Brewery Equipment Maintenance Checklist Template

Keep your brewery running smoothly & consistently with our comprehensive Brewery Equipment Maintenance Checklist Template! Prevent costly downtime & ensure top-quality beer production. Download now and simplify your maintenance schedule.

This Template was installed 2 times.

Display Style

Boiling Kettle & Related Systems

1 of 10

Covers the kettle, pumps, valves, and associated controls.

Kettle Pressure (PSI)

Steam Flow Rate (lbs/hr)

Boil Temperature (°F)

Burner Flame Appearance

Valve Leakage

Last Inspection Date (Burner)

Notes on Kettle Performance

Mash Tun & Lauter Tun

2 of 10

Focuses on the mash tun, lauter tun, and related components for wort extraction.

Mash Tun Temperature (°F)

Lauter Tun Sparge Water Temperature (°F)

Lauter Tun False Bottom Condition

Observations & Notes

Last False Bottom Cleaning Date

Lauter Tun Drainage Time (minutes)

Mash Tun Heating Element Condition

Fermentation Vessels

3 of 10

Includes inspection and maintenance of fermentation tanks, temperature control systems, and related components.

Tank Pressure (PSI)

Temperature (Fahrenheit)

Last CIP Date

Observation Time

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Notes on Fermentation Progress/Observations

Temperature Control Functioning?

Photo of Tank Interior (if applicable)

Filtration & Clarification Equipment

4 of 10

Covers filters, centrifuges, and other clarification equipment.

Filter Pressure (PSI)

Backwash Flow Rate (GPM)

Last Filter Element Change Date

Description of any unusual observations during operation

Filter Element Condition

Photos of Filter Condition (Optional)

Centrifuge Speed (RPM)

Packaging Line (Bottling/Canning)

5 of 10

Includes inspection and maintenance of fillers, labelers, cappers, and conveyors.

Bottling Speed (bottles/min)

Last Belt Inspection Date

Fill Volume Deviation (ml)

Bottle/Can Quality (Visual)

Issues Observed

Last Line Cleaning Time

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Number of Rejected Bottles/Cans

CIP (Clean-In-Place) System

6 of 10

Focuses on the CIP system's functionality, nozzles, and chemical usage.

Last CIP Cycle Date

CIP Cycle Start Time

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Caustic Concentration (%)

Acid Concentration (%)

CIP Chemical Type

Notes on CIP Cycle (e.g., unusual observations)

Nozzle Performance

Photo of Nozzle Configuration

Glycol Chiller System

7 of 10

Maintenance checks for the glycol chiller, pumps, and distribution system.

Chiller Inlet Temperature (°F)

Chiller Outlet Temperature (°F)

Condenser Pressure (PSI)

Suction Pressure (PSI)

Refrigerant Level (lbs/oz)

Last Refrigerant Top-Up Date

Notes/Observations

Chiller Performance

Compressed Air System

8 of 10

Includes air compressor, lines, filters, and regulators.

Compressor PSI Reading

Tank Pressure Reading

Air Filter Differential Pressure (in H2O)

Air Compressor Oil Level

Last Filter Replacement Date

Last Drain Valve Cycle Time

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Any Unusual Noises or Observations?

Electrical Systems

9 of 10

General electrical checks, panel inspections, and motor maintenance.

Panel Voltage (V)

Motor Insulation Resistance (Meg Ohms)

Last Electrical Safety Inspection Date

Panel Condition (Visual Inspection)

Notes on Wiring Condition

Motor Amperage (Current)

Time of Motor Start/Stop (if applicable)

12:00 AM
12:30 AM
1:00 AM
1:30 AM
2:00 AM
2:30 AM
3:00 AM
3:30 AM
4:00 AM
4:30 AM
5:00 AM
5:30 AM
6:00 AM
6:30 AM
7:00 AM
7:30 AM
8:00 AM
8:30 AM
9:00 AM
9:30 AM
10:00 AM
10:30 AM
11:00 AM
11:30 AM
12:00 PM
12:30 PM
1:00 PM
1:30 PM
2:00 PM
2:30 PM
3:00 PM
3:30 PM
4:00 PM
4:30 PM
5:00 PM
5:30 PM
6:00 PM
6:30 PM
7:00 PM
7:30 PM
8:00 PM
8:30 PM
9:00 PM
9:30 PM
10:00 PM
10:30 PM
11:00 PM
11:30 PM

Pumps & Valves

10 of 10

Inspection and lubrication of all pumps and valves throughout the brewery.

Pump 1 Flow Rate (GPM)

Pump 1 Motor RPM

Valve 1 Pressure (PSI)

Valve 1 Operation (Open/Closed/Partially Open)

Valve 1 Leakage Observations

Last Lubrication Date (Pump 2)

Valve 3 Stem Backlash (inches)

Pump 4 Noise Level (Normal/Audible/Excessive)

More about this Template Maintenance Management

Frequently Asked Questions

Can I customize this template after installing it?

Absolutely. Once installed, you can add, remove, or reorder tasks, add custom fields, and adjust deadlines to fit your specific workflow.


Can I add images or photos to these checklist items?

Yes. Our platform allows you to attach photos, signatures, and notes to any checklist item for better verification and proof of completion.


Can I create a custom checklist from scratch instead of using a template?

Yes. You can use our "Create your own checklist" feature to build a unique workflow tailored exactly to your operational requirements.


Can I add dependencies between tasks?

Yes, you can set up conditional logic and dependencies to ensure your team follows the correct sequence of operations.


Can I assign specific checklist items to different team members?

Yes. You can assign individual tasks to specific employees, ensuring clear accountability across your entire team.


Can I use these checklists on mobile devices in the field?

Yes. Our platform is fully responsive, allowing your team to complete, update, and upload photos to checklists directly from any smartphone or tablet.


How do I notify my manager when a checklist is completed?

You can set up automated notifications (via email, push notification, or in-app alerts) to trigger whenever a checklist is finished or if an item fails inspection.


Can multiple people work on the same checklist simultaneously?

Yes, the platform supports real-time updates, allowing multiple users to contribute to a single live checklist.


Where is the data from completed checklists stored?

All completed checklists are stored securely in your Work OS dashboard, creating a permanent, searchable audit trail of your operations.


Can I generate reports based on my checklist results?

Yes. You can track completion rates, identify recurring issues, and monitor team performance through our integrated reporting and analytics tools.


How can I use these checklists for compliance or auditing purposes?

Because our checklists capture timestamps, photos, and digital signatures, they serve as a robust digital paper trail for regulatory compliance and internal audits.


Can I export my completed checklist data for use in other tools?

Yes. You can export your data in various formats (CSV, Excel, etc.) to integrate your operational insights with your other business software.


Summarize and Analyze this checklist template with

Comments

There are no comments yet. Be the first to add one!


Maintenance Management Solution Demo

Maximize equipment uptime & reduce costs! ChecklistGuro streamlines maintenance scheduling, work order management, & asset tracking. Prevent breakdowns, optimize performance, & extend equipment life. Manage it all with our Work OS.

Related Checklist Templates

Need help with
Maintenance Management?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email
How can we help?