Brewery Equipment Maintenance Checklist Template

Keep your brewery running smoothly & consistently with our comprehensive Brewery Equipment Maintenance Checklist Template! Prevent costly downtime & ensure top-quality beer production. Download now and simplify your maintenance schedule.

This Template was installed 5 times.

Boiling Kettle & Related Systems

1 of 10

Covers the kettle, pumps, valves, and associated controls.

Kettle Pressure (PSI)

Steam Flow Rate (lbs/hr)

Boil Temperature (°F)

Burner Flame Appearance

Valve Leakage

Last Inspection Date (Burner)

Notes on Kettle Performance

Mash Tun & Lauter Tun

2 of 10

Focuses on the mash tun, lauter tun, and related components for wort extraction.

Mash Tun Temperature (°F)

Lauter Tun Sparge Water Temperature (°F)

Lauter Tun False Bottom Condition

Observations & Notes

Last False Bottom Cleaning Date

Lauter Tun Drainage Time (minutes)

Mash Tun Heating Element Condition

Fermentation Vessels

3 of 10

Includes inspection and maintenance of fermentation tanks, temperature control systems, and related components.

Tank Pressure (PSI)

Temperature (Fahrenheit)

Last CIP Date

Observation Time

Notes on Fermentation Progress/Observations

Temperature Control Functioning?

Photo of Tank Interior (if applicable)

Filtration & Clarification Equipment

4 of 10

Covers filters, centrifuges, and other clarification equipment.

Filter Pressure (PSI)

Backwash Flow Rate (GPM)

Last Filter Element Change Date

Description of any unusual observations during operation

Filter Element Condition

Photos of Filter Condition (Optional)

Centrifuge Speed (RPM)

Packaging Line (Bottling/Canning)

5 of 10

Includes inspection and maintenance of fillers, labelers, cappers, and conveyors.

Bottling Speed (bottles/min)

Last Belt Inspection Date

Fill Volume Deviation (ml)

Bottle/Can Quality (Visual)

Issues Observed

Last Line Cleaning Time

Number of Rejected Bottles/Cans

CIP (Clean-In-Place) System

6 of 10

Focuses on the CIP system's functionality, nozzles, and chemical usage.

Last CIP Cycle Date

CIP Cycle Start Time

Caustic Concentration (%)

Acid Concentration (%)

CIP Chemical Type

Notes on CIP Cycle (e.g., unusual observations)

Nozzle Performance

Photo of Nozzle Configuration

Glycol Chiller System

7 of 10

Maintenance checks for the glycol chiller, pumps, and distribution system.

Chiller Inlet Temperature (°F)

Chiller Outlet Temperature (°F)

Condenser Pressure (PSI)

Suction Pressure (PSI)

Refrigerant Level (lbs/oz)

Last Refrigerant Top-Up Date

Notes/Observations

Chiller Performance

Compressed Air System

8 of 10

Includes air compressor, lines, filters, and regulators.

Compressor PSI Reading

Tank Pressure Reading

Air Filter Differential Pressure (in H2O)

Air Compressor Oil Level

Last Filter Replacement Date

Last Drain Valve Cycle Time

Any Unusual Noises or Observations?

Electrical Systems

9 of 10

General electrical checks, panel inspections, and motor maintenance.

Panel Voltage (V)

Motor Insulation Resistance (Meg Ohms)

Last Electrical Safety Inspection Date

Panel Condition (Visual Inspection)

Notes on Wiring Condition

Motor Amperage (Current)

Time of Motor Start/Stop (if applicable)

Pumps & Valves

10 of 10

Inspection and lubrication of all pumps and valves throughout the brewery.

Pump 1 Flow Rate (GPM)

Pump 1 Motor RPM

Valve 1 Pressure (PSI)

Valve 1 Operation (Open/Closed/Partially Open)

Valve 1 Leakage Observations

Last Lubrication Date (Pump 2)

Valve 3 Stem Backlash (inches)

Pump 4 Noise Level (Normal/Audible/Excessive)

We can do it Together

Need help with Checklists?

Have a question? We're here to help. Please submit your inquiry, and we'll respond promptly.

Email Address
How can we help?