Performance Report
Create a report summarizing the current shift's performance.
12. Assign Root Cause Analysis Task (if needed)
Create a task for engineering if performance falls outside acceptable parameters.
13. Update Shift Status
Update the status of the current shift in the system.
End
Start of the Workflow/Process.
Start of the Workflow/Process.
Fetch production data from the MES system for the previous shift.
Aggregate data to calculate Overall Equipment Effectiveness (OEE).
Aggregate data to calculate the yield rate for the production run.
Retrieve the planned production schedule for comparison.
Calculate the difference between actual and planned production quantities.
Calculate total downtime duration based on recorded downtime events.
Create an entry in the performance metrics data model with calculated metrics.
Create a task for the production supervisor to review performance metrics.
Send an email to the production supervisor if OEE falls below a threshold.
Get the performance data from the previous shift to enable comparison.
Create a report summarizing the current shift's performance.
Create a task for engineering if performance falls outside acceptable parameters.
Update the status of the current shift in the system.
Start of the Workflow/Process.
Found this Workflow Template helpful?
Manufacturing Management Solution Demo
Stop chasing paperwork and wrestling with disconnected systems! Our solution brings clarity and control to your production process. From standard operating procedures (SOPs) and equipment maintenance to quality control and inventory tracking, we simplify every step.
Related Workflow Templates

Waste Management Workflow for Manufacturing Processes

Packaging and Labeling Workflow for Manufacturing

Material Requirements Planning (MRP) Workflow for Manufacturers

Tooling Management Workflow for Manufacturing

Manufacturing Safety Incident Reporting Workflow

Manufacturing Deviation Management Workflow

Production Data Analysis & Reporting Workflow

Manufacturing Quality Inspection Workflow
We can do it Together
Need help with
Manufacturing?
Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.